Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21107
Well Classification: GW Status: PA - 2/13/2019
Well Name/No:RASMUSSEN #41-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/13/2019
FacilityID:264741LocationID:333213
County:WELD #123Location:NENE 28 2N68W 6
Field:WATTENBERG - #90750Elevation:4951 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:645FNL  590 FELLat/Long: 40.115147 / -105.000956Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.115098 / -105.000924Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 2/13/2019             Measured TD: 8157 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 2/13/2019
Wellbore Permit
Permit #:20071512 Expiration Date:5/6/2008
Proposed Depth/Form:8157 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318,A/232 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:1/4/2004
Spud Date:12/21/2003Spud Date Is:ACTUAL
Measured TD:8157 ft.Measured PB depth:8140 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:CBL, MICRO LOG, ARRAY IND.,COMPENSATED NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 585 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 234, Top: 0 ft., Bottom: 585 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8156 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 5980 ft., Bottom: 8156 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5205 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 3860 ft., Bottom: 5205 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5205 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 3860 ft., Bottom: 5204 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4325 ft.NN
NIOBRARA7300 ft.NN
FORT HAYS7568 ft.NN
CODELL7590 ft.NN
CARLILE7612 ft.NN
GREENHORN7654 ft.NN
MOWRY8003 ft.NN
J-2 SAND8020 ft.NN
SKULL CREEK8112 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 2/13/2019                 Interval Top: 8022 ft.    Interval Bottom: 8060 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:1/4/2004
Treatment Summary:DRILL OUT DV TOOL. RUN CBL. PERF'D THE J SAND FROM 8022'-8024',5034'-8060' W/2 SPF, FRAC'D W/146,160 GAL FRAC FLUID (109,120 GAL SLICK WATER&37,040 GAL CROSSLINKED GEL ) CONTAINING 200,540# 20/40 SAND, RIH W/THB, SN,NC. LAND EOT @ 8015'. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:8015 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/14/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 2
CALC_BBLS_H2O 3
CALC_BBLS_OIL 2
CALC_GOR 23500
CALC_MCF_GAS 47
CASING_PRESS 420
MCF_GAS 47
TUBING_PRESS 200
Perforation Data:
Interval Top:8022 ft.# Of Holes:56
Interval Bottom:8060 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/13/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No