Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20902
Well Classification: OW Status: PR - 12/1/2025
Well Name/No:HOFFMAN #34-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:STRACHAN EXPLORATION INC - 83130
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2025
FacilityID:263495LocationID:331558
County:WELD #123Location:NENE 34 8N60W 6
Field:CROW - #13600Elevation:4896 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:628FNL  605 FELLat/Long: 40.624255 / -104.070771Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.624360 / -104.070741Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2025             Measured TD: 7013 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2025
Wellbore Permit
Permit #:20020855 Expiration Date:5/2/2003
Proposed Depth/Form:7034 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318 , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 406 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 285, Top: 0 ft., Bottom: 406 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7013 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 250, Top: 5956 ft., Bottom: 7013 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:6/6/2002Spud Date Is:ACTUAL
Measured TD:7013 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:ILD, GR, CNL, FDC, SP
Log Types:
Log Types:ILD, GR, CNL, FDC, SP
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 406 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 285, Top: 0 ft., Bottom: 406 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7013 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 5962 ft., Bottom: 7013 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 600 ft., Bottom: 600 ft., Sacks: 230, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6135 ft.NN
FORT HAYS6370 ft.NN
CODELL6428 ft.NN
BENTONITE6747 ft.NN
D SAND6852 ft.
MOWRY6923 ft.NN
J SAND6938 ft.NN

Formation DSND                     Formation Classification:  OW                     Status:  PR - 12/1/2025                 Interval Top: 6854 ft.    Interval Bottom: 6864 ft.

 Completed Information for Formation D SAND
1st Production Date:6/28/2002Choke Size: 
Formation Name:D SANDCommingled:
Production Method:CASING SWAB
Open Hole Completion:
Formation Treatment
Treatment Date:6/20/2002
Treatment Summary:FRAC'D W/31,000 GAL X-LINKED FLUID & 50,000# 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:6853 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/28/2002Test Method:CASING SWAB
Hours Tested:10Gas Type:WET
Gas Disposal:VENTED
Test TypeMeasure
BBLS_H2O 45
BBLS_OIL 45
BTU_GAS 1100
CALC_BBLS_H2O 108
CALC_BBLS_OIL 108
CASING_PRESS 500
GRAVITY_OIL 39
TUBING_PRESS 20
Perforation Data:
Interval Top:6854 ft.# Of Holes:28
Interval Bottom:6864 ft.Hole Size:0.375 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)252
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day0.690
Average MCFE per Day4.003

 Federal Financial Assurance  i 

 Tribal Well  i No