|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 11/7/2025 Measured TD: 7123 ft. Vertical TD: 7069 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 11/7/2025 | | Wellbore Permit | | | Permit #: | 012162 | Expiration Date: | 12/13/2002 | | Proposed Depth/Form: | 7115 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 |
| | |
| Wellbore Completed | | Completion Date: | 2/5/2002 | | Spud Date: | 12/18/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 7123 ft. | Measured PB depth: | 7073 ft. | | True Vertical TD: | 7069 ft. | True Vertical PB depth: | 7019 ft. | | Top PZ Location: | Sec:33 Twp: 5N 67W | Footage: 469 FSL 573 FEL | | Bottom Hole Location: | Sec:33 Twp: 5N 67W | Footage: 4969 FSL 573 FEL | | Log Types: | PEAILC, PECNLD, CBL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 674 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 674 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7112 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 5880 ft., Bottom: 7112 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 4400 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 3800 ft., Bottom: 4418 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 2000 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 858 ft., Bottom: 2020 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 3906 ft. | | N | N | | SHANNON | 4361 ft. | | N | N | | NIOBRARA | 6606 ft. | | N | N | | FORT HAYS | 6918 ft. | | N | N | | CODELL | 6940 ft. | | N | N |
Formation NB-CD Formation Classification: GW Status: AB - 11/7/2025 Interval Top: 6611 ft. Interval Bottom: 6963 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/27/2010 | Choke Size: | 1.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/25/2010 | | Treatment Summary: | NB PERF 6611-6812, HOLES 68, SIZE 0.42. CD PERF 6941-6963, HOLES 76, SIZE 0.38. NB TREATED WITH 244243 GAL SW WITH 201020# 40/70 & 4340# 20/40 SB EXCEL. CD TREATED WITH 201054 GAL SW WITH 150080# 40/70 & 4040# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/4/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 31 | | BTU_GAS | 1345 | | CALC_BBLS_OIL | 31 | | CALC_GOR | 4129 | | CALC_MCF_GAS | 128 | | CASING_PRESS | 350 | | GRAVITY_OIL | 45 | | MCF_GAS | 86 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 6611 ft. | # Of Holes: | 144 | | Interval Bottom: | 6963 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/07/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|