|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/11/2025 Measured TD: 8256 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/11/2025 | | Wellbore Permit | | | Permit #: | 20030228 | Expiration Date: | 2/9/2004 | | Proposed Depth/Form: | 8300 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A,232 , Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4100 ft., Bottom: 5100 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/9/2003 | | Spud Date: | 4/27/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 8256 ft. | Measured PB depth: | 8235 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL; DUAL INDUCTION; CD/CN | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 814 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 0 ft., Bottom: 814 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8252 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6586 ft., Bottom: 8256 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5345 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 3668 ft., Bottom: 5350 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5345 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 3784 ft., Bottom: 5380 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4523 ft. | | N | N | | SHANNON | 5184 ft. | | N | N | | NIOBRARA | 7254 ft. | | N | N | | FORT HAYS | 7499 ft. | | N | N | | CODELL | 7523 ft. | | N | N | | CARLILE | 7540 ft. | | N | N | | GREENHORN | 7584 ft. | | N | N | | GRANEROS | 7781 ft. | | N | N | | BENTONITE | 7781 ft. | | N | N | | MOWRY | 7936 ft. | | N | N | | J-2 SAND | 7952 ft. | | N | N | | SKULL CREEK | 8065 ft. | | N | N | | DAKOTA | 8152 ft. | | N | N | | LYTLE | 8208 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 3/26/2025 Interval Top: 8124 ft. Interval Bottom: 8166 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/9/2003 | | Treatment Summary: | DRILL OUT STAGE TOOL. PERF'D THE DAKOTA FROM 8124'-8134', 8158'-8166' W/ 4 SPF. SET PKR @ 8069' SWAB TEST. FRAC'D THE DAKOTA W/ 7,460# 100 MESH, 45,000# 20/40 FRAC SAND, 10,900# ACFRAC PR-6000 20/40 & 31,542 GALS 35# DYNAFLOW-2 FRAC FLUID. FLOW BACK WELL. UNSET PKR. LD TBG, PKR. SWAB & FLOW TEST. SET CIBP @ 8080'. MOVE UP TO J SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DKTA. |
| | Perforation Data: | | Interval Top: | 8124 ft. | # Of Holes: | 72 | | Interval Bottom: | 8166 ft. | Hole Size: | 0.38 in. |
|
Formation JSND Formation Classification: GW Status: AB - 7/11/2025 Interval Top: 7956 ft. Interval Bottom: 8015 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/9/2003 | | Treatment Summary: | DRILL OUT DV TOOL. PERF THE JA SAND FROM 7956'-8015' W/ 2 SPF. FRAC'D W/ 350,000# 20/40 FRAC SAND 117,432 GALS DYNAFLOW-5. RIH W/ PROD TBG. SWAB. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 28 | | BBLS_OIL | 4 | | CALC_BBLS_H2O | 28 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 57500 | | CALC_MCF_GAS | 230 | | CASING_PRESS | 620 | | MCF_GAS | 230 | | TUBING_PRESS | 140 |
| | Perforation Data: | | Interval Top: | 7956 ft. | # Of Holes: | 62 | | Interval Bottom: | 8015 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 3/26/2025 Interval Top: 7523 ft. Interval Bottom: 7539 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/9/2003 | | Treatment Summary: | TAG SAND PLUG @ 7750'. POOH. LD TBG. DUMP BAILED 2 SX CMT ON TOP OF SAND PLUG. POOH. PERF'D THE CODELL FROM 7523'-7539' W/4 SPF. FRAC'D W/254,463# 20/40 SAND & 112,560 GAL DYNAFLOW-2 28# CROSSLINKED GEL. FLOW BACK WELL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 11 | | BBLS_OIL | 35 | | CALC_BBLS_H2O | 11 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 3914 | | CALC_MCF_GAS | 137 | | CASING_PRESS | 160 | | MCF_GAS | 137 |
| | Perforation Data: | | Interval Top: | 7523 ft. | # Of Holes: | 64 | | Interval Bottom: | 7539 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/18/2006 Interval Top: 7300 ft. Interval Bottom: 8015 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 3/17/2006 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/15/2006 | | Treatment Summary: | DRILLED OUT CBP @ 7430' TO COMMINGLE THE JSND-NBRR-CDL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7934 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/18/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 32 | | BBLS_OIL | 21 | | CALC_BBLS_H2O | 32 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 8238 | | CALC_MCF_GAS | 173 | | CASING_PRESS | 586 | | MCF_GAS | 173 | | TUBING_PRESS | 320 |
| | Perforation Data: | | Interval Top: | 7300 ft. | # Of Holes: | 246 | | Interval Bottom: | 8015 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/11/2025 Interval Top: 7300 ft. Interval Bottom: 7539 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/1/2006 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/27/2010 | | Treatment Summary: | Refrac'd NB-CD 3/27/2010 Did not reperf.
| | Formation Treatment | | Treatment Date: | 2/27/2006 | | Treatment Summary: | FRAC'D CODELL (7523'-7539') WITH 254,463# 20/40 SAND AND 112,560 GAL DYNAFLOW-2 28# CROSSLINKED GEL. 03-01-03 SET CBP @ 7430. 02-12-06. FRAC'D THE NIOBRARA "B" (7300'-7330') WITH 177,072 GAL FRAC FLUID AND 250,720# SAND. 02-27-06. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 45 | | BBLS_OIL | 16 | | BTU_GAS | 1282 | | CALC_BBLS_H2O | 40 | | CALC_BBLS_OIL | 80 | | CALC_GOR | 3625 | | CALC_MCF_GAS | 290 | | CASING_PRESS | 650 | | GRAVITY_OIL | 67 | | MCF_GAS | 58 | | TUBING_PRESS | 358 |
| | Perforation Data: | | Interval Top: | 7300 ft. | # Of Holes: | 184 | | Interval Bottom: | 7539 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 4/3/2025 Interval Top: 7300 ft. Interval Bottom: 7330 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/1/2006 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7300 ft. | # Of Holes: | 120 | | Interval Bottom: | 7330 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/11/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2027 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|