Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21007
Well Classification: OW Status: PA - 11/21/2019
Well Name/No:WELLS RANCH #44-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/21/2019
FacilityID:264083LocationID:331630
County:WELD #123Location:SESE 34 6N63W 6
Field:WATTENBERG - #90750Elevation:4760 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:668FSL  658 FELLat/Long: 40.437546 / -104.416071Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.437420 / -104.415690Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 11/21/2019             Measured TD: 6908 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 11/21/2019
Wellbore Permit
Permit #:20041159 Expiration Date:6/14/2005
Proposed Depth/Form:7860 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: 318 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: DKGP , Formation: DAKOTA GROUP , Order: 318A , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2

Wellbore Completed
Completion Date:N/A
Spud Date:1/21/2005Spud Date Is:ACTUAL
Measured TD:6908 ft.Measured PB depth:6870 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:GR, IND, DENSITY, NEUTRON, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 408 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 0 ft., Bottom: 408 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6870 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 1818 ft., Bottom: 6870 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1818 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 287, Top: 273 ft., Bottom: 1818 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2736 ft.NN
PARKMAN3566 ft.NN
SUSSEX3890 ft.NN
SHANNON4198 ft.NN
NIOBRARA6445 ft.NN
FORT HAYS6664 ft.NN
CODELL6710 ft.NN
CARLILE6735 ft.NN
GREENHORN6771 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/20/2011                 Interval Top: 6711 ft.    Interval Bottom: 6719 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/11/2011
Treatment Summary:Re-Perf Codell 6711'-6719' (24 new holes) Original perf 6711'-3719' (18 holes) Re-Frac'd Codell w/ 119 bbl Active Pad, 596 bbls of 26# pHaser pad, 2056 bbls of 26# pHaser, 217220# 20/40 , 8000 #20/40 SB Excel
Formation Treatment
Treatment Date:2/1/2005
Treatment Summary:02/01/05 BJ SERVICES FRACED WITH 2677 BBL OF 20# VISTAR GEL, 217,700# OF 20/40 MESH SAND AND 8,000# OF 20/40 MESH SUPER LC RESIN SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 18
BTU_GAS 1290
CALC_GOR 1333
CASING_PRESS 650
GRAVITY_OIL 46
MCF_GAS 24
TUBING_PRESS 600
Perforation Data:
Interval Top:6711 ft.# Of Holes:42
Interval Bottom:6719 ft.Hole Size:0.34 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 11/21/2019                Interval Top: 6455 ft.    Interval Bottom: 6719 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/16/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:6697 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2011Test Method:
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 19
BTU_GAS 1236
CALC_BBLS_H2O 5
CALC_BBLS_OIL 19
CALC_GOR 4474
CALC_MCF_GAS 85
CASING_PRESS 1250
GRAVITY_OIL 46
MCF_GAS 85
TUBING_PRESS 780
Perforation Data:
Interval Top:6455 ft.# Of Holes:70
Interval Bottom:6719 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/25/2011                 Interval Top: 6455 ft.    Interval Bottom: 6552 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/11/2011
Treatment Summary:Perf Niobrara "A" 6455'-6457' (4 holes), Niobrara "B" 6544'-6552' (24 holes) Frac'd Niobrara W/ 119 bbl FE-1A pad,1549 bbls of slickwater pad, 144 bbls of pHaser 20# pad, 2314 bbls 20# pHaser, 240300# 20/40, 12,000# 20/40 SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6455 ft.# Of Holes:28
Interval Bottom:6552 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/21/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No