Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21028
Well Classification: GW Status: PA - 5/31/2018
Well Name/No:GRENEMEYER #CD26-A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/31/2018
FacilityID:264193LocationID:331637
County:WELD #123Location:SESW 26 1N67W 6
Field:WATTENBERG - #90750Elevation:5034 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1168FSL  1400 FWLLat/Long: 40.018031 / -104.862281Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.018031 / -104.862281Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/30/2011
End Date: 4/30/2011
Reported: 2/21/2012
Prior to rule 205A.b.(2)(A)
Days to report: 297
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 5/31/2018             Measured TD: 8355 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 5/31/2018
Wellbore Permit
Permit #: Expiration Date:4/18/2013
Proposed Depth/Form:8355 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1077 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1077 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8349 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 6900 ft., Bottom: 8349 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5706 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 350, Top: 4170 ft., Bottom: 5711 ft.

Wellbore Completed
Completion Date:8/2/2002
Spud Date:7/20/2002Spud Date Is:ACTUAL
Measured TD:8355 ft.Measured PB depth:8301 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, MICRO LOG, ARRAY INDUCTION, COMPENSATED NEU.
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1077 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1077 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8349 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 6900 ft., Bottom: 8349 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5706 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 4170 ft., Bottom: 5711 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 2220 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 74 ft., Bottom: 2220 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 74 ft., Depth: 2220 ft., Bottom: 2220 ft., Sacks: 500, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
SUSSEX4780 ft.NN
NIOBRARA7329 ft.NN
FORT HAYS7732 ft.NN
CODELL7754 ft.NN
CARLILE7776 ft.NN
GREENHORN7803 ft.NN
BENTONITE8030 ft.NN
MOWRY8180 ft.NN
J-2 SAND8202 ft.NN
SKULL CREEK8294 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 5/31/2018                 Interval Top: 8203 ft.    Interval Bottom: 8245 ft.

 Completed Information for Formation J SAND
1st Production Date:8/26/2002Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/2/2002
Treatment Summary:Frac'd w/ 305,000# 20/40 sand, 687 bbls, CO2 & 2716 gal Dynafow-2 frac fluid.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 12
CALC_BBLS_H2O 14
CALC_BBLS_OIL 12
CALC_GOR 33917
CALC_MCF_GAS 407
CASING_PRESS 340
MCF_GAS 407
Perforation Data:
Interval Top:8203 ft.# Of Holes:66
Interval Bottom:8245 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 6/4/2011                  Interval Top: 7342 ft.    Interval Bottom: 8203 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/4/2011
Treatment Summary:CIBP SET @ 7820' AND CFP SET @ 7580 ON 4/30/11. BOTH DRILLED OUT 5/24/11. TUBING SET @ 6325 ON 5/24/11. COMMINGLED ON 5/28/11.
Tubing Size:2.375 in.Tubing Setting Depth:6325 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/4/2011Test Method:FLOWING
Hours Tested:7Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 9
BBLS_OIL 16
BTU_GAS 1
CALC_BBLS_H2O 31
CALC_BBLS_OIL 55
CALC_GOR 6313
CALC_MCF_GAS 346
CASING_PRESS 371
GRAVITY_OIL 47
MCF_GAS 101
TUBING_PRESS 138
Perforation Data:
Interval Top:7342 ft.# Of Holes:226
Interval Bottom:8203 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 5/31/2018                 Interval Top: 7342 ft.    Interval Bottom: 7774 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/24/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/30/2011
Treatment Summary:NBRR-PERFED 7342-7354, 7514-7532, 4 SPF, 120 HOLES. FRAC'D W/145,362 GAL FRAC FLUID AND 250,380# SAND. CD- PERFED 7754-7774, 2SPF, 40 HOLES. FRAC'D W/115,962 GAL FRAC FLUID AND 250,740# SAND. CIBP SET @ 7820' AND CFP SET @ 7580 ON 4/0/11. BOTH DRILLED OUT 5/24/11.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7342 ft.# Of Holes:160
Interval Bottom:7774 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/31/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No