Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21138
Well Classification: OW Status: PA - 2/7/2024
Well Name/No:WANDELL #33-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/7/2024
FacilityID:265032LocationID:336456
Municipality/County:FIRESTONE / WELD #123Location:SWNE 7 2N67W 6
Field:WATTENBERG - #90750Elevation:4886 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2010FNL  1885 FELLat/Long: 40.154856 / -104.930875Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.154900 / -104.930633Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/21/2011
End Date: 2/21/2011
Reported: 2/29/2012
Prior to rule 205A.b.(2)(A)
Days to report: 373
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 2/7/2024             Measured TD: 8146 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 2/7/2024
Wellbore PermitDIRECTIONAL
Permit #:20032002 Expiration Date:10/29/2004
Proposed Top PZ Location:Sec:7 Twp: 2N 67W Footage: 2073 FSL  1943 FEL
Bottom Hole Location:Sec:7 Twp: 2N 67W Footage: 1980 FSL  1980 FEL
Proposed Depth/Form:8153 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 302, Drill Unit: N/2
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 302, Drill Unit: N/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318,A/232 , Unit Acreage: 302, Drill Unit: N/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407,407-66, Unit Acreage: 302, Drill Unit: N/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 419 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 113, Top: 0 ft., Bottom: 419 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8153 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 605, Top: 3440 ft., Bottom: 8153 ft.

Wellbore Completed
Completion Date:1/11/2003
Spud Date:12/7/2002Spud Date Is:ACTUAL
Measured TD:8146 ft.Measured PB depth:8136 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:7 Twp: 2N 67WFootage: 2073 FSL  1943 FEL
Bottom Hole Location:Sec:7 Twp: 2N 67WFootage: 1980 FSL  1980 FEL
Log Types:CBL, CN, ARRAY INDUCTION, DEVIATION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 419 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 113, Top: 0 ft., Bottom: 419 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8153 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 3440 ft., Bottom: 8153 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: 0 ft., Depth: 5300 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 110, Top: 3440 ft., Bottom: 5300 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: 0 ft., Depth: 4400 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 3440 ft., Bottom: 5300 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4358 ft.NN
SUSSEX-CODELL4462 ft.NN
SUSSEX-MUDDY4648 ft.NN
SHANNON4896 ft.NN
NIOBRARA7327 ft.NN
BARKER CREEK7354 ft.NN
BARKER CREEK - LOWER7430 ft.NN
FORT HAYS7554 ft.NN
CODELL7575 ft.NN
CARLILE7598 ft.NN
GREENHORN7613 ft.NN
GRANEROS7836 ft.NN
BENTONITE7836 ft.NN
MOWRY7985 ft.NN
J-2 SAND8007 ft.NN
J SAND8016 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  AB - 2/7/2024                  Interval Top: 8007 ft.    Interval Bottom: 8052 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/11/2003
Treatment Summary:PERF THE J SAND FROM 8007'-8011',8018'-8052' W/2 SPF. FRAC'D THE J SAND WITH 450,000# SILVERSTIM FLUID. FLOW BACK WELL. RIH W/TBG AND BAILER. POOH. RIH W/PROD TBG. SWAB.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 36
BBLS_OIL 6
CALC_BBLS_H2O 36
CALC_BBLS_OIL 6
CALC_GOR 85167
CALC_MCF_GAS 511
CASING_PRESS 1680
MCF_GAS 511
TUBING_PRESS 1650
Perforation Data:
Interval Top:8007 ft.# Of Holes:76
Interval Bottom:8052 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/3/2011                 Interval Top: 7576 ft.    Interval Bottom: 7597 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/11/2003
Treatment Summary:SET HALLIBURTON PLUG @ 7700'. PERF'D THE CODELL FROM 7576'-7597' W/4 SPF. TIH W/TBG LAND FOR 3-WAY FRAC @ 7446' KB. FRAC'D W/120,540 GAL DYNAFLOW-2 CROSSLINKED GEL CONTAINING 289,300# 20/40 SAND. FLOW BAC WELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 33
BBLS_OIL 85
CALC_BBLS_H2O 33
CALC_BBLS_OIL 85
CALC_GOR 4412
CALC_MCF_GAS 375
CASING_PRESS 600
MCF_GAS 375
TUBING_PRESS 280
Perforation Data:
Interval Top:7576 ft.# Of Holes:84
Interval Bottom:7597 ft.Hole Size:48 in.

Formation J-CDL                   Formation Classification:  OW                   Status:  CM - 9/1/2003                  Interval Top: 7576 ft.    Interval Bottom: 8052 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:1/11/2003
Treatment Summary:THI W/TBG. DRILL OUT HP PLUG. TAG FILL @ 8130'. TOH W/TBG. TIH W/TBG. LAND FOR PROD TBG @ 7988'. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:7988 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/1/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 17
BBLS_OIL 27
CALC_BBLS_H2O 17
CALC_BBLS_OIL 27
CALC_GOR 12519
CALC_MCF_GAS 338
CASING_PRESS 410
MCF_GAS 338
TUBING_PRESS 150
Perforation Data:
Interval Top:7576 ft.# Of Holes:160
Interval Bottom:8052 ft.Hole Size:48 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 2/7/2024                  Interval Top: 7310 ft.    Interval Bottom: 7597 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/21/2011
Treatment Summary:NBRR-FRAC'D W/144,690 FRAC FLUID AND 250,180# 20/40 SAND. CDL - FRAC'D W/84,294 FRAC FLUID AND 85,620# 20/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7310 ft.# Of Holes:
Interval Bottom:7597 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/4/2003                 Interval Top: 7310 ft.    Interval Bottom: 7500 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:1/11/2003
Treatment Summary:SET CIBP@7550'. DUMP BAIL 1 SX CMT ON CIBP. PERF'D FROM 7310'-7360',7390'-7428',7460'-7500' W/4 SPF. FRAC'D W/310,170 GAL SLICK WATER CONTAINING 151,444# 20/40 SAND. FLOW BACK WELL. SINGLE IN TBG. CIRC SAND OUT TO CIBP @ 7550'. LAND EOT @ 7282'. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:7282 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/4/2003Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BBLS_OIL 33
CALC_GOR 4121
CASING_PRESS 710
MCF_GAS 136
TUBING_PRESS 200
Perforation Data:
Interval Top:7310 ft.# Of Holes:512
Interval Bottom:7500 ft.Hole Size:

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 5/9/2011

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/2/2011
Treatment Summary:DRILLED OUT PLUGS @ 7540' AND 7670' AND CLEANED OUT TO 8053. LANDED 2-3/8" TBG @ 7995'. COMMINGLED 03/28/2011
Formation Treatment
Treatment Date:1/11/2003
Treatment Summary:DRILL UP CIBP. RUN ONE JOINT PAST PLUG. TIH W/ PRODUCTION STRING. LAND 2 7995'. BROACH TBG. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:7995 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/2/2011Test Method:FLOWING
Hours Tested:8Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 1
BTU_GAS 1
CALC_BBLS_H2O 15
CALC_BBLS_OIL 3
CALC_GOR 12
CALC_MCF_GAS 615
CASING_PRESS 656
GRAVITY_OIL 63
MCF_GAS 123
TUBING_PRESS 318
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/07/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No