|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 4/1/2022 Measured TD: 8160 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 4/1/2022 | | Wellbore Permit | | | Permit #: | 20084935 | Expiration Date: | 8/27/2009 | | Proposed Depth/Form: | 8160 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2NW | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 898 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: 0 ft., Bottom: 898 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8146 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 6850 ft., Bottom: 8416 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5028 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 3916 ft., Bottom: 5040 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/24/2002 | | Spud Date: | 1/3/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 8160 ft. | Measured PB depth: | 8115 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDCNGR, DIGLGR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 898 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 630, Top: 0 ft., Bottom: 898 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8145 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 6850 ft., Bottom: 8145 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5028 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 3916 ft., Bottom: 5040 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4564 ft. | | N | N | | NIOBRARA | 7174 ft. | | N | N | | FORT HAYS | 7529 ft. | | N | N | | CODELL | 7552 ft. | | N | N | | J SAND | 8004 ft. | | N | N |
Formation JSND Formation Classification: OW Status: SI - 4/1/2022 Interval Top: 8007 ft. Interval Bottom: 8037 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/6/2002 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/9/2011 | | Treatment Summary: | REMOVED SAND PLUG SET @ 7757' TO COMMINGLE WITH NB/CD. | | Formation Treatment | | Treatment Date: | 1/24/2002 | | Treatment Summary: | SAND PLUG @ 7756'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 6 | | CALC_BBLS_OIL | 6 | | CALC_GOR | 42167 | | CALC_MCF_GAS | 253 | | CASING_PRESS | 400 | | GRAVITY_OIL | 63 | | MCF_GAS | 253 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 8007 ft. | # Of Holes: | 80 | | Interval Bottom: | 8037 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 5/9/2011 Interval Top: 7550 ft. Interval Bottom: 7570 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/16/2008 | | Treatment Summary: | FRAC CODELL WITH 191418 GALS FLUID, 150000 40/70, 4000 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7550 ft. | # Of Holes: | 60 | | Interval Bottom: | 7570 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 3/16/2011 Interval Top: 7172 ft. Interval Bottom: 8037 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 2/16/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/9/2011 | | Treatment Summary: | JSND COMMINGLE WITH NB/CD |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7968 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/16/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | BTU_GAS | 1302 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 40000 | | CALC_MCF_GAS | 32 | | CASING_PRESS | 500 | | GRAVITY_OIL | 55 | | MCF_GAS | 32 | | TUBING_PRESS | 50 |
| | Perforation Data: | | Interval Top: | 7172 ft. | # Of Holes: | 218 | | Interval Bottom: | 8037 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 4/1/2022 Interval Top: 7172 ft. Interval Bottom: 7570 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/19/2008 | Choke Size: | 0.375 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/24/2002 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7540 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/2/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1241 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 34 | | CALC_GOR | 6058 | | CALC_MCF_GAS | 206 | | CASING_PRESS | 640 | | GRAVITY_OIL | 51 | | TUBING_PRESS | 290 |
| | Perforation Data: | | Interval Top: | 7172 ft. | # Of Holes: | 138 | | Interval Bottom: | 7570 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/9/2011 Interval Top: 7172 ft. Interval Bottom: 7405 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/16/2008 | | Treatment Summary: | PERFORATION INTERVALS: NIO A 7172-7178, NIO B 7320-7330, NIO C 7395-7405. 78 PERFORATIONS. FRAC NIO B AND C WITH 249792 GAL FLUID, 200250 40/70, 4000 20/40 SB EXCEL. FRAC NIO. A WITH 132613 GAL FLUID, 100000 40/70, 4000 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7172 ft. | # Of Holes: | 78 | | Interval Bottom: | 7405 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 03/31/2022 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|