Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20966
Well Classification: OW Status: PA - 10/21/2022
Well Name/No:WELLS RANCH #31-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/21/2022
FacilityID:263914LocationID:331599
County:WELD #123Location:NWNE 34 6N63W 6
Field:WATTENBERG - #90750Elevation:4815 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:667FNL  1997 FELLat/Long: 40.448485 / -104.420881Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.448440 / -104.420780Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/1/2012
End Date: 10/3/2012
Reported: 12/3/2012
Days to report: 61
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 10/21/2022             Measured TD: 7041 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 10/21/2022
Wellbore PermitDRIFTED
Permit #:20041152 Expiration Date:6/14/2005
Proposed Depth/Form:7920 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: 318 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: DKGP , Formation: DAKOTA GROUP , Order: 318A , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2

Wellbore Completed
Completion Date:5/9/2005
Spud Date:5/5/2005Spud Date Is:ACTUAL
Measured TD:7041 ft.Measured PB depth:6997 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:DENSITY, NEUTRON, INDUCTION, GAMMA RAY, CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 405 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 0 ft., Bottom: 405 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7012 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 460, Top: 3046 ft., Bottom: 7012 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3046 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 485, Top: 400 ft., Bottom: 3046 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2930 ft.NN
PARKMAN3640 ft.NN
SUSSEX4010 ft.NN
SHANNON4340 ft.NN
NIOBRARA6551 ft.NN
FORT HAYS6760 ft.NN
CODELL6824 ft.NN
CARLILE6851 ft.NN
GREENHORN6890 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/30/2012                Interval Top: 6826 ft.    Interval Bottom: 6834 ft.

 Completed Information for Formation CODELL
1st Production Date:7/28/2005Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/1/2012Treatment End Date:10/1/2012
Treatment Summary:(217,140 lbs Preferred Rock 20/40) (8400 lbs 20/40 SB ExcelMTP = 6544 psi, ATP = 5489 psi, AIR = 21.3 bpm. Pressure response was slightly positive for entire treatment.
Total fluid used in treatment (bbls):2745Max pressure during treatment (psi):6544
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.21
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):119Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):7
Fresh water used in treatment (bbls):2626Disposition method For flowback:DISPOSAL
Total proppant used (lbs):225540Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:5/25/2005
Treatment Summary:5/25/05 B J SERVICES FRACED WITH 2580 BBL OF VISTAR 26# GEL SYSTEM USING 217420# OF 20/40 FRAC SAND AND 8000# OF RESIN COATED SUPER LC 20/40 MESH SAND
Tubing Size:2.875 in.Tubing Setting Depth:6747 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 56
BTU_GAS 1188
CALC_GOR 1732
CASING_PRESS 270
GRAVITY_OIL 46
MCF_GAS 97
TUBING_PRESS 250
Perforation Data:
Interval Top:6826 ft.# Of Holes:24
Interval Bottom:6834 ft.Hole Size:0.40625 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/21/2022                Interval Top: 6569 ft.    Interval Bottom: 6834 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/29/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/31/2012Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 7
BBLS_OIL 32
BTU_GAS 1360
CALC_BBLS_H2O 7
CALC_BBLS_OIL 32
CALC_GOR 125
CALC_MCF_GAS 4
CASING_PRESS 860
GRAVITY_OIL 44
MCF_GAS 4
TUBING_PRESS 740
Perforation Data:
Interval Top:6569 ft.# Of Holes:52
Interval Bottom:6834 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/29/2012                Interval Top: 6569 ft.    Interval Bottom: 6664 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/29/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/3/2012Treatment End Date:10/3/2012
Treatment Summary:Nio Bench "A"@ 6569-6571, Bench "B"@ 6656-6664. 238,180 LBS/24/40 Preffered Rock, 12,940 20/40 SB Excel. MTP 7485 ATP 6657. Pressure Response was slightly negative for entire treatment.
Total fluid used in treatment (bbls):4070Max pressure during treatment (psi):7485
Total gas used in treatment (mcf):Fluid density (lbs/gal):6.17
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):7
Fresh water used in treatment (bbls):4046Disposition method For flowback:DISPOSAL
Total proppant used (lbs):251120Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:6450 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6569 ft.# Of Holes:28
Interval Bottom:6664 ft.Hole Size:0.421875 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/21/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No