Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21371
Well Classification: GW Status: TA - 5/3/2021
Well Name/No:MONSON #14-20 D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date5/3/2021
FacilityID:266489LocationID:331835
County:WELD #123Location:SWSW 20 6N65W 6
Field:WATTENBERG - #90750Elevation:4725 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:316FSL  855 FWLLat/Long: 40.467104 / -104.693770Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.467170 / -104.693750Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 5/3/2021             Measured TD: 7432 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 5/3/2021
Wellbore Permit
Permit #:20030301 Expiration Date:3/3/2004
Proposed Top PZ Location:Sec:20 Twp: 6N 65W Footage: 500 FSL  820 FWL
Bottom Hole Location:Sec:20 Twp: 6N 65W Footage: 500 FSL  820 FWL
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318 , Unit Acreage: 80, Drill Unit: W/2

Wellbore Completed
Completion Date:N/A
Spud Date:3/7/2003Spud Date Is:ACTUAL
Measured TD:7432 ft.Measured PB depth:7386 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:20 Twp: 6N 65WFootage: 500 FSL  820 FWL
Bottom Hole Location:Sec:20 Twp: 6N 65WFootage: 500 FSL  820 FWL
Log Types:GR, IND, DENSITY, NEUTRON, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 409 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 409 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7386 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 3072 ft., Bottom: 7386 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3072 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 210, Top: 0 ft., Bottom: 3072 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 3135 ft., Bottom: 3135 ft., Sacks: 500, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2155 ft.NN
PARKMAN3691 ft.NN
SUSSEX4118 ft.NN
SHANNON4412 ft.NN
NIOBRARA6857 ft.NN
FORT HAYS7115 ft.NN
CODELL7165 ft.NN
CARLILE7190 ft.NN
GREENHORN7218 ft.NN

Formation CODL                     Formation Classification:  OG                     Status:  CM - 3/12/2012                 Interval Top: 7168 ft.    Interval Bottom: 7176 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/24/2012
Treatment Summary:Re-perf'd Codell, Re-Frac'd Codell w/ 119 bbl Active pad, 595 bbls of 24# pHaser pad, 1987 bbls of 24# pHaser, 218540 # 20/40 Preferd Rock , 8000# 20/40 SB Excel.
Formation Treatment
Treatment Date:4/2/2003
Treatment Summary:4/2/03 BJ SERVICES FRACED WITH 2698 BBL OF 20# VISTAR GEL, 217,420# OF 20/40 MESH SAND AND 8,000# OF 20/40 SUPER LC RESIN SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 30
CASING_PRESS 2600
MCF_GAS 100
Perforation Data:
Interval Top:7168 ft.# Of Holes:24
Interval Bottom:7176 ft.Hole Size:0.40625 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  TA - 5/3/2021                  Interval Top: 6873 ft.    Interval Bottom: 7176 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/14/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 46
BTU_GAS 1313
CALC_BBLS_H2O 8
CALC_BBLS_OIL 46
CALC_GOR 1870
CALC_MCF_GAS 86
CASING_PRESS 1202
GRAVITY_OIL 55
MCF_GAS 86
TUBING_PRESS 655
Perforation Data:
Interval Top:6873 ft.# Of Holes:52
Interval Bottom:7176 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 6/5/2012                  Interval Top: 6873 ft.    Interval Bottom: 7016 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/24/2012
Treatment Summary:Perf'd Niobrara "A" 6873-6875' (4 holes), Niobrara "B" 7008-7016 (24 holes) ReFrac'd Niobrara with 119 bbl FE-1A pad, 500 bbls of Slickwater pad, 900 bbls of pHaser 24# pad, 432 bbl 20/40 slurry w/ 24# pHaser, 2255 bbls of pHaser 26# fluid system and 239960# of 20/42 Preferred Rock, 12000 # 20/40 SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6873 ft.# Of Holes:28
Interval Bottom:7016 ft.Hole Size:0.375 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
12/06/2022
Defined Inactive (TA)YLast Production
02/28/2017
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No