|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/4/2015 Measured TD: 7740 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/4/2015 | Wellbore Permit | DRIFTED | Permit #: | | Expiration Date: | 10/5/2010 | Proposed Depth/Form: | 7740 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2SE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 729 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 500, Top: 12 ft., Bottom: 729 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7730 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 460, Top: 5500 ft., Bottom: 7730 ft. |
| | |
Wellbore Completed | Completion Date: | 12/18/2002 | Spud Date: | 11/23/2002 | Spud Date Is: | ACTUAL | Measured TD: | 7740 ft. | Measured PB depth: | 7702 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | PEAILC, PECNLD, PEMLGR, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 729 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 500, Top: 0 ft., Bottom: 729 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7731 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 460, Top: 4006 ft., Bottom: 7730 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4324 ft. | | N | N | SHANNON | 4884 ft. | | N | N | NIOBRARA | 6834 ft. | | N | N | FORT HAYS | 7090 ft. | | N | N | CODELL | 7119 ft. | | N | N | J SAND | 7573 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 3/4/2015 Interval Top: 7578 ft. Interval Bottom: 7614 ft. Completed Information for Formation J SAND | 1st Production Date: | 12/30/2002 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/31/2012 | Treatment Summary: | REMOVED SAND PLUG SET @ 7300-7302 TO COMMINGLE JSND WITH NB/CD. HOLE SIZE N/A | Formation Treatment | Treatment Date: | 12/18/2002 | Treatment Summary: | SET SAND PLUG AT 7300' FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT SAND PLUG & COMMINGLE THE WELL WITIHN THE NEXT SIX (6) MONTHS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 1 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 1 | CALC_GOR | 298000 | CALC_MCF_GAS | 298 | CASING_PRESS | 480 | GRAVITY_OIL | 60 | MCF_GAS | 298 | TUBING_PRESS | 200 |
| Perforation Data: | Interval Top: | 7578 ft. | # Of Holes: | 88 | Interval Bottom: | 7614 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 3/4/2015 Interval Top: 6882 ft. Interval Bottom: 7614 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 2/7/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/31/2012 | Treatment Summary: | REMOVED SAND PLUG SET @ 7300-7302 TO COMMINGLE JSND WITH NB/CD |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7566 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/20/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 3 | BTU_GAS | 1267 | CALC_BBLS_OIL | 3 | CALC_GOR | 6667 | CALC_MCF_GAS | 20 | CASING_PRESS | 770 | GRAVITY_OIL | 57 | MCF_GAS | 20 | TUBING_PRESS | 689 |
| Perforation Data: | Interval Top: | 6882 ft. | # Of Holes: | 212 | Interval Bottom: | 7614 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/4/2015 Interval Top: 6882 ft. Interval Bottom: 7132 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 2/2/2010 | Choke Size: | 0.219 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/26/2010 | Treatment Summary: | NB PERF 6882-7032, HOLES 72, SIZE 0.42 / FRAC NB W/500 GAL 15% HCI & 243,713 GAL SW W/200,760# 30/50 & 4,000# 20/40 SB EXCEL. // CD PERF 7119-7132, HOLES 52, SIZE 0.38./FRAC CD W/ 186,497 GAL SW W/ 150,020# 30/50 & 4,0003 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/18/2010 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1228 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 26 | CALC_GOR | 6885 | CALC_MCF_GAS | 179 | CASING_PRESS | 275 | GRAVITY_OIL | 56 |
| Perforation Data: | Interval Top: | 6882 ft. | # Of Holes: | 124 | Interval Bottom: | 7132 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 03/04/2015 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|