Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20666
Well Classification: GW Status: PA - 6/27/2022
Well Name/No:RADEMACHER #14-25A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/27/2022
FacilityID:261944LocationID:336260
Municipality/County:FIRESTONE / WELD #123Location:SESW 25 3N68W 6
Field:WATTENBERG - #90750Elevation:4885 ft.
Planned Location:470FSL  2170 FWLLat/Long: 40.191158 / -104.952869Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.191160 / -104.952870Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 6/27/2022             Measured TD: 7815 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 6/27/2022
Wellbore Permit
Permit #: Expiration Date:12/3/2013
Proposed Depth/Form:7815 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 80, Drill Unit: S/2SW4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: S/2SW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 630 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 465, Top: 0 ft., Bottom: 630 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7783 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 260, Top: 6700 ft., Bottom: 7783 ft.

Wellbore Completed
Completion Date:12/21/2001
Spud Date:12/21/2001Spud Date Is:ACTUAL
Measured TD:7815 ft.Measured PB depth:7750 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:PEAILC, PECNTLD, PEMLGR, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 630 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 465, Top: 0 ft., Bottom: 630 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7783 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 6450 ft., Bottom: 7783 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4124 ft.NN
SHANNON4622 ft.NN
NIOBRARA6944 ft.NN
FORT HAYS7196 ft.NN
CODELL7219 ft.NN
J SAND7650 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 6/27/2022                 Interval Top: 7662 ft.    Interval Bottom: 7688 ft.

 Completed Information for Formation J SAND
1st Production Date:1/25/2002Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/8/2013Treatment End Date:N/A
Treatment Summary:MILLED OUT CIBP TO COMMINGLE JSND PRODUCTION WITH GRNHN PRODUCTION.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:12/21/2001
Treatment Summary:SET CIBP @ 7610 & SET 2 SKS OF CEMENT FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CIBP AND CEMENT TO COMMINGLE WELL WITHIN THE NEXT SIX MONTHS.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 5
CALC_BBLS_OIL 5
CALC_GOR 105800
CALC_MCF_GAS 529
CASING_PRESS 550
GRAVITY_OIL 60
MCF_GAS 529
TUBING_PRESS 375
Perforation Data:
Interval Top:7662 ft.# Of Holes:78
Interval Bottom:7688 ft.Hole Size:3.13 in.

Formation GRNHN                   Formation Classification:  GW                   Status:  AB - 6/27/2022                 Interval Top: 7407 ft.    Interval Bottom: 7479 ft.

 Completed Information for Formation GREENHORN
1st Production Date:1/28/2010Choke Size:0.406 in.
Formation Name:GREENHORNCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/28/2009
Treatment Summary:319392 GAL SW WITH 150680# 40/70 & 50260# 100 OTTAWA & 8000# 20/40 SB EXCEL.
Tubing Size:2.375 in.Tubing Setting Depth:7367 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/9/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1314
CALC_BBLS_OIL 10
CALC_GOR 2400
CALC_MCF_GAS 24
CASING_PRESS 1004
GRAVITY_OIL 43
TUBING_PRESS 833
Perforation Data:
Interval Top:7407 ft.# Of Holes:42
Interval Bottom:7479 ft.Hole Size:0.38 in.

Formation J-GRH                   Formation Classification:  GW                   Status:  CM - 1/30/2013                 Interval Top: 7407 ft.    Interval Bottom: 7688 ft.

 Completed Information for Formation J & GREENHORN
1st Production Date:1/22/2013Choke Size: 
Formation Name:J & GREENHORNCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/30/2013Treatment End Date:N/A
Treatment Summary:MILLED OUT CIBP TO COMMINGLE JSND PRODUCTION WITH GRNHN PRODUCTION.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7624 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/30/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 4
BTU_GAS 1181
CALC_BBLS_OIL 4
CALC_GOR 4750
CALC_MCF_GAS 19
CASING_PRESS 826
GRAVITY_OIL 49
MCF_GAS 19
TUBING_PRESS 755
Perforation Data:
Interval Top:7407 ft.# Of Holes:120
Interval Bottom:7688 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/27/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No