|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/12/2016 Measured TD: 8180 ft. Vertical TD: 7891 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/12/2016 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20083757 | Expiration Date: | 7/29/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 636 FSL 551 FEL | | Bottom Hole Location: | Sec:34 Twp: 2N 65W | Footage: 636 FSL 551 FEL | | Proposed Depth/Form: | 8180 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2SE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1049 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 685, Top: 0 ft., Bottom: 1049 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8167 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 6600 ft., Bottom: 8167 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/21/2003 | | Spud Date: | 4/26/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 8180 ft. | Measured PB depth: | 8137 ft. | | True Vertical TD: | 7891 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 636 FSL 551 FEL | | Bottom Hole Location: | Sec:34 Twp: 2N 65W | Footage: 636 FSL 551 FEL | | Log Types: | PEAILC, PECNLD, PEMLGR, PECPCV, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1049 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 685, Top: 0 ft., Bottom: 1049 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8167 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 6600 ft., Bottom: 8167 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4688 ft. | | N | N | | SHANNON | 5210 ft. | | N | N | | NIOBRARA | 7225 ft. | | N | N | | FORT HAYS | 7526 ft. | | N | N | | CODELL | 7556 ft. | | N | N | | J SAND | 7994 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/12/2016 Interval Top: 7998 ft. Interval Bottom: 8035 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/2/2003 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/19/2013 | Treatment End Date: | N/A | | Treatment Summary: | CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB-CD PRODUCTION. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 5/21/2003 | | Treatment Summary: | 2000 LBS OF 20/40 SAND ACROSS THE J SAND. 7800-8137 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 2 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 81000 | | CALC_MCF_GAS | 162 | | CASING_PRESS | 600 | | GRAVITY_OIL | 60 | | MCF_GAS | 162 | | TUBING_PRESS | 175 |
| | Perforation Data: | | Interval Top: | 7998 ft. | # Of Holes: | 90 | | Interval Bottom: | 8035 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 10/13/2011 Interval Top: 7552 ft. Interval Bottom: 7566 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/21/2008 | | Treatment Summary: | 169,672 GAL FLUID, 115,440 LBS OF 40/70 SAND, 4,000 LBS SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7552 ft. | # Of Holes: | 56 | | Interval Bottom: | 7566 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/30/2013 Interval Top: 7320 ft. Interval Bottom: 8035 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 8/21/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/30/2013 | Treatment End Date: | N/A | | Treatment Summary: | CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB-CD PRODUCTION. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7989 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/30/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1250 | | CASING_PRESS | 1314 | | GRAVITY_OIL | 47 | | TUBING_PRESS | 215 |
| | Perforation Data: | | Interval Top: | 7320 ft. | # Of Holes: | 206 | | Interval Bottom: | 8035 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/12/2016 Interval Top: 7320 ft. Interval Bottom: 7566 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/1/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/1/2011 | | Treatment Summary: | Refrac CD w/270,858 gal SW containing 208,100# 40/70 sand and 4000# 20/40 resin coated sand at avg 61.0 bpm & 4419 psi. | | Formation Treatment | | Treatment Date: | 5/21/2003 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7507 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/11/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 13 | | BTU_GAS | 1325 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 1846 | | CALC_MCF_GAS | 24 | | CASING_PRESS | 1030 | | GRAVITY_OIL | 48 | | MCF_GAS | 24 | | TUBING_PRESS | 570 |
| | Perforation Data: | | Interval Top: | 7320 ft. | # Of Holes: | 116 | | Interval Bottom: | 7566 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/13/2011 Interval Top: 7320 ft. Interval Bottom: 7404 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/21/2008 | | Treatment Summary: | PERF INTERVALS: 'B' 7320-7332, 'C' 7396-7404. 70,000 GAL FLUID, 103,252 GAL GELLED FLUID, 250,120 LBS OF 20/40 SAND, 4,000 LBS OF 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7320 ft. | # Of Holes: | 60 | | Interval Bottom: | 7404 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/12/2016 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|