|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/7/2020 Measured TD: 8475 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/7/2020 | Wellbore Permit | DRIFTED | Permit #: | | Expiration Date: | 5/12/2012 | Proposed Depth/Form: | 8480 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1028 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 700, Top: 0 ft., Bottom: 1028 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8458 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 275, Top: 6800 ft., Bottom: 8458 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5449 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 250, Top: 4490 ft., Bottom: 5454 ft. |
| | |
Wellbore Completed | Completion Date: | 8/20/2002 | Spud Date: | 7/31/2002 | Spud Date Is: | ACTUAL | Measured TD: | 8475 ft. | Measured PB depth: | 8431 ft. | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec: Twp: | Footage: FL FL | Bottom Hole Location: | Sec: Twp: | Footage: | Log Types: | PEAILC, PENCNLD, PEML, C B L | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1028 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 700, Top: 0 ft., Bottom: 1028 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8458 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 6834 ft., Bottom: 8458 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5449 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 275, Top: 4490 ft., Bottom: 5453 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4645 ft. | | N | N | SHANNON | 5198 ft. | | N | N | NIOBRARA | 7342 ft. | | N | N | FORT HAYS | 7737 ft. | | N | N | CODELL | 7760 ft. | | N | N | J SAND | 8200 ft. | | N | N | DAKOTA | 8382 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/7/2020 Interval Top: 8202 ft. Interval Bottom: 8238 ft. Completed Information for Formation J SAND | 1st Production Date: | 8/25/2002 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/20/2002 | Treatment Summary: | FRAC'D J SAND W/383314# 20/40 MESH; 163422 GALLONS GELLED FLUID |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 3 | CALC_BBLS_OIL | 3 | CALC_GOR | 103000 | CALC_MCF_GAS | 309 | CASING_PRESS | 490 | GRAVITY_OIL | 60 | MCF_GAS | 309 | TUBING_PRESS | 310 |
| Perforation Data: | Interval Top: | 8202 ft. | # Of Holes: | 63 | Interval Bottom: | 8238 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/7/2020 Interval Top: 7362 ft. Interval Bottom: 7782 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 2/23/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/27/2011 | Treatment Summary: | NB PERF 7362-7612 HOLES 48 SIZE .42
(1/29/2011) Frac Niobrara A & B & C down 4-1/2" Csg w/ 462 gal 15% HCl & 242,676 gal Slickwater w/ 201,260# 40/70, 4,000# SB Excel.
CD PERF 7762-7782 HOLES 60 SIZE 0.38
(1/27/2011) Frac Codell down 4-1/2" Csg w/ 206,472 gal Slickwater w/ 150,300# 40/70, 4,000# SB Excel. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/16/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 73 | BTU_GAS | 1224 | CALC_BBLS_OIL | 73 | CALC_GOR | 740 | CALC_MCF_GAS | 54 | CASING_PRESS | 1450 | GRAVITY_OIL | 55 | MCF_GAS | 54 |
| Perforation Data: | Interval Top: | 7362 ft. | # Of Holes: | 108 | Interval Bottom: | 7782 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 01/07/2020 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|