Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20640
Well Classification: GW Status: PA - 1/7/2025
Well Name/No:SPRAGUE #31-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/7/2025
FacilityID:261754LocationID:336403
County:WELD #123Location:NWNE 9 2N67W 6
Field:WATTENBERG - #90750Elevation:4937 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1038FNL  1605 FELLat/Long: 40.157045 / -104.891731Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.157120 / -104.891595Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 1/7/2025             Measured TD: 8234 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 1/7/2025
Wellbore PermitDIRECTIONAL
Permit #:20080353 Expiration Date:4/10/2009
Proposed Top PZ Location:Sec: Twp: Footage: 603 FNL  2014 FEL
Bottom Hole Location:Sec:9 Twp: 2N 67W Footage: 465 FNL  2142 FEL
Proposed Depth/Form:8234 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2,NE
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318.A/232 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: W2,NE
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 510 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 206, Top: 0 ft., Bottom: 510 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8234 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 225, Top: 6938 ft., Bottom: 8234 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5200 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4200 ft., Bottom: 5200 ft.

Wellbore Completed
Completion Date:4/3/2002
Spud Date:1/31/2002Spud Date Is:ACTUAL
Measured TD:8234 ft.Measured PB depth:8220 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 603 FNL  2014 FEL
Bottom Hole Location:Sec:9 Twp: 2N 67WFootage: 465 FNL  2142 FEL
Log Types:RST, CBL ( NO OPEN HOLE )
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 510 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 206, Top: 0 ft., Bottom: 513 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8234 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 6938 ft., Bottom: 8234 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5109 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 3652 ft., Bottom: 5109 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4365 ft.NN
SHANNON4925 ft.NN
NIOBRARA7345 ft.NN
FORT HAYS7593 ft.NN
CODELL7616 ft.NN
CARLILE7632 ft.NN
GREENHORN7656 ft.NN
GRANEROS7883 ft.NN
BENTONITE7883 ft.NN
MOWRY8037 ft.NN
J-2 SAND8054 ft.NN
SKULL CREEK8153 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 1/7/2025                  Interval Top: 8054 ft.    Interval Bottom: 8104 ft.

 Completed Information for Formation J SAND
1st Production Date:4/5/2002Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/2002
Treatment Summary:DRILL OUT CMT. PERF J SAND FROM 8054-8070'&8076-8104' W/4 SPF. SET PKR@8001'. SWAB & RECORD. REMOVE PKR. FRAC W/332,500# 20/40 SAND IN 123,186 GALS DYNAFLOW-2. FLOW BACK. RUN PROD. TBG. SWAB
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 5
CALC_BBLS_H2O 18
CALC_BBLS_OIL 5
CALC_GOR 78491
CALC_MCF_GAS 416
CASING_PRESS 420
MCF_GAS 416
TUBING_PRESS 200
Perforation Data:
Interval Top:8054 ft.# Of Holes:176
Interval Bottom:8104 ft.Hole Size:0.375 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/23/2024                Interval Top: 7616 ft.    Interval Bottom: 7637 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7616 ft.# Of Holes:40
Interval Bottom:7637 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 2/14/2009                 Interval Top: 7392 ft.    Interval Bottom: 8104 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/2002
Treatment Summary:JSND/NB/CD COMMINGLE; RELEASED RBP@7510 2/5/09 RELEASED RBP@ 7710 TO COMMINGLE THE JSND/NB/CD 2/9/09
Tubing Size:2.375 in.Tubing Setting Depth:8046 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/14/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 45
BTU_GAS 1166
CALC_BBLS_H2O 15
CALC_BBLS_OIL 45
CALC_GOR 2889
CALC_MCF_GAS 130
CASING_PRESS 946
GRAVITY_OIL 50
MCF_GAS 130
TUBING_PRESS 288
Perforation Data:
Interval Top:7392 ft.# Of Holes:296
Interval Bottom:8104 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 1/7/2025                  Interval Top: 7392 ft.    Interval Bottom: 7637 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/14/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/14/2009
Treatment Summary:NB/CD RECOMP; SET CBP@6785, DRILLED OUT CBP @ 6765 SET RBP@ 7710, 1/7/09; FRAC'D CD W/109998 GAL 24# VISTAR HYBRID X- LINKED GEL CONTANING 250640# SAND 1/14/09; SET RBP@7510; 1/14/09. FRAC'D NB W/154,056 GAL 18# VISTAR HYBRID X- LINK GEL W/250,560# SND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7392 ft.# Of Holes:120
Interval Bottom:7637 ft.Hole Size:0.4166667 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/23/2024                Interval Top: 7392 ft.    Interval Bottom: 7412 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7392 ft.# Of Holes:80
Interval Bottom:7412 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/07/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No