Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21277
Well Classification: GW Status: PA - 7/12/2018
Well Name/No:BOULDER BANK #44-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/12/2018
FacilityID:265756LocationID:336420
County:WELD #123Location:NESE 7 1N66W 6
Field:WATTENBERG - #90750Elevation:4926 ft.
Planned Location:1570FSL  1195 FELLat/Long: 40.062638 / -104.814830Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.062781 / -104.814789Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 7/12/2018             Measured TD: 8220 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 7/12/2018
Wellbore PermitDIRECTIONAL
Permit #:20022394 Expiration Date:1/7/2004
Proposed Top PZ Location:Sec:7 Twp: 1N 66W Footage: 660 FSL  660 FEL
Bottom Hole Location:Sec:7 Twp: 1N 66W Footage: 660 FSL  660 FEL
Proposed Depth/Form:8178 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: SE/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4900 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 225, Top: 4200 ft., Bottom: 4900 ft.

Wellbore Completed
Completion Date:3/28/2003
Spud Date:2/26/2003Spud Date Is:ACTUAL
Measured TD:8220 ft.Measured PB depth:8205 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:7 Twp: 1N 66WFootage: 660 FSL  660 FEL
Bottom Hole Location:Sec:7 Twp: 1N 66WFootage: 660 FSL  660 FEL
Log Types:C B L, C N
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 901 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 901 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8227 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 6858 ft., Bottom: 8227 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5087 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 235, Top: 4295 ft., Bottom: 5096 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5087 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 235, Top: 4295 ft., Bottom: 5096 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4534 ft.NN
NIOBRARA7118 ft.NN
CODELL7470 ft.NN
GREENHORN7529 ft.NN
GRANEROS7752 ft.NN
MOWRY7898 ft.NN
J-2 SAND7910 ft.NN
SKULL CREEK8003 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 7/12/2018                 Interval Top: 8088 ft.    Interval Bottom: 8119 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/28/2003
Treatment Summary:DRILL OUT DV TOOL. PERF'D THE J SAND FROM 8088' - 8119' W/2 SPF. FRAC'D W/194,796 GAL SLICK WATER CONTANING 146,978# 20/40 SAND. FLOW BACK WELL. RIH W/TBG. SWAB.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 3
CALC_BBLS_H2O 40
CALC_BBLS_OIL 3
CALC_GOR 230333
CALC_MCF_GAS 691
CASING_PRESS 610
MCF_GAS 691
TUBING_PRESS 345
Perforation Data:
Interval Top:8088 ft.# Of Holes:62
Interval Bottom:8119 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/30/2003                 Interval Top: 7632 ft.    Interval Bottom: 7651 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/28/2003
Treatment Summary:DRY RBP @ 7710'. DUMP 1 SX SAND ON RBP. RUN RBP #2. SET @ 7695'. PERF'D THE CODELL FROM 7632'-7651' W/4 SPF. FRAC'D W/119,600 GAL DYNAFLOW-2 W/288,154# 20/40 SAND. FLOW BACK WELL. PUT WELL ON PRODUCTION.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/30/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 35
BBLS_OIL 35
CALC_BBLS_H2O 35
CALC_BBLS_OIL 35
CALC_GOR 3086
CALC_MCF_GAS 108
CASING_PRESS 170
MCF_GAS 108
Perforation Data:
Interval Top:7632 ft.# Of Holes:76
Interval Bottom:7651 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 11/8/2003                 Interval Top: 7632 ft.    Interval Bottom: 8119 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/28/2003
Treatment Summary:RIH W/TBG. DRILL & WASH TO RBP. POOH W/TBG. RIH/W RET HEAD, TBG. WASH ONTO RBP #1 @ 7695'. REL RBP. POOH W/TBG. RIH W/RET HEAD. WASH ONTO RBP #2. REL RBP. POOH W/JTS. RIH W/PROD TBG. LAND TBG @ 8072'. BROACH TBG.WAB. SWAB
Tubing Size:0.05263158 in.Tubing Setting Depth:8072 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/8/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 23
BBLS_OIL 20
CALC_BBLS_H2O 23
CALC_BBLS_OIL 20
CALC_GOR 13650
CALC_MCF_GAS 273
CASING_PRESS 590
MCF_GAS 273
TUBING_PRESS 195
Perforation Data:
Interval Top:7632 ft.# Of Holes:138
Interval Bottom:8119 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 7/12/2018                 Interval Top: 7390 ft.    Interval Bottom: 7651 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size:0.344 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/28/2010
Treatment Summary:NIOBRARA: PERFED 7396-7410. REPERFED 7390-7396. 1/28/10-FRAC'D W/42,252 GAL SLICKWATER AND 609# SAND. PRESSURED OUT. 2/10/10-ACIDIZED W/500 GAL 15% KCL. 2/15/10-ATTEMPTED TO FRA W/49,056 GAL FRAC FLUID CONTAINING 252,600# 20/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:8087 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/15/2010Test Method:FLOWING
Hours Tested:1Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 3
BTU_GAS 51
CALC_BBLS_H2O 96
CALC_BBLS_OIL 72
CALC_GOR 17667
CALC_MCF_GAS 1272
CASING_PRESS 460
GRAVITY_OIL 1
MCF_GAS 53
TUBING_PRESS 410
Perforation Data:
Interval Top:7390 ft.# Of Holes:80
Interval Bottom:7651 ft.Hole Size:0.71 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/12/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No