|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 4/4/2025 Measured TD: 8401 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 4/4/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20020474 | Expiration Date: | 3/17/2003 | | Proposed Top PZ Location: | Sec:17 Twp: 2N 67W | Footage: 2080 FSL 2080 FWL | | Bottom Hole Location: | Sec:17 Twp: 2N 67W | Footage: 2080 FSL 2080 FWL | | Proposed Depth/Form: | 8500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318 A/232 , Unit Acreage: 320, Drill Unit: S/2 |
| | |
| Wellbore Completed | | Completion Date: | 5/13/2002 | | Spud Date: | 3/26/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 8401 ft. | Measured PB depth: | 8370 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | DIL, SP, GR, CD, CN, GR, CAL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 640 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 0 ft., Bottom: 640 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8401 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 7006 ft., Bottom: 8401 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5180 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 3875 ft., Bottom: 5184 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7550 ft. | | N | N | | FORT HAYS | 7796 ft. | | N | N | | CODELL | 7817 ft. | | N | N | | CARLILE | 7834 ft. | | N | N | | GREENHORN | 7866 ft. | | N | N | | GRANEROS | 8077 ft. | | N | N | | BENTONITE | 8077 ft. | | N | N | | MOWRY | 8222 ft. | | N | N | | J-2 SAND | 8238 ft. | | N | N | | SKULL CREEK | 8322 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 4/4/2025 Interval Top: 8239 ft. Interval Bottom: 8288 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/13/2002 | | Treatment Summary: | SAME DOC# |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 58 | | BBLS_OIL | 6 | | CALC_BBLS_H2O | 58 | | CALC_BBLS_OIL | 6 | | CALC_GOR | 101500 | | CALC_MCF_GAS | 609 | | CASING_PRESS | 920 | | MCF_GAS | 609 | | TUBING_PRESS | 730 |
| | Perforation Data: | | Interval Top: | 8239 ft. | # Of Holes: | 164 | | Interval Bottom: | 8288 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 1/13/2025 Interval Top: 7818 ft. Interval Bottom: 7832 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/13/2002 | | Treatment Summary: | SEE SCANNED DOC# 1197597 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 32 | | BBLS_OIL | 57 | | CALC_BBLS_H2O | 32 | | CALC_BBLS_OIL | 57 | | CALC_GOR | 4018 | | CALC_MCF_GAS | 229 | | CASING_PRESS | 100 | | MCF_GAS | 229 |
| | Perforation Data: | | Interval Top: | 7818 ft. | # Of Holes: | 56 | | Interval Bottom: | 7832 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/17/2008 Interval Top: 7604 ft. Interval Bottom: 8288 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/13/2002 | | Treatment Summary: | DRILLED OUT CFP & CBP TO COMMINGLE THE JSND-NBRR-CODL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8225 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/17/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BBLS_OIL | 28 | | BTU_GAS | 1240 | | CALC_BBLS_H2O | 25 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 8107 | | CALC_MCF_GAS | 227 | | CASING_PRESS | 711 | | GRAVITY_OIL | 49 | | MCF_GAS | 227 | | TUBING_PRESS | 358 |
| | Perforation Data: | | Interval Top: | 7604 ft. | # Of Holes: | 296 | | Interval Bottom: | 8288 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/4/2025 Interval Top: 7604 ft. Interval Bottom: 7832 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/17/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/18/2008 | | Treatment Summary: | NB-CD REFRAC & RECOMPLTN. SET CBP @7920'. REFRACD CODL W/109,578 GAL FRAC GEL FLUID & 253,140# SAND. SET CFP @7710'. FRACD NBRR W/169,554 GAL FRAC FLUID & 253,040# SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7604 ft. | # Of Holes: | 88 | | Interval Bottom: | 7832 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 1/15/2025 Interval Top: 7604 ft. Interval Bottom: 7620 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7604 ft. | # Of Holes: | 32 | | Interval Bottom: | 7620 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/04/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 02/29/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|