Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20775
Well Classification: GW Status: PA - 7/23/2025
Well Name/No:MILLER #22-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/23/2025
FacilityID:262693LocationID:336479
County:WELD #123Location:NENW 17 2N67W 6
Field:WATTENBERG - #90750Elevation:4925 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:510FNL  1858 FWLLat/Long: 40.144107 / -104.917694Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.144224 / -104.917467Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/18/2013
End Date: 6/19/2013
Reported: 8/5/2013
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 7/23/2025             Measured TD: 8454 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 7/23/2025
Wellbore PermitDIRECTIONAL
Permit #:20021821 Expiration Date:10/20/2003
Proposed Top PZ Location:Sec: Twp: Footage: 2080 FNL  2080 FWL
Bottom Hole Location:Sec: Twp: Footage: 2080 FNL  2080 FWL
Proposed Depth/Form:8454 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407, 407-6, Unit Acreage: 160, Drill Unit: NW/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318A/232 , Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: SNSD , Formation: SHANNON , Order: 250 , Unit Acreage: 160, Drill Unit: NW/4
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5200 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4200 ft., Bottom: 5200 ft.

Wellbore Completed
Completion Date:4/8/2002
Spud Date:2/12/2002Spud Date Is:ACTUAL
Measured TD:8454 ft.Measured PB depth:8422 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 2080 FNL  2080 FWL
Bottom Hole Location:Sec: Twp: Footage: 2080 FNL  2080 FWL
Log Types:RST, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 658 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 638 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8456 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 232, Top: 6975 ft., Bottom: 8456 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5215 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 3704 ft., Bottom: 5270 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7605 ft.NN
FORT HAYS7841 ft.NN
CODELL7863 ft.NN
CARLILE7882 ft.NN
GREENHORN7902 ft.NN
GRANEROS8131 ft.NN
BENTONITE8131 ft.NN
MOWRY8282 ft.NN
J-2 SAND8298 ft.NN
SKULL CREEK8396 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 7/23/2025                 Interval Top: 8310 ft.    Interval Bottom: 8354 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/8/2002
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 22
BBLS_OIL 3
CALC_BBLS_H2O 22
CALC_BBLS_OIL 3
CALC_GOR 15466
CALC_MCF_GAS 464
CASING_PRESS 800
MCF_GAS 464
TUBING_PRESS 500
Perforation Data:
Interval Top:8310 ft.# Of Holes:128
Interval Bottom:8354 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 1/10/2003                 Interval Top: 7880 ft.    Interval Bottom: 8310 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/8/2002
Treatment Summary:SEE SCANNED DOC# 1336650
Tubing Size:2.375 in.Tubing Setting Depth:8250 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/10/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 49
CALC_BBLS_H2O 10
CALC_BBLS_OIL 49
CALC_GOR 8388
CALC_MCF_GAS 411
CASING_PRESS 700
MCF_GAS 411
TUBING_PRESS 300
Perforation Data:
Interval Top:7880 ft.# Of Holes:184
Interval Bottom:8310 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/13/2013                 Interval Top: 7864 ft.    Interval Bottom: 7884 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/15/2013Treatment End Date:6/15/2013
Treatment Summary:Set CIBP @ 7960'. Frac Codell w/250,000 # sand and 79,800 gals (1900 bbls) frac fluid.
Total fluid used in treatment (bbls):1900Max pressure during treatment (psi):4812
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.65
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):551
Fresh water used in treatment (bbls):1900Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/8/2002
Treatment Summary:SET RBP @ 8000'/ RE[ERF TJE CPD; FRP, 7866'-7880' W4S[F/ FRAC W277,278# 20/40 FRAC SAND AND 133,300 GALS DYNAFLOW-2. FLOW BACK WELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 36
BBLS_OIL 62
CALC_BBLS_H2O 36
CALC_BBLS_OIL 62
CALC_GOR 2806
CALC_MCF_GAS 174
MCF_GAS 174
TUBING_PRESS 410
Perforation Data:
Interval Top:7864 ft.# Of Holes:136
Interval Bottom:7884 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 5/15/2008                 Interval Top: 7656 ft.    Interval Bottom: 8354 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/8/2002
Treatment Summary:RELEASED RBP @7760'. RELEASED RBP @ 8000' TO C OMMINGLE JSND-NBRR-CODL.
Tubing Size:2.375 in.Tubing Setting Depth:8250 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/15/2008Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 21
BTU_GAS 1240
CALC_BBLS_H2O 6
CALC_BBLS_OIL 21
CALC_GOR 1338
CALC_MCF_GAS 281
CASING_PRESS 979
GRAVITY_OIL 49
MCF_GAS 281
TUBING_PRESS 436
Perforation Data:
Interval Top:7656 ft.# Of Holes:240
Interval Bottom:8354 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 7/23/2025                 Interval Top: 7652 ft.    Interval Bottom: 7884 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:7/5/2013Treatment End Date:N/A
Treatment Summary:Landed tbg @ 7820' and turned to production on 7/17/13. The Niobrara and Codell are commingled.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/27/2008
Treatment Summary:NB-CD REFRAC & RECOMPLTN. SET RBP @8000'. REFRACD CODL W/106,974 GAL FRAC FLUID GEL & 253,080# SAND. SET RBP @7760'. FRAC'D NBRR W/169,260 GAL FRAC FLUID & 254,020# 20/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:7820 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/5/2013Test Method:FLOW
Hours Tested:6Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 24
BTU_GAS 1324
CALC_BBLS_H2O 32
CALC_BBLS_OIL 96
CALC_GOR 8042
CALC_MCF_GAS 772
CASING_PRESS 855
GRAVITY_OIL 56
MCF_GAS 193
TUBING_PRESS 631
Perforation Data:
Interval Top:7652 ft.# Of Holes:272
Interval Bottom:7884 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/29/2013                Interval Top: 7652 ft.    Interval Bottom: 7678 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/15/2013Treatment End Date:6/15/2013
Treatment Summary:Perforate @ 7652 -7678 w/4 spf. Frac Niobrara w/250,120 # sand and 86,810 gals (2067 bbls) frac fluid.
Total fluid used in treatment (bbls):2067Max pressure during treatment (psi):4812
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.79
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):551
Fresh water used in treatment (bbls):2067Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250120Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7652 ft.# Of Holes:136
Interval Bottom:7678 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/23/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2027
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No