Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20977
Well Classification: OW Status: PA - 10/7/2024
Well Name/No:WELLS RANCH #33-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/7/2024
FacilityID:263935LocationID:331609
County:WELD #123Location:NWSE 34 6N63W 6
Field:WATTENBERG - #90750Elevation:4770 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2005FSL  1974 FELLat/Long: 40.441226 / -104.420801Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.441250 / -104.420330Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 10/7/2024             Measured TD: 6954 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 10/7/2024
Wellbore Permit
Permit #:20041154 Expiration Date:6/14/2005
Proposed Depth/Form:7865 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: 318 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: DKGP , Formation: DAKOTA GROUP , Order: 318A , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2

Wellbore Completed
Completion Date:8/5/2004
Spud Date:7/18/2004Spud Date Is:ACTUAL
Measured TD:6954 ft.Measured PB depth:6943 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:GR, IND, DENSITY, NEUTRON, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 414 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 414 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6943 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 722, Top: 0 ft., Bottom: 6943 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2735 ft.NN
PARKMAN3588 ft.NN
SUSSEX3945 ft.NN
SHANNON4275 ft.NN
NIOBRARA6484 ft.NN
FORT HAYS6710 ft.NN
CODELL6755 ft.NN
CARLILE6782 ft.NN
GREENHORN6802 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/9/2024                  Interval Top: 6757 ft.    Interval Bottom: 6765 ft.

 Completed Information for Formation CODELL
1st Production Date:9/23/2004Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/13/2011
Treatment Summary:Re-Perf Codell 6757-6765 (24 new holes) Original perf 6757-6765' (24 holes) Re-Frac'd Codell w/ 120 bbl Active Pad, 596 bbls of 26# pHaser pad, 2015 bbls of 26# pHaser, 217010# 20/40 , 8000 lbs 20/40 SB Excel
Formation Treatment
Treatment Date:8/5/2004
Treatment Summary:8/4/04 BJ SERVICES FRACED WITH 2584 BBL OF 20# VISTAR GEL, 217,440# OF 20/40 MESH SAND AND 8,000# OF 20/40 MESH SUPER LC RESIN SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 35
BTU_GAS 1309
CALC_GOR 2171
CASING_PRESS 850
GRAVITY_OIL 46
MCF_GAS 76
TUBING_PRESS 775
Perforation Data:
Interval Top:6757 ft.# Of Holes:48
Interval Bottom:6765 ft.Hole Size:0.34 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/7/2024                 Interval Top: 6492 ft.    Interval Bottom: 6765 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/2/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 24
BTU_GAS 1352
CALC_BBLS_H2O 10
CALC_BBLS_OIL 24
CALC_GOR 2958
CALC_MCF_GAS 71
GRAVITY_OIL 46
MCF_GAS 71
Perforation Data:
Interval Top:6492 ft.# Of Holes:76
Interval Bottom:6765 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 1/9/2024                  Interval Top: 6492 ft.    Interval Bottom: 6594 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/2/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/13/2011
Treatment Summary:Perf Niobrara "A" 6492-6494' (4 holes), Niobrara "B" 6586'-6594' (24 holes) Frac'd Niobrara W/ , 120 bbl FE-1A pad,1548 bbls of slickwater pad, 144 bbls of pHaser 20# pad, 2283 bbls 20# pHaser, 238600# 20/40, 12,000# 20/40 SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6492 ft.# Of Holes:28
Interval Bottom:6594 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/07/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveYNoticed Date
04/25/2023
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No