Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21311
Well Classification: OW Status: PA - 12/1/2020
Well Name/No:MONSON #24-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date12/1/2020
FacilityID:265984LocationID:331792
County:WELD #123Location:SESW 20 6N65W 6
Field:WATTENBERG - #90750Elevation:4720 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:470FSL  1810 FWLLat/Long: 40.467304 / -104.690340Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.467330 / -104.690310Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 12/1/2020             Measured TD: 7357 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 12/1/2020
Wellbore PermitDRIFTED
Permit #:20030142 Expiration Date:1/30/2004
Proposed Depth/Form:7535 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318A , Unit Acreage: 80, Drill Unit: E/2

Wellbore Completed
Completion Date:N/A
Spud Date:3/2/2003Spud Date Is:ACTUAL
Measured TD:7357 ft.Measured PB depth:7314 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR, IND, DENSITY, NEUTRON, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 409 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 409 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7314 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 6330 ft., Bottom: 7314 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7314 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 3595 ft., Bottom: 6330 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 3565 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 585, Top: 0 ft., Bottom: 3477 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2100 ft.NN
PARKMAN3665 ft.NN
SUSSEX4105 ft.NN
SHANNON4430 ft.NN
NIOBRARA6840 ft.NN
FORT HAYS7045 ft.NN
CODELL7131 ft.NN
CARLILE7160 ft.NN
GREENHORN7185 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/12/2012                 Interval Top: 7137 ft.    Interval Bottom: 7145 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/27/2012
Treatment Summary:Re-perf Codell, Re-Frac'd Codell w/ 119 bbl Active pad,595 bbls of 26# pHaser pad, 2021 bbls of 24# pHaser, 216980 # 20/40 Preferd Rock , 8000# 20/40 SB Excel.
Formation Treatment
Treatment Date:3/31/2003
Treatment Summary:3/31/03 BJ SERVICES FRACED WITH 2702 BBL OF 20 # VISTAR GEL, 217,240# OF 20/40 MESH SAND AND 8,000# OF 20/40 SUPER LC RESIN SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 30
CASING_PRESS 2500
MCF_GAS 100
Perforation Data:
Interval Top:7137 ft.# Of Holes:24
Interval Bottom:7145 ft.Hole Size:0.40625 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 12/1/2020                 Interval Top: 6845 ft.    Interval Bottom: 7145 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/15/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 9
BBLS_OIL 32
BTU_GAS 1313
CALC_BBLS_H2O 9
CALC_BBLS_OIL 32
CALC_GOR 3558
CALC_MCF_GAS 113
CASING_PRESS 680
GRAVITY_OIL 55
MCF_GAS 113
TUBING_PRESS 201
Perforation Data:
Interval Top:6845 ft.# Of Holes:52
Interval Bottom:7145 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/12/2012                 Interval Top: 6845 ft.    Interval Bottom: 6963 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/27/2012
Treatment Summary:Perf'd Niobrara "A" 6846-6848' (4 holes), Niobrara "B" 6955-6963 (24 holes) ReFrac'd Niobrara with 119 bbl Active pad, 1549 bbls of Slickwater pad, 143 bbls of pHaser 20# pad, 2246 bbls of pHaser 20# fluid system and 238240# of 20/42 Preferred Rock, 12000 # 20/40 SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6845 ft.# Of Holes:28
Interval Bottom:6963 ft.Hole Size:0.421875 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/01/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No