|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 6/7/2017 Measured TD: 7885 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 6/7/2017 | Wellbore Permit | | Permit #: | 20041036 | Expiration Date: | 5/26/2005 | Prop Depth/Form: | 7500 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S/2NW/4 | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: 320, Drill Unit: N2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2 |
| | |
Wellbore Completed | Completion Date: | 4/26/2005 | Spud Date: | 12/15/2004 | Spud Date Is: | ACTUAL | Measured TD: | 7885 ft. | Measured PB depth: | 7349 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | COMPENSATED DEN/COMP. NEU/DUAL IND.; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 410 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 330, Top: 0 ft., Bottom: 410 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7371 ft., Weight: 11.60 , Citings Type: ACTUAL | Cement: | Sacks: 430, Top: 5810 ft., Bottom: 7371 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6250 ft. | | N | N | CODELL | 6499 ft. | | N | N | J SAND | 6955 ft. | | N | N | DAKOTA | 7222 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 6/7/2017 Interval Top: 7250 ft. Interval Bottom: 7270 ft. Completed Information for Formation DAKOTA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DAKOTA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/26/2005 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DKTA. |
| Perforation Data: | Interval Top: | 7250 ft. | # Of Holes: | 80 | Interval Bottom: | 7270 ft. | Hole Size: | 0.4 in. |
|
Formation JSND Formation Classification: GW Status: AB - 6/7/2017 Interval Top: 6956 ft. Interval Bottom: 6966 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | 0.313 in. | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/26/2005 | Treatment Summary: | FRAC W/81,522 GAL OF VISTAR 18 & 20# W/142,720# 20/40 SAND & 8,000# SB EXCEL 20/40 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6947 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/6/2005 | Test Method: | PLUNGER LIFT | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 64 | CASING_PRESS | 520 | MCF_GAS | 207 | TUBING_PRESS | 220 |
| Perforation Data: | Interval Top: | 6956 ft. | # Of Holes: | 40 | Interval Bottom: | 6966 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: GW Status: AB - 6/7/2017 Interval Top: 6502 ft. Interval Bottom: 6512 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/26/2005 | Treatment Summary: | 2/9/06 FRAC W/112,266 GALS OF VISTAR 22# 217,400# 20/40 SAND & 8,000# SUPER LC 20/40 SAND |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6709 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/27/2006 | Test Method: | PLUNGER LIFT | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 3 | BBLS_OIL | 29 | CASING_PRESS | 800 | MCF_GAS | 77 | TUBING_PRESS | 250 |
| Perforation Data: | Interval Top: | 6502 ft. | # Of Holes: | 40 | Interval Bottom: | 6512 ft. | Hole Size: | 0.4 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 1/6/2004 Interval Top: 6502 ft. Interval Bottom: 6996 ft. Completed Information for Formation J-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/26/2005 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation J-CDL. |
| Perforation Data: | Interval Top: | 6502 ft. | # Of Holes: | 80 | Interval Bottom: | 6996 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|