|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/11/2023 Measured TD: 7940 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/11/2023 | Wellbore Permit | DRIFTED | Permit #: | 20054078 | Expiration Date: | 11/30/2006 | Proposed Depth/Form: | 7940 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2SW4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 879 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 680, Top: 0 ft., Bottom: 879 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7918 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 255, Top: 6520 ft., Bottom: 7918 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4906 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 275, Top: 3650 ft., Bottom: 4912 ft. |
| | |
Wellbore Completed | Completion Date: | 1/28/2003 | Spud Date: | 12/27/2002 | Spud Date Is: | ACTUAL | Measured TD: | 7940 ft. | Measured PB depth: | 7904 ft. | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec: Twp: | Footage: FL FL | Bottom Hole Location: | Sec: Twp: | Footage: | Log Types: | PEAILC, PECNTDD, PECCV, PEMGR, PELQC, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 879 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 680, Top: 0 ft., Bottom: 879 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7918 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 255, Top: 6580 ft., Bottom: 7918 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 2200 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 125, Top: 1894 ft., Bottom: 2200 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4220 ft. | | N | N | SHANNON | 4798 ft. | | N | N | NIOBRARA | 7066 ft. | | N | N | FORT HAYS | 7326 ft. | | N | N | CODELL | 7338 ft. | | N | N | J SAND | 7775 ft. | | N | N | DAKOTA | 7940 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 10/11/2023 Interval Top: 7776 ft. Interval Bottom: 7836 ft. Completed Information for Formation J SAND | 1st Production Date: | 2/19/2003 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/19/2010 | Treatment Summary: | Set sand plug @ 7540'. | Formation Treatment | Treatment Date: | 1/28/2003 | Treatment Summary: | NO BRIDGE PLUG W/CEMENT ON TOP. THERE IS SAND PLUG @ 7476' W/ 3550# OF 20/40 FRAC SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 7 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 7 | CALC_GOR | 15286 | CALC_MCF_GAS | 107 | CASING_PRESS | 500 | GRAVITY_OIL | 60 | MCF_GAS | 107 | TUBING_PRESS | 250 |
| Perforation Data: | Interval Top: | 7776 ft. | # Of Holes: | 48 | Interval Bottom: | 7836 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 11/22/2010 Interval Top: 7340 ft. Interval Bottom: 7360 ft. Completed Information for Formation CODELL | 1st Production Date: | 11/12/2010 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/10/2010 | Treatment Summary: | Reperf CODL 7341-7357 Holes 16 Size 0.38.
Refrac CODL w/ 198,618 gal SW & 150,160# 40/70 sand & 4,000# SB Excel. | Formation Treatment | Treatment Date: | 1/25/2006 | Treatment Summary: | 153,917 GALS FLUID & 115,400 # 30/50 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 26 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 26 | CALC_GOR | 4390 | CALC_MCF_GAS | 114 | CASING_PRESS | 628 | GRAVITY_OIL | 48 | MCF_GAS | 114 | TUBING_PRESS | 291 |
| Perforation Data: | Interval Top: | 7340 ft. | # Of Holes: | 76 | Interval Bottom: | 7360 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 5/21/2008 Interval Top: 7340 ft. Interval Bottom: 7836 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 4/23/2008 | Choke Size: | 0.438 in. | Formation Name: | J-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/18/2008 | Treatment Summary: | CODL PERFS 01/23/2006 > 7340 - 7360 (3SPF); JSND PERFS 01/27/1003 > 7776 -7780 (1SPF) 7782-7788 (1SPF) 7798-7836 (1SPF) |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7758 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/21/2008 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1273 | CALC_BBLS_OIL | 12 | CALC_GOR | 6250 | CALC_MCF_GAS | 75 | CASING_PRESS | 350 | GRAVITY_OIL | 48 | TUBING_PRESS | 300 |
| Perforation Data: | Interval Top: | 7340 ft. | # Of Holes: | 108 | Interval Bottom: | 7836 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/11/2023 Interval Top: 7126 ft. Interval Bottom: 7360 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 11/12/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/10/2010 | Treatment Summary: | NBRR Perf 7126-7220 Holes 62 Size 0.47 CODL Perf 7340-7360 Holes 76 Size 0.38
Frac NBRR w/ 250 gal 15% HCl & 249,984 gal SW & 200,320# 40/70 sand & 4,000# SB Excel. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/15/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 70 | BTU_GAS | 1273 | CALC_BBLS_OIL | 70 | CALC_GOR | 4014 | CALC_MCF_GAS | 281 | CASING_PRESS | 1250 | GRAVITY_OIL | 52 | MCF_GAS | 281 |
| Perforation Data: | Interval Top: | 7126 ft. | # Of Holes: | 138 | Interval Bottom: | 7360 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 10/11/2023 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | Y | Noticed Date 07/06/2023 |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|