|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 11/30/2020 Measured TD: 7378 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 11/30/2020 | | Wellbore Permit | DRIFTED | | Permit #: | 20030140 | Expiration Date: | 2/23/2004 | | Proposed Depth/Form: | 7550 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318A , Unit Acreage: 80, Drill Unit: E/2 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 10/12/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 7378 ft. | Measured PB depth: | 7343 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR, IND, DENSITY, NEUTRON, CBL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 406 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 285, Top: 0 ft., Bottom: 406 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7343 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 440, Top: 3492 ft., Bottom: 7343 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2720 ft. | | N | N | | PARKMAN | 3690 ft. | | N | N | | SUSSEX | 4220 ft. | | N | N | | SHANNON | 4560 ft. | | N | N | | NIOBRARA | 6840 ft. | | N | N | | FORT HAYS | 7095 ft. | | N | N | | CODELL | 7142 ft. | | N | N | | CARLILE | 7172 ft. | | N | N | | GREENHORN | 7215 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 9/24/2020 Interval Top: 7147 ft. Interval Bottom: 7155 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/6/2003 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/7/2012 | | Treatment Summary: | Reperf'd Codell. Re-Frac'd Codell w/ 119 bbl FE-1A pad, 595 bbls of 26# pHaser pad, 1991 bbls of 26# pHaser, 217670 # 20/40 Preferd Rock , 8000# 20/40 SB Excel. | | Formation Treatment | | Treatment Date: | 10/23/2003 | | Treatment Summary: | 10/23/03 BJ SERVICES FRACED WITH 2980 BBL OF 20# VISTAR GEL, 220,000# OF 20/40 MESH SAND AND 8000# OF 20/40 SUPER LC RESIN SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 48 | | BTU_GAS | 1233 | | CALC_GOR | 2500 | | CASING_PRESS | 1333 | | GRAVITY_OIL | 54 | | MCF_GAS | 120 |
| | Perforation Data: | | Interval Top: | 7147 ft. | # Of Holes: | 48 | | Interval Bottom: | 7155 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/30/2020 Interval Top: 6862 ft. Interval Bottom: 7155 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/23/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 15 | | BTU_GAS | 1313 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 4908 | | CALC_MCF_GAS | 75 | | CASING_PRESS | 1775 | | GRAVITY_OIL | 55 | | MCF_GAS | 75 | | TUBING_PRESS | 1350 |
| | Perforation Data: | | Interval Top: | 6862 ft. | # Of Holes: | 76 | | Interval Bottom: | 7155 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 9/24/2020 Interval Top: 6862 ft. Interval Bottom: 6988 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/23/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/8/2012 | | Treatment Summary: | Perf'd Niobrara "A" 6862-6864' (4 holes), Niobrara "B" 6980-6988 (24 holes)
ReFrac'd Niobrara with 119 bbl FE-1A pad, 1548 bbls of Slickwater pad, 154 bbls of pHaser 20# pad, 2262 bbls of pHaser 20# fluid system and 238670# of 20/42 Preferred Rock, 12000 # 20/40 SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6862 ft. | # Of Holes: | 28 | | Interval Bottom: | 6988 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/30/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|