|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 9/1/2024 Measured TD: 8180 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 9/1/2024 | Wellbore Permit | | Permit #: | | Expiration Date: | 5/4/2013 | Proposed Depth/Form: | 8180 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 80, Drill Unit: E/2NE4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2NE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 715 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 520, Top: 0 ft., Bottom: 715 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8168 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 370, Top: 6197 ft., Bottom: 8168 ft. |
| | |
Wellbore Completed | Completion Date: | 6/25/2002 | Spud Date: | 5/13/2002 | Spud Date Is: | ACTUAL | Measured TD: | 8180 ft. | Measured PB depth: | 8153 ft. | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec: Twp: | Footage: FL FL | Bottom Hole Location: | Sec: Twp: | Footage: | Log Types: | DIGLGR, CDCNGR, C B L | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 715 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 520, Top: 0 ft., Bottom: 715 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8169 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 370, Top: 6200 ft., Bottom: 8169 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4511 ft. | | N | N | NIOBRARA | 7150 ft. | | N | N | FORT HAYS | 7374 ft. | | N | N | CODELL | 7401 ft. | | N | N | J SAND | 7859 ft. | | N | N | DAKOTA | 8058 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: TA - 8/25/2009 Interval Top: 8082 ft. Interval Bottom: 8108 ft. Completed Information for Formation DAKOTA | 1st Production Date: | 6/1/2005 | Choke Size: | | Formation Name: | DAKOTA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/25/2002 | Treatment Summary: | CIBP PLACED @ 7800 WITH 2 SACKS OF CEMENT FOR MECHANICAL INTEGRITY. OUT INTENT IS TO DRILL OUT CIPB AND CEMENT TO COMMINGLE WELL WITHIN THE NEXT SIX MONTHS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 1 | CALC_BBLS_OIL | 1 | CALC_GOR | 225000 | CALC_MCF_GAS | 225 | CASING_PRESS | 580 | GRAVITY_OIL | 60 | MCF_GAS | 225 | TUBING_PRESS | 275 |
| Perforation Data: | Interval Top: | 8082 ft. | # Of Holes: | 78 | Interval Bottom: | 8108 ft. | Hole Size: | 0.38 in. |
|
Formation JSND Formation Classification: GW Status: TA - 8/25/2009 Interval Top: 7859 ft. Interval Bottom: 7922 ft. Completed Information for Formation J SAND | 1st Production Date: | 1/13/2003 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/24/2003 | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 2 | CALC_BBLS_OIL | 2 | CALC_GOR | 189000 | CALC_MCF_GAS | 378 | CASING_PRESS | 580 | GRAVITY_OIL | 60 | MCF_GAS | 378 | TUBING_PRESS | 300 |
| Perforation Data: | Interval Top: | 7859 ft. | # Of Holes: | 92 | Interval Bottom: | 7922 ft. | Hole Size: | 0.38 in. |
|
Formation GRNHN Formation Classification: GW Status: TA - 8/11/2011 Interval Top: 7630 ft. Interval Bottom: 7675 ft. Completed Information for Formation GREENHORN | 1st Production Date: | 10/9/2009 | Choke Size: | | Formation Name: | GREENHORN | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/7/2011 | Treatment Summary: | SAND PLUG SET @ 7780 | Formation Treatment | Treatment Date: | 9/29/2009 | Treatment Summary: | 1000 GAL 15% HC1. 250418 GAL SW W/ 83000# 40/70 & 50000# 100 MESH. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1201 | CALC_BBLS_OIL | 2 | CALC_GOR | 31500 | CALC_MCF_GAS | 63 | CASING_PRESS | 245 | GRAVITY_OIL | 59 | TUBING_PRESS | 99 |
| Perforation Data: | Interval Top: | 7630 ft. | # Of Holes: | 90 | Interval Bottom: | 7675 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 7/1/2022 Interval Top: 7177 ft. Interval Bottom: 7416 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 7/6/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/30/2011 | Treatment Summary: | NB PERF: 7177-7260 HOLES 66 SIZE .42 CD PERF: 7402-7416 HOLES 56 SIZE .38
Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 243,037 gal Slickwater w/ 201,560# 40/70, 4,000# SB Excel.
Frac Codell down 4-1/2" Csg w/ 194,813 gal Slickwater w/ 150,720# 40/70, 4,180# SB Excel. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7357 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/8/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 19 | BTU_GAS | 1230 | CALC_BBLS_OIL | 19 | CALC_GOR | 9526 | CALC_MCF_GAS | 181 | CASING_PRESS | 707 | GRAVITY_OIL | 59 | MCF_GAS | 181 | TUBING_PRESS | 459 |
| Perforation Data: | Interval Top: | 7177 ft. | # Of Holes: | 122 | Interval Bottom: | 7416 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 01/06/2025 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 12/04/2023 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|