Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21208
Well Classification: GW Status: PA - 3/19/2018
Well Name/No:MASON #43-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/19/2018
FacilityID:265266LocationID:331736
County:WELD #123Location:NESE 8 2N66W 6
Field:WATTENBERG - #90750Elevation:4869 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2160FSL  480 FELLat/Long: 40.151187 / -104.793300Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.151270 / -104.793399Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 3/19/2018             Measured TD: 7950 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 3/19/2018
Wellbore PermitDRIFTED
Permit #:20022095 Expiration Date:11/17/2003
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: GRRS , Formation: GRANEROS , Order: 318A , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 320, Drill Unit: E2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4980 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4000 ft., Bottom: 4950 ft.

Wellbore Completed
Completion Date:9/5/2003
Spud Date:8/1/2003Spud Date Is:ACTUAL
Measured TD:7950 ft.Measured PB depth:7900 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL AI, COMPENSATED NEUTRON, GAMMA RAY
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 765 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 765 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7950 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 5685 ft., Bottom: 7950 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4850 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 3115 ft., Bottom: 4845 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4391 ft.NN
NIOBRARA7159 ft.NN
FORT HAYS7355 ft.NN
CODELL7378 ft.NN
CARLILE7398 ft.NN
GREENHORN7437 ft.NN
BENTONITE7645 ft.NN
MOWRY7792 ft.NN
J-2 SAND7808 ft.NN
SKULL CREEK7921 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 3/19/2018                 Interval Top: 7809 ft.    Interval Bottom: 7872 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/5/2003
Treatment Summary:PERF'D THE J SAND FROM 7809'-7812',7833'-7872' W/194,500 GAL SLICK WATER CONTAINING 161,080# 20/40 SAND. RIH W/PROD TBG. LAND TBG @ 7809'. SWAB. FLOW BACK WELL.
Tubing Size:2.375 in.Tubing Setting Depth:7809 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/29/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 53
BBLS_OIL 3
CALC_BBLS_H2O 53
CALC_BBLS_OIL 3
CALC_GOR 153667
CALC_MCF_GAS 461
CASING_PRESS 630
MCF_GAS 461
TUBING_PRESS 375
Perforation Data:
Interval Top:7809 ft.# Of Holes:168
Interval Bottom:7872 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/20/2003                Interval Top: 7380 ft.    Interval Bottom: 7398 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/5/2003
Treatment Summary:SET CIBP @ 7416'. PERF'D THE CODELL FROM 7380'-7398' W/4SPF. FRAC'D W/119,070 GAL GEL AND 301,800# 20/40 SAND. FLOW BACK WELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/20/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 17
BBLS_OIL 92
CALC_BBLS_H2O 17
CALC_BBLS_OIL 92
CALC_GOR 2239
CALC_MCF_GAS 206
CASING_PRESS 355
MCF_GAS 206
Perforation Data:
Interval Top:7380 ft.# Of Holes:72
Interval Bottom:7398 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/5/2004                  Interval Top: 7164 ft.    Interval Bottom: 7872 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/5/2003
Treatment Summary:DRILL UP 1ST CIBP @ 7320'. DRILL UP 2ND CIBP@7416', POOH. RIH W/PRODUCTION TBG. LANDED TBG @ 7087', BROACH AND SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:7087 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/5/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 72
CALC_BBLS_H2O 14
CALC_BBLS_OIL 72
CALC_GOR 6208
CALC_MCF_GAS 447
CASING_PRESS 1000
MCF_GAS 447
TUBING_PRESS 740
Perforation Data:
Interval Top:7164 ft.# Of Holes:352
Interval Bottom:7872 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 12/23/2003                Interval Top: 7164 ft.    Interval Bottom: 7266 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:NIOBRARACommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/5/2003
Treatment Summary:SET CIBP@ 7320'. DUMP 1 ST OF CMT ON CIBP. PERF'D THE NIOBRARA FROM 7164'-7174',7226' - 7230',7252'-7266' W/SPF. FRAC'D W/116,300 GAL FRAC FLUID AND 194,417# SAND. FLOW BACK WELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/23/2003Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 22
BBLS_OIL 57
CALC_BBLS_H2O 22
CALC_BBLS_OIL 57
CALC_GOR 4088
CALC_MCF_GAS 233
MCF_GAS 233
Perforation Data:
Interval Top:7164 ft.# Of Holes:112
Interval Bottom:7266 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 3/19/2018

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/5/2004Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
No Perforation Data was found for formation NB-CD.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/19/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No