Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21362
Well Classification: OW Status: PA - 4/21/2023
Well Name/No:RASMUSSEN #12-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/21/2023
FacilityID:266406LocationID:333145
County:WELD #123Location:SENW 28 2N68W 6
Field:WATTENBERG - #90750Elevation:4934 ft.
Planned Location:1962FNL  1760 FWLLat/Long: 40.111500 / -105.011420Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.111520 / -105.011406Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/25/2013
End Date: 4/25/2013
Reported: 6/27/2013
Days to report: 63
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 4/21/2023             Measured TD: 7937 ft.    Vertical TD: 7827 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 4/21/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/12/2015
Proposed Top PZ Location:Sec:28 Twp: 2N 68W Footage: 2069 FNL  639 FWL
Bottom Hole Location:Sec:28 Twp: 2N 68W Footage: 2058 FNL  623 FWL
Proposed Depth/Form:8248 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8248 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 7213 ft., Bottom: 8248 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5118 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 150, Top: 4098 ft., Bottom: 5118 ft.

Wellbore Completed
Completion Date:4/2/2013
Spud Date:3/29/2013Spud Date Is:ACTUAL
Measured TD:7937 ft.Measured PB depth:7894 ft.
True Vertical TD:7827 ft.True Vertical PB depth:7784 ft.
Top PZ Location:Sec:28 Twp: 2N 68WFootage: 2069 FNL  639 FWL
Bottom Hole Location:Sec:28 Twp: 2N 68WFootage: 2058 FNL  623 FWL
Log Types:Cement Bond .las,
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 838 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 850 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7927 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 625, Top: 722 ft., Bottom: 7937 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4372 ft.
NIOBRARA7437 ft.
CODELL7693 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/4/2014                  Interval Top: 7694 ft.    Interval Bottom: 7710 ft.

 Completed Information for Formation CODELL
1st Production Date:6/21/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/21/2013Treatment End Date:4/21/2013
Treatment Summary:Frac Codell with 110,000# 40/70 with 112,434 gals SLF - 4/21/2013
Total fluid used in treatment (bbls):3164Max pressure during treatment (psi):4680
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):2677Total flowback volume recovered (bbls):827
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):110000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7694 ft.# Of Holes:48
Interval Bottom:7710 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/21/2023                 Interval Top: 7456 ft.    Interval Bottom: 7710 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/21/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/21/2013Treatment End Date:4/25/2013
Treatment Summary:Drill up Kill plug @7300'. Continue in hole to next CFP @ 7589' Drill up plug and continue past Codell Perfs @ 7710'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7680 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/15/2013Test Method:Sold
Hours Tested:22Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 31
BBLS_OIL 108
BTU_GAS 1148
CALC_BBLS_H2O 34
CALC_BBLS_OIL 118
CALC_GOR 4509
CALC_MCF_GAS 531
CASING_PRESS 1534
GRAVITY_OIL 51
MCF_GAS 487
TUBING_PRESS 923
Perforation Data:
Interval Top:7456 ft.# Of Holes:120
Interval Bottom:7710 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/4/2014                  Interval Top: 7456 ft.    Interval Bottom: 7474 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/21/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/25/2013Treatment End Date:4/25/2013
Treatment Summary:Set CFP @ 7515, perforate Niborara Frac Niobrara with 123,539# 40/70 with 120,582 SLF
Total fluid used in treatment (bbls):3242Max pressure during treatment (psi):5680
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):2871Total flowback volume recovered (bbls):827
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):123582Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7456 ft.# Of Holes:74
Interval Bottom:7474 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/21/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No