|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/29/2018 Measured TD: 7956 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/29/2018 | Wellbore Permit | DRIFTED | Permit #: | | Expiration Date: | 10/18/2010 | Proposed Depth/Form: | 7956 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 759 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 560, Top: 10 ft., Bottom: 759 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7941 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 230, Top: 6941 ft., Bottom: 7941 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4973 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 225, Top: 3934 ft., Bottom: 4975 ft. |
| | |
Wellbore Completed | Completion Date: | 10/4/2002 | Spud Date: | 9/19/2002 | Spud Date Is: | ACTUAL | Measured TD: | 7956 ft. | Measured PB depth: | 7926 ft. | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec: Twp: | Footage: FL FL | Bottom Hole Location: | Sec: Twp: | Footage: | Log Types: | CDCNGR, DIGLGR, C B L | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 759 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 560, Top: 0 ft., Bottom: 759 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7941 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 230, Top: 6474 ft., Bottom: 7941 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4973 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 225, Top: 3934 ft., Bottom: 4975 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4973 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 225, Top: 3925 ft., Bottom: 4976 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4340 ft. | | N | N | NIOBRARA | 7080 ft. | | N | N | CODELL | 7345 ft. | | N | N | FORT HAYS | 7373 ft. | | N | N | J SAND | 7784 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 8/29/2018 Interval Top: 7804 ft. Interval Bottom: 7840 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/20/2010 | Treatment Summary: | SET SAND PLUG @ 7580' FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT THE SAND PLUG AND COMMINGLE THE WELL IN THE NEXT SIX MONTHS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 2 | CALC_BBLS_OIL | 2 | CALC_GOR | 127500 | CALC_MCF_GAS | 255 | CASING_PRESS | 500 | GRAVITY_OIL | 60 | MCF_GAS | 255 | TUBING_PRESS | 200 |
| Perforation Data: | Interval Top: | 7804 ft. | # Of Holes: | 108 | Interval Bottom: | 7840 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/29/2018 Interval Top: 7114 ft. Interval Bottom: 7362 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 2/12/2010 | Choke Size: | 0.250 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/20/2010 | Treatment Summary: | NB PERF 7114-7222 HOLES 64 SIZE 0.42. CD PERF 7348-7362 HOLES 56 SIZE 0.38. FRAC NB W/500 GAL 15% HC1 & 242,617 GAL SW W/201,080# 40/70 & 4,320# 20/40 SB EXCEL. FRAC CD W/202,033 GAL SW W/150,680# 40/70 & 4,280# 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/24/2010 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1179 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 0 | CALC_GOR | 0 | CALC_MCF_GAS | 127 | CASING_PRESS | 7 | GRAVITY_OIL | 48 |
| Perforation Data: | Interval Top: | 7114 ft. | # Of Holes: | 120 | Interval Bottom: | 7362 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 08/29/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|