Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20731
Well Classification: GW Status: SI - 7/1/2022
Well Name/No:IONE #34-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2022
FacilityID:262191LocationID:331474
County:WELD #123Location:SWSE 10 2N66W 6
Field:WATTENBERG - #90750Elevation:4990 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:460FSL  2180 FELLat/Long: 40.146567 / -104.761759Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.146703 / -104.761635Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 7/1/2022             Measured TD: 8212 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 7/1/2022
Wellbore Permit
Permit #:20022159 Expiration Date:11/24/2003
Proposed Depth/Form:8212 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318A,232 , Unit Acreage: 320, Drill Unit: E2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5000 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4100 ft., Bottom: 5000 ft.

Wellbore Completed
Completion Date:4/13/2002
Spud Date:3/5/2002Spud Date Is:ACTUAL
Measured TD:8212 ft.Measured PB depth:8202 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND, CD/CN, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 912 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 344, Top: 0 ft., Bottom: 912 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8219 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 6636 ft., Bottom: 8219 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5206 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 3956 ft., Bottom: 5210 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4513 ft.NN
SHANNON5143 ft.NN
NIOBRARA7178 ft.NN
FORT HAYS7421 ft.NN
CODELL7447 ft.NN
CARLILE7465 ft.NN
GREENHORN7510 ft.NN
GRANEROS7727 ft.NN
BENTONITE7727 ft.NN
MOWRY7881 ft.NN
J-2 SAND7905 ft.NN
SKULL CREEK8008 ft.NN
DAKOTA8094 ft.NN

Formation DKTA                     Formation Classification:  GW                     Status:  AB - 3/28/2002                 Interval Top: 8096 ft.    Interval Bottom: 8102 ft.

 Completed Information for Formation DAKOTA
1st Production Date:N/AChoke Size: 
Formation Name:DAKOTACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/13/2002
Treatment Summary:DRILL OUT CEMENT. PERF DAKOTA FROM 8096-8102'. SET PKR @ 7956'. BREAKDOWN FM. SWAB & EVALUATE. POOCH W/PKR. ABANDON ZONE.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation DKTA.
Perforation Data:
Interval Top:8096 ft.# Of Holes:24
Interval Bottom:8102 ft.Hole Size:0.38 in.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 7/1/2022                  Interval Top: 7905 ft.    Interval Bottom: 7958 ft.

 Completed Information for Formation J SAND
1st Production Date:4/18/2002Choke Size:0.250 in.
Formation Name:J SANDCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/30/2002
Treatment Summary:PERF J SAND FROM 7905-7910 & 7927-7958' W/4 SPF. FRAC W/ 559,400# 20/40 SAND IN 193,872 GALS DYNAFLOW -2. RUN PROD TBG. FLOW BACK FRAC.
Tubing Size:2.375 in.Tubing Setting Depth:7904 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 35
BBLS_OIL 10
CALC_BBLS_H2O 35
CALC_BBLS_OIL 10
CALC_GOR 48770
CALC_MCF_GAS 488
CASING_PRESS 560
MCF_GAS 488
TUBING_PRESS 380
Perforation Data:
Interval Top:7905 ft.# Of Holes:144
Interval Bottom:7958 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/21/2003                 Interval Top: 7448 ft.    Interval Bottom: 7464 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/21/2003
Treatment Summary:TAG SAND @ 7528'. PERF'D THE CODELL FROM 7448-7464' W/ 4 SPF. FRAC'D THE CODELL W/ 300,000# 20/40 FRAC SAND. FLOW BACK WELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/21/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 29
BBLS_OIL 38
CALC_BBLS_H2O 29
CALC_BBLS_OIL 38
CALC_GOR 4158
CALC_MCF_GAS 158
CASING_PRESS 100
MCF_GAS 158
Perforation Data:
Interval Top:7448 ft.# Of Holes:64
Interval Bottom:7464 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 3/20/2003                 Interval Top: 7448 ft.    Interval Bottom: 7958 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.281 in.
Formation Name:J-CODELLCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/20/2003
Treatment Summary:RIH W/TBG. LAND @ 7892' KB.
Tubing Size:2.375 in.Tubing Setting Depth:7892 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/20/2003Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 19
CALC_BBLS_H2O 13
CALC_BBLS_OIL 19
CALC_GOR 15105
CALC_MCF_GAS 267
CASING_PRESS 100
MCF_GAS 287
Perforation Data:
Interval Top:7448 ft.# Of Holes:208
Interval Bottom:7958 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 10/17/2009                Interval Top: 7210 ft.    Interval Bottom: 7910 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/17/2009
Treatment Summary:JSND-NBRR-CDL COMMINGLE DRILLED OUT CIBP'S TO COMMINGLE THE JSND-NBRR-CDL. 10/14/09
Formation Treatment
Treatment Date:2/19/2006
Treatment Summary:JSND-NBRR-CDL COMMINGLE -DRILLED OUT CBP'S TO COMMINGLE THE JSND-NBRR-CDL 02/16/06
Tubing Size:2.375 in.Tubing Setting Depth:787 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BBLS_OIL 18
BTU_GAS 1384
CALC_BBLS_H2O 16
CALC_BBLS_OIL 18
CALC_GOR 9944
CALC_MCF_GAS 179
CASING_PRESS 740
GRAVITY_OIL 52
MCF_GAS 179
TUBING_PRESS 375
Perforation Data:
Interval Top:7210 ft.# Of Holes:252
Interval Bottom:7910 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 7/1/2022                  Interval Top: 7210 ft.    Interval Bottom: 7464 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/17/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/8/2006
Treatment Summary:NBRR-CDL RECOMPLETION - SET CBP@7530'. RE-FRAC'D THE CODELL WITH 114,660 GAL 24# VISTAR CROSS LINKED GEL CONTAINING 251,160# 20/40 SAND. 9/13/09. SET CBP@7300 . 9/17/09. RE-FRAC'D THE NIOBRARA WITH 250,620# 20/40 SAND 3601 BBLS VISTAR 22 X6F. 9/21/09.
Formation Treatment
Treatment Date:2/7/2006
Treatment Summary:NBRR-CDL RECOMPLETION FRAC'D THE CODELL ( 7448-7464') WITH 300,000# FRAC SAND. 02-03 SET CBP @ 7350'. 02-05-06. FRAC'D THE NIOBRARA "B" (7210-7246') WITH 177,240 GAL FRAC FLUID AND 251,100# SAND. 02-08-06
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7210 ft.# Of Holes:228
Interval Bottom:7464 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
06/30/2022
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No