|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 7/25/2018 Measured TD: 8160 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 7/25/2018 | Wellbore Permit | DRIFTED | Permit #: | | Expiration Date: | 1/2/2013 | Proposed Depth/Form: | 8160 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2SE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 845 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 595, Top: 0 ft., Bottom: 845 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8153 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 260, Top: 5910 ft., Bottom: 8153 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4957 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 345, Top: 3531 ft., Bottom: 4965 ft. |
| | |
Wellbore Completed | Completion Date: | 3/21/2002 | Spud Date: | 3/2/2002 | Spud Date Is: | ACTUAL | Measured TD: | 8160 ft. | Measured PB depth: | 8122 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DIGLGR, CDCNGR, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 845 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 595, Top: 0 ft., Bottom: 845 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8153 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 260, Top: 5890 ft., Bottom: 8153 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4957 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 345, Top: 3531 ft., Bottom: 4965 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4957 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 270, Top: 3531 ft., Bottom: 4970 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4583 ft. | | N | N | NIOBRARA | 7214 ft. | | N | N | FORT HAYS | 7558 ft. | | N | N | CODELL | 7581 ft. | | N | N | J SAND | 7994 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 7/25/2018 Interval Top: 7994 ft. Interval Bottom: 8033 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/28/2002 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/25/2011 | Treatment Summary: | SAND PLUG SET @ 7698' | Formation Treatment | Treatment Date: | 3/21/2002 | Treatment Summary: | FRAC'D J SAND W/501540# 20/40 MESH; 209421 GAL. GELLED FLUID |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 11 | CALC_BBLS_OIL | 11 | CALC_GOR | 40000 | CALC_MCF_GAS | 440 | CASING_PRESS | 425 | GRAVITY_OIL | 57 | MCF_GAS | 440 | TUBING_PRESS | 425 |
| Perforation Data: | Interval Top: | 7994 ft. | # Of Holes: | 102 | Interval Bottom: | 8033 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/25/2018 Interval Top: 7351 ft. Interval Bottom: 7596 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/8/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/30/2011 | Treatment Summary: | Frac Niobrara B & C down 2-7/8" Tbg w/ Pkr ^ Nio w/ 252 gal 15% HCl & 172,074 gal Vistar Hybrid w/ 251,860# 20/40, 4,300# SB Excel, 0# .
Frac Codell down 2-7/8" Tbg w/ Pkr ^ Nio w/ 204,666 gal Slickwater w/ 150,100# 40/70, 4,140# SB Excel, 0# . |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/27/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 34 | BTU_GAS | 1239 | CALC_BBLS_OIL | 34 | CALC_GOR | 5265 | CALC_MCF_GAS | 179 | CASING_PRESS | 1500 | GRAVITY_OIL | 58 | MCF_GAS | 179 |
| Perforation Data: | Interval Top: | 7351 ft. | # Of Holes: | 110 | Interval Bottom: | 7596 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 07/25/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|