Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21326
Well Classification: GW Status: SI - 12/1/2025
Well Name/No:IONE #41-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date12/1/2025
FacilityID:266098LocationID:331804
County:WELD #123Location:NENE 10 2N66W 6
Field:WATTENBERG - #90750Elevation:5012 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:465FNL  580 FELLat/Long: 40.158680 / -104.755870Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.158680 / -104.755900Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/5/2011
End Date: 7/5/2011
Reported: 2/21/2012
Prior to rule 205A.b.(2)(A)
Days to report: 231
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 12/1/2025             Measured TD: 8080 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 12/1/2025
Wellbore Permit
Permit #:20070424 Expiration Date:2/27/2008
Proposed Top PZ Location:Sec: Twp: Footage: 467 FNL  467 FEL
Bottom Hole Location:Sec:10 Twp: 2N 66W Footage: 467 FNL  467 FEL
Proposed Depth/Form:8200 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5377 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4357 ft., Bottom: 5377 ft.

Wellbore Completed
Completion Date:4/5/2007
Spud Date:3/26/2007Spud Date Is:ACTUAL
Measured TD:8080 ft.Measured PB depth:8066 ft.
True Vertical TD:True Vertical PB depth:
Bottom Hole Location:Sec:10 Twp: 2N 66WFootage: 465 FNL  580 FEL
Log Types:CBL, DUAL IND/COMP.DENSITY/COMP.NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 941 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 941 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8072 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 6680 ft., Bottom: 8072 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5244 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 270, Top: 4170 ft., Bottom: 5244 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4488 ft.NN
SHANNON5208 ft.NN
NIOBRARA7202 ft.NN
CODELL7478 ft.NN
J SAND7923 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  SI - 12/1/2025                 Interval Top: 7926 ft.    Interval Bottom: 7978 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/13/2007
Treatment Summary:JSND COMPLETION FRAC'D THE J SAND WITH 148,890 GAL FRAC FLUID AND 253,320# SAND 04-13-07
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7926 ft.# Of Holes:96
Interval Bottom:7978 ft.Hole Size:0.41 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 11/11/2011                Interval Top: 7246 ft.    Interval Bottom: 7978 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/18/2011
Treatment Summary:PRODUCTION TUBING 2 3/8 SET @ 7914'. CIBP SET @ 7550' AND CFP SET @ 7320' ON 7/5/11; BOTH DRILLED OUT 8/11/11. COMMINGLED 8/13/11.
Formation Treatment
Treatment Date:4/5/2007
Treatment Summary:JNBCD COMMINGLE DRILLED OUT CFP @ 7340, 7380' AND 7600' TO COMMINGLE THE JSND - NBRR - CODL.06/14/07
Tubing Size:2.375 in.Tubing Setting Depth:7914 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/18/2011Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 32
BTU_GAS 1
CALC_BBLS_H2O 4
CALC_BBLS_OIL 32
CALC_GOR 5281
CALC_MCF_GAS 202
CASING_PRESS 347
GRAVITY_OIL 53
MCF_GAS 202
TUBING_PRESS 433
Perforation Data:
Interval Top:7246 ft.# Of Holes:228
Interval Bottom:7978 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 12/1/2025                 Interval Top: 7246 ft.    Interval Bottom: 7496 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/5/2011
Treatment Summary:NIOBRARA REFRAC 7246'-7266' FRAC'D W/250,700# SAND IN 133,854 GAL FRAC FLUID 7/5/11. CODELL REFRAC 7478'-7496' FRAC'D W/250,120# SAND IN 119,742 GAL FRAC FLUID 7/5/11.
Formation Treatment
Treatment Date:4/13/2007
Treatment Summary:NBRR-CDL RECOMPLETION SET CFP @ 7600' 04-13-07 FRAC'D THE CODELL WITH 114,364 GAL FRAC FLUID AND 254,240# SAND 04-13-07 SET CFP @ 7380' 04-13-07 FRAC'D THE NIOBRARA WITH 99,478 GAL FRAC FLUID AND 16,606# 20/40 SAND 04-13-07 SET CFP @ 7340' 04-16-07 FRAC'D THE NIOBRARA WITH 151,158 GAL FRAC FLUID AND 187,838# SAND 04-20-07
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_H2O 33
BBLS_OIL 52
CALC_BBLS_H2O 33
CALC_BBLS_OIL 52
CALC_GOR 4673
CALC_MCF_GAS 243
CASING_PRESS 309
MCF_GAS 243
Perforation Data:
Interval Top:7246 ft.# Of Holes:132
Interval Bottom:7496 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)215
Total Gas Produced (MCF)5831
GOR27120
GOR DeterminationMCFE
Average BOE per Day3.353
Average MCFE per Day19.410

 Federal Financial Assurance  i 

 Tribal Well  i No