|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 6/19/2025 Measured TD: 7888 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 6/19/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 8/24/2012 | | Proposed Depth/Form: | 7888 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 764 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 764 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7873 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 285, Top: 6360 ft., Bottom: 7873 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/18/2002 | | Spud Date: | 12/1/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 7888 ft. | Measured PB depth: | 7858 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | CDCNGR, DIGLGR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 764 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 764 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7873 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 285, Top: 6360 ft., Bottom: 7873 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHANNON | | | N | N | | SUSSEX | 4350 ft. | | N | N | | NIOBRARA | 6996 ft. | | N | N | | FORT HAYS | 7263 ft. | | N | N | | CODELL | 7287 ft. | | N | N | | J SAND | 7716 ft. | | N | N | | TODILTO | 7888 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 6/19/2025 Interval Top: 7732 ft. Interval Bottom: 7790 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/30/2002 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/18/2011 | | Treatment Summary: | Set plug at 7780' with sand fill to 7530'
TA for NB/CD recomplete | | Formation Treatment | | Treatment Date: | 12/18/2002 | | Treatment Summary: | FRAC J SAND WITH 115100# 20/40 MESH; 104266 GAL. SAND LADEN FLUID. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 5 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 83400 | | CALC_MCF_GAS | 417 | | CASING_PRESS | 610 | | GRAVITY_OIL | 60 | | MCF_GAS | 417 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 7732 ft. | # Of Holes: | 96 | | Interval Bottom: | 7790 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/19/2025 Interval Top: 7008 ft. Interval Bottom: 7306 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/14/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/9/2011 | | Treatment Summary: | NB Perf: 7008-7148 Holes: 48 Size: .42
Frac NB w/ 250 gal 15% HCl & 170,228 gal pHaser Hybrid w/ 250,820# 20/40 sand, 4,000# SB Excel sand
CD Perf: 7286-7306 Holes: 60 Size .38
Frac CD w/ 132,384 gal pHaser w/ 221,000# 20/40 sand 4,000# SB Excel sand
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/24/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 4 | | BTU_GAS | 1272 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 48750 | | CALC_MCF_GAS | 195 | | CASING_PRESS | 642 | | GRAVITY_OIL | 52 | | MCF_GAS | 195 | | TUBING_PRESS | 586 |
| | Perforation Data: | | Interval Top: | 7008 ft. | # Of Holes: | 48 | | Interval Bottom: | 7306 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/19/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|