Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20722
Well Classification: GW Status: SI - 7/1/2022
Well Name/No:IONE #12-2B
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2022
FacilityID:262189LocationID:331467
County:WELD #123Location:SWNW 2 2N66W 6
Field:WATTENBERG - #90750Elevation:5020 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2180FNL  460 FWLLat/Long: 40.168457 / -104.752109Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.168476 / -104.752062Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 7/1/2022             Measured TD: 8232 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 7/1/2022
Wellbore Permit
Permit #:20030223 Expiration Date:2/9/2004
Proposed Depth/Form:8300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: W/2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 320, Drill Unit: W/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318A,232 , Unit Acreage: 320, Drill Unit: W/2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4100 ft., Bottom: 5100 ft.

Wellbore Completed
Completion Date:12/28/2003
Spud Date:4/5/2002Spud Date Is:ACTUAL
Measured TD:8232 ft.Measured PB depth:8080 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:CBL, CD/CN, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 821 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 0 ft., Bottom: 821 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8232 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 6784 ft., Bottom: 8232 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5393 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 313, Top: 4170 ft., Bottom: 5394 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4507 ft.NN
SUSSEX-MUDDY4788 ft.NN
SHANNON5162 ft.NN
NIOBRARA7271 ft.NN
FORT HAYS7450 ft.NN
CODELL7473 ft.NN
CARLILE7492 ft.NN
GREENHORN7537 ft.NN
GRANEROS7760 ft.NN
BENTONITE7760 ft.NN
MOWRY7913 ft.NN
J-2 SAND7927 ft.NN
J SAND7936 ft.NN
SKULL CREEK8028 ft.NN
DAKOTA8132 ft.NN
LYTLE8187 ft.NN

Formation DKTA                     Formation Classification:  GW                     Status:  AB - 5/2/2002                  Interval Top: 8134 ft.    Interval Bottom: 8146 ft.

 Completed Information for Formation DAKOTA
1st Production Date:5/2/2002Choke Size: 
Formation Name:DAKOTACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/28/2003
Treatment Summary:drill out cement, PERF DKTA FROM 8134-8146 W/2 SPF. RIH W/PKR AND FRAC TBG. PKR SET #7971. EOT @7999 SWAB. UNSET PKR POOH SET CIBP @8080 MOVE UP TO THE JSAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation DKTA.
Perforation Data:
Interval Top:8134 ft.# Of Holes:24
Interval Bottom:8146 ft.Hole Size:

Formation JSND                     Formation Classification:  GW                     Status:  SI - 7/1/2022                  Interval Top: 7928 ft.    Interval Bottom: 7998 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/28/2003
Treatment Summary:PERF THE J SAND FROM 7928'-7934, 7935-7950, 7956-7988' W/ 2 SPF. RIH W/ TBG. SWAB. FRAC THE J SAND W/ 395,804# 20/40 FRAC SAND AND 137,500 GALS DYNAFLOW-5 FRAC FLUID. FLOW BACK WELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/13/2003Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 66
BBLS_OIL 8
CALC_BBLS_H2O 10
CALC_BBLS_OIL 23
CALC_GOR 1535
CALC_MCF_GAS 36
CASING_PRESS 310
MCF_GAS 531
Perforation Data:
Interval Top:7928 ft.# Of Holes:124
Interval Bottom:7998 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  SI - 7/1/2022                  Interval Top: 7473 ft.    Interval Bottom: 7492 ft.

 Completed Information for Formation CODELL
1st Production Date:3/13/2003Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/6/2009
Treatment Summary:CDL RECOMPLETION SET RBP @ 7550. 8/02/09. RE-FRAC'D THE CODELL WITH 118,188 GAL 20# , 22# 24#,26#, VISTAR HYRID CROSS LINKED GEL CONTAINING 251,020# 20/40 SAND. 8/06/09
Formation Treatment
Treatment Date:3/13/2003
Treatment Summary:TAG SAND PLUG @ 7678' KB. PERF THE CODELL F/7473'-7492' W/ 4 SPF. FRAC THE CODELL W/ 300,000# 20/40 FRAC SAND. FLOW BACK WELL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 23
BBLS_OIL 61
CALC_BBLS_H2O 10
CALC_BBLS_OIL 23
CALC_GOR 1565
CALC_MCF_GAS 36
CASING_PRESS 80
MCF_GAS 107
Perforation Data:
Interval Top:7473 ft.# Of Holes:68
Interval Bottom:7492 ft.Hole Size:0.41 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 9/22/2009                 Interval Top: 7473 ft.    Interval Bottom: 7998 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/28/2003
Treatment Summary:JSND-CDL COMMINGLE. RELEASED RBP @ 7550' TO COMMINGLE THE JSND-CDL 9/17/09.
Tubing Size:2.375 in.Tubing Setting Depth:7906 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/22/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 28
BTU_GAS 1335
CALC_BBLS_H2O 6
CALC_BBLS_OIL 28
CALC_GOR 7786
CALC_MCF_GAS 218
CASING_PRESS 527
GRAVITY_OIL 52
MCF_GAS 218
TUBING_PRESS 390
Perforation Data:
Interval Top:7473 ft.# Of Holes:192
Interval Bottom:7998 ft.Hole Size:0.41 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
06/30/2022
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No