|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 2/7/2024 Measured TD: 8315 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 2/7/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | 20032003 | Expiration Date: | 10/29/2004 | Proposed Top PZ Location: | Sec:7 Twp: 2N 67W | Footage: 1980 FSL 660 FEL | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 1980 FSL 660 FEL | Proposed Depth/Form: | 8302 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 302, Drill Unit: S/2 | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 302, Drill Unit: S/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318 A/232 , Unit Acreage: 302, Drill Unit: S/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 302, Drill Unit: S/2 |
| | |
Wellbore Completed | Completion Date: | 12/24/2002 | Spud Date: | 12/14/2002 | Spud Date Is: | ACTUAL | Measured TD: | 8315 ft. | Measured PB depth: | 8283 ft. | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec:7 Twp: 2N 67W | Footage: 1950 FSL 688 FEL | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 1980 FSL 660 FEL | Log Types: | CBL, CN | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 417 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 213, Top: 0 ft., Bottom: 417 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8302 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 275, Top: 6740 ft., Bottom: 8302 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6740 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 340, Top: 3940 ft., Bottom: 6740 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4497 ft. | | N | N | SUSSEX-CODELL | 4588 ft. | | N | N | SUSSEX-MUDDY | 4796 ft. | | N | N | SHANNON | 5068 ft. | | N | N | NIOBRARA | 7530 ft. | | N | N | BARKER CREEK | 7641 ft. | | N | N | FORT HAYS | 7762 ft. | | N | N | CODELL | 7782 ft. | | N | N | CARLILE | 7806 ft. | | N | N | GREENHORN | 7822 ft. | | N | N | GRANEROS | 8048 ft. | | N | N | BENTONITE | 8048 ft. | | N | N | MOWRY | 8200 ft. | | N | N | J-2 SAND | 8216 ft. | | N | N | J SAND | 8232 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/7/2024 Interval Top: 8218 ft. Interval Bottom: 8266 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/24/2002 | Treatment Summary: | PERF'D THE J SAND FROM 8218'-8220' & 8235'-8266' W/2 SPF. FRAC'D THE J SAND W/450,000# FRAC GEL. RIH W/TBG AND BAILER. POOH. RIH W/TBG. SWAB. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 31 | BBLS_OIL | 5 | CALC_BBLS_H2O | 31 | CALC_BBLS_OIL | 5 | CALC_GOR | 103600 | CALC_MCF_GAS | 518 | CASING_PRESS | 920 | MCF_GAS | 518 | TUBING_PRESS | 740 |
| Perforation Data: | Interval Top: | 8218 ft. | # Of Holes: | 66 | Interval Bottom: | 8266 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 4/26/2003 Interval Top: 7784 ft. Interval Bottom: 7806 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | 0.344 in. | Formation Name: | CODELL | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/24/2002 | Treatment Summary: | SET FRAC PLUG @ 7900'. PERF'D THE CODELL FROM 7784'-7806' W/4 SPF. TIH W/TBG FOR 3 - WAY FRAC TBG. LANDED @ 7668'. FRAC'D W/121,470 DYNAFLOW-2 CROSSLINKED GEL CONTAINING 300,870# 20/40 SAND. FLOW BACK FRAC. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7668 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/26/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 33 | BBLS_OIL | 88 | CALC_BBLS_H2O | 33 | CALC_BBLS_OIL | 88 | CALC_GOR | 4170 | CALC_MCF_GAS | 367 | CASING_PRESS | 600 | MCF_GAS | 367 | TUBING_PRESS | 280 |
| Perforation Data: | Interval Top: | 7784 ft. | # Of Holes: | 88 | Interval Bottom: | 7806 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 8/29/2003 Interval Top: 7784 ft. Interval Bottom: 8266 ft. Completed Information for Formation J-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-CODELL | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/24/2002 | Treatment Summary: | TIG W/TBG. DRILL OUT PLUG. TAG @ 8283'. TOH W/TBG. TIH W/PROD.TBG. LAND PROD TBG @ 8202', SWAB |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8202 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/29/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 19 | BBLS_OIL | 23 | CALC_BBLS_H2O | 19 | CALC_BBLS_OIL | 23 | CALC_GOR | 11522 | CALC_MCF_GAS | 265 | CASING_PRESS | 640 | MCF_GAS | 265 | TUBING_PRESS | 150 |
| Perforation Data: | Interval Top: | 7784 ft. | # Of Holes: | 154 | Interval Bottom: | 8266 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/4/2008 Interval Top: 7520 ft. Interval Bottom: 8266 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/24/2002 | Treatment Summary: | JSND-NBRR-CODL COMMINGLE. DRILLED UP CBP @ 7750' & 7890' TO COMMINGLE JSND-NBRR-CODL. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8190 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/4/2008 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 13 | BTU_GAS | 1247 | CALC_BBLS_H2O | 2 | CALC_BBLS_OIL | 13 | CALC_GOR | 12846 | CALC_MCF_GAS | 167 | CASING_PRESS | 898 | GRAVITY_OIL | 51 | MCF_GAS | 167 | TUBING_PRESS | 722 |
| Perforation Data: | Interval Top: | 7520 ft. | # Of Holes: | 186 | Interval Bottom: | 8266 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/7/2024 Interval Top: 7520 ft. Interval Bottom: 7804 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/22/2008 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/22/2008 | Treatment Summary: | NB-CD REFRAC & RECOMPLTN. SET CBP@ 7890'. REFRACD CODL W/108,402 GAL FRAC FLUID & 253,600# 20/40 SAND. SET CBP @ 7750'. REFRACD NBRR W/169,344 GALS FRAC FLUID & 254,080# 20/40 SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7520 ft. | # Of Holes: | | Interval Bottom: | 7804 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/31/2003 Interval Top: 7520 ft. Interval Bottom: 7710 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/24/2002 | Treatment Summary: | SET CIBP@7770'. DUMP BALL 1 SX CEMENT.PERF'D THE NIOBRARA FROM 7520'-7570,7594'-7640' 7670'-7710' W/4 SPF. FRAC'D W/325,080 GAL SLICK WATER CONTAINING 150,300# 20/40 SAND. FLOW BACK WELL. RIH W/PROD TBG. LAND TBG@7506'.SWAB. TURN WELL OVER TO PROD. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7506 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/31/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 19 | BBLS_OIL | 29 | CALC_BBLS_H2O | 19 | CALC_BBLS_OIL | 29 | CALC_GOR | 4966 | CALC_MCF_GAS | 144 | CASING_PRESS | 700 | MCF_GAS | 144 | TUBING_PRESS | 160 |
| Perforation Data: | Interval Top: | 7520 ft. | # Of Holes: | 544 | Interval Bottom: | 7710 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 02/07/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|