Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21007
Well Classification: OW Status: PA - 11/21/2019
Well Name/No:WELLS RANCH #44-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/21/2019
FacilityID:264083LocationID:331630
County:WELD #123Location:SESE 34 6N63W 6
Field:WATTENBERG - #90750Elevation:4760 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:668FSL  658 FELLat/Long: 40.437546 / -104.416071Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.437420 / -104.415690Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 11/21/2019             Measured TD: 6908 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 11/21/2019
Wellbore Permit
Permit #:20041159 Expiration Date:6/14/2005
Proposed Depth/Form:7860 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: 318 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: DKGP , Formation: DAKOTA GROUP , Order: 318A , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2

Wellbore Completed
Completion Date:N/A
Spud Date:1/21/2005Spud Date Is:ACTUAL
Measured TD:6908 ft.Measured PB depth:6870 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:GR, IND, DENSITY, NEUTRON, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 408 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 0 ft., Bottom: 408 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6870 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 1818 ft., Bottom: 6870 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1818 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 287, Top: 273 ft., Bottom: 1818 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2736 ft.NN
PARKMAN3566 ft.NN
SUSSEX3890 ft.NN
SHANNON4198 ft.NN
NIOBRARA6445 ft.NN
FORT HAYS6664 ft.NN
CODELL6710 ft.NN
CARLILE6735 ft.NN
GREENHORN6771 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/20/2011                 Interval Top: 6711 ft.    Interval Bottom: 6719 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/11/2011
Treatment Summary:Re-Perf Codell 6711'-6719' (24 new holes) Original perf 6711'-3719' (18 holes) Re-Frac'd Codell w/ 119 bbl Active Pad, 596 bbls of 26# pHaser pad, 2056 bbls of 26# pHaser, 217220# 20/40 , 8000 #20/40 SB Excel
Formation Treatment
Treatment Date:2/1/2005
Treatment Summary:02/01/05 BJ SERVICES FRACED WITH 2677 BBL OF 20# VISTAR GEL, 217,700# OF 20/40 MESH SAND AND 8,000# OF 20/40 MESH SUPER LC RESIN SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 18
BTU_GAS 1290
CALC_GOR 1333
CASING_PRESS 650
GRAVITY_OIL 46
MCF_GAS 24
TUBING_PRESS 600
Perforation Data:
Interval Top:6711 ft.# Of Holes:42
Interval Bottom:6719 ft.Hole Size:0.34 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 11/21/2019                Interval Top: 6455 ft.    Interval Bottom: 6719 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/16/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:6697 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2011Test Method:
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 19
BTU_GAS 1236
CALC_BBLS_H2O 5
CALC_BBLS_OIL 19
CALC_GOR 4474
CALC_MCF_GAS 85
CASING_PRESS 1250
GRAVITY_OIL 46
MCF_GAS 85
TUBING_PRESS 780
Perforation Data:
Interval Top:6455 ft.# Of Holes:70
Interval Bottom:6719 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/25/2011                 Interval Top: 6455 ft.    Interval Bottom: 6552 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/11/2011
Treatment Summary:Perf Niobrara "A" 6455'-6457' (4 holes), Niobrara "B" 6544'-6552' (24 holes) Frac'd Niobrara W/ 119 bbl FE-1A pad,1549 bbls of slickwater pad, 144 bbls of pHaser 20# pad, 2314 bbls 20# pHaser, 240300# 20/40, 12,000# 20/40 SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6455 ft.# Of Holes:28
Interval Bottom:6552 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/21/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No