|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 11/30/2023 Measured TD: 7263 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 11/30/2023 | | Wellbore Permit | | | Permit #: | 20030334 | Expiration Date: | 3/5/2004 | | Proposed Depth/Form: | 7300 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2 |
| | |
| Wellbore Completed | | Completion Date: | 9/2/2003 | | Spud Date: | 3/22/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 7263 ft. | Measured PB depth: | 7231 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIGLGR, CDCNGR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 663 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 465, Top: 0 ft., Bottom: 663 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7260 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 415, Top: 2590 ft., Bottom: 7260 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6822 ft. | | N | N | | CODELL | 7100 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 6/1/2022 Interval Top: 7102 ft. Interval Bottom: 7118 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/16/2003 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7102 ft. | # Of Holes: | 44 | | Interval Bottom: | 7118 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/30/2023 Interval Top: 6825 ft. Interval Bottom: 7118 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/16/2003 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/6/2006 | | Treatment Summary: | 119,499 GALS FLUID & 261,900 LBS 30/50 SAND. CODELL PERF'D AT 7102-7118' AND 7104-7116'. NIOBRARA @ 6825-6883'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 7 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 15857 | | CALC_MCF_GAS | 111 | | CASING_PRESS | 1384 | | GRAVITY_OIL | 50 | | MCF_GAS | 111 | | TUBING_PRESS | 825 |
| | Perforation Data: | | Interval Top: | 6825 ft. | # Of Holes: | 157 | | Interval Bottom: | 7118 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 6/1/2022 Interval Top: 6825 ft. Interval Bottom: 6982 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/16/2003 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/7/2007 | | Treatment Summary: | 172,009 GALS FLUID & 250,000 LBS 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1289 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 26 | | CALC_GOR | 11885 | | CALC_MCF_GAS | 309 | | CASING_PRESS | 950 | | GRAVITY_OIL | 52 |
| | Perforation Data: | | Interval Top: | 6825 ft. | # Of Holes: | 113 | | Interval Bottom: | 6982 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/30/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|