|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/1/2025 Measured TD: 7969 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/1/2025 | | Wellbore Permit | | | Permit #: | 20020573 | Expiration Date: | 3/27/2003 | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 80, Drill Unit: W/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232,218A , Unit Acreage: 320, Drill Unit: S/2 |
| | |
| Wellbore Completed | | Completion Date: | 6/10/2002 | | Spud Date: | 5/17/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 7969 ft. | Measured PB depth: | 7923 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | CD / CN, DUAL IND, C B L | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 555 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 0 ft., Bottom: 555 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7969 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 6680 ft., Bottom: 7969 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4261 ft. | | N | N | | SHANNON | 4775 ft. | | N | N | | NIOBRARA | 7133 ft. | | N | N | | FORT HAYS | 7376 ft. | | N | N | | CODELL | 7397 ft. | | N | N | | CARLILE | 7420 ft. | | N | N | | GREENHORN | 7438 ft. | | N | N | | GRANEROS | 7652 ft. | | N | N | | BENTONITE | 7652 ft. | | N | N | | MOWRY | 7792 ft. | | N | N | | J-2 SAND | 7809 ft. | | N | N | | SKULL CREEK | 7909 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 4/1/2025 Interval Top: 7811 ft. Interval Bottom: 7877 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | 1.000 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/10/2002 | | Treatment Summary: | PERF J SAND 7811'-7826' & 7833'-7877' W/2 SPF. FRAC W/550,780# 20/40 SAND AND 189,924 GALS DYNAFLOW-2. RUN PROD TBG. SWAB TEST. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7801 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/26/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | CALC_BBLS_H2O | 7 | | CALC_GOR | 155172 | | CALC_MCF_GAS | 45 | | CASING_PRESS | 690 | | MCF_GAS | 45 | | TUBING_PRESS | 270 |
| | Perforation Data: | | Interval Top: | 7811 ft. | # Of Holes: | 118 | | Interval Bottom: | 7877 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 8/1/2013 Interval Top: 7398 ft. Interval Bottom: 7418 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/20/2013 | Treatment End Date: | 6/20/2013 | | Treatment Summary: | Set CIBP @ 7530'. Frac the Codell w/500,680 # sand and 174,523 gals (4155 bbls) frac fluid. | | Total fluid used in treatment (bbls): | 4155 | Max pressure during treatment (psi): | 4492 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.88 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 624 | | Fresh water used in treatment (bbls): | 4155 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 500680 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 6/10/2002 | | Treatment Summary: | SET CIBP @ 7540'. PERF CODELL SAND FROM 7402'-7412' W/4 SPF. FRAC W/300,000# 20/40 SAND IN 133,518 GALS DYNAFLOW 2. FLOW BACK WELL. DRILL OUT CMT& CIBP. RUN PROD TBG. SWAB. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BBLS_OIL | 47 | | CALC_BBLS_H2O | 25 | | CALC_BBLS_OIL | 47 | | CALC_GOR | 3511 | | CALC_MCF_GAS | 165 | | CASING_PRESS | 850 | | MCF_GAS | 165 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 7398 ft. | # Of Holes: | 120 | | Interval Bottom: | 7418 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/1/2013 Interval Top: 7180 ft. Interval Bottom: 7877 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/10/2013 | Treatment End Date: | N/A | | Treatment Summary: | Drill out plugs on 6/25/13. Set tubing at 7770' to commingle the J-Niobrara-Codell. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 6/10/2002 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED UP CFP @ 7280' & CBP @7500' TO COMMINGLE THE JSND-NBRR-CODL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7770 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/10/2013 | Test Method: | FLOW | | Hours Tested: | 6 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 10 | | BTU_GAS | 1294 | | CALC_BBLS_H2O | 60 | | CALC_BBLS_OIL | 40 | | CALC_GOR | 12800 | | CALC_MCF_GAS | 512 | | CASING_PRESS | 611 | | GRAVITY_OIL | 59 | | MCF_GAS | 128 | | TUBING_PRESS | 265 |
| | Perforation Data: | | Interval Top: | 7180 ft. | # Of Holes: | 318 | | Interval Bottom: | 7877 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 4/1/2025 Interval Top: 7180 ft. Interval Bottom: 7418 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/2/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/11/2008 | | Treatment Summary: | NB-CD REFRAC & RECOMPLETE: SET CBP@ 7500'. REFRAC'D CODL W/106,134 GAL FRAC GEL FLUID & 253,960# SAND. SET CFP@7280', FRAC'D NBRR W/142,044 GAL FRAC FLUID & 253,560# SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7180 ft. | # Of Holes: | 120 | | Interval Bottom: | 7418 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/17/2013 Interval Top: 7180 ft. Interval Bottom: 7200 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/23/2013 | Treatment End Date: | 6/23/2013 | | Treatment Summary: | Set CFP @ 7260'. Frac'd the Niobrara with 275,907 # sand and 122,447 gals (2916 bbls) frac fluid. | | Total fluid used in treatment (bbls): | 2916 | Max pressure during treatment (psi): | 5671 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.96 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 623 | | Fresh water used in treatment (bbls): | 2916 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 275907 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7180 ft. | # Of Holes: | 40 | | Interval Bottom: | 7200 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 231 |
| Total Gas Produced (MCF) | 8647 |
| GOR | 37432 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.691 |
| Average MCFE per Day | 27.221 |
| Federal Financial Assurance | i | |
|
|