|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 1/7/2025 Measured TD: 8234 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 1/7/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20080353 | Expiration Date: | 4/10/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 603 FNL 2014 FEL | | Bottom Hole Location: | Sec:9 Twp: 2N 67W | Footage: 465 FNL 2142 FEL | | Proposed Depth/Form: | 8234 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2,NE | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318.A/232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: W2,NE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 510 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 206, Top: 0 ft., Bottom: 510 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8234 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 225, Top: 6938 ft., Bottom: 8234 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5200 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4200 ft., Bottom: 5200 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/3/2002 | | Spud Date: | 1/31/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 8234 ft. | Measured PB depth: | 8220 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 603 FNL 2014 FEL | | Bottom Hole Location: | Sec:9 Twp: 2N 67W | Footage: 465 FNL 2142 FEL | | Log Types: | RST, CBL ( NO OPEN HOLE ) | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 510 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 206, Top: 0 ft., Bottom: 513 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8234 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 6938 ft., Bottom: 8234 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5109 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 3652 ft., Bottom: 5109 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4365 ft. | | N | N | | SHANNON | 4925 ft. | | N | N | | NIOBRARA | 7345 ft. | | N | N | | FORT HAYS | 7593 ft. | | N | N | | CODELL | 7616 ft. | | N | N | | CARLILE | 7632 ft. | | N | N | | GREENHORN | 7656 ft. | | N | N | | GRANEROS | 7883 ft. | | N | N | | BENTONITE | 7883 ft. | | N | N | | MOWRY | 8037 ft. | | N | N | | J-2 SAND | 8054 ft. | | N | N | | SKULL CREEK | 8153 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/7/2025 Interval Top: 8054 ft. Interval Bottom: 8104 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/5/2002 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/3/2002 | | Treatment Summary: | DRILL OUT CMT. PERF J SAND FROM 8054-8070'&8076-8104' W/4 SPF. SET PKR@8001'. SWAB & RECORD. REMOVE PKR. FRAC W/332,500# 20/40 SAND IN 123,186 GALS DYNAFLOW-2. FLOW BACK. RUN PROD. TBG. SWAB |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 18 | | BBLS_OIL | 5 | | CALC_BBLS_H2O | 18 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 78491 | | CALC_MCF_GAS | 416 | | CASING_PRESS | 420 | | MCF_GAS | 416 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 8054 ft. | # Of Holes: | 176 | | Interval Bottom: | 8104 ft. | Hole Size: | 0.375 in. |
|
Formation CODL Formation Classification: GW Status: CM - 10/23/2024 Interval Top: 7616 ft. Interval Bottom: 7637 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7616 ft. | # Of Holes: | 40 | | Interval Bottom: | 7637 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/14/2009 Interval Top: 7392 ft. Interval Bottom: 8104 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/3/2002 | | Treatment Summary: | JSND/NB/CD COMMINGLE; RELEASED RBP@7510 2/5/09 RELEASED RBP@ 7710 TO COMMINGLE THE JSND/NB/CD 2/9/09 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8046 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/14/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 45 | | BTU_GAS | 1166 | | CALC_BBLS_H2O | 15 | | CALC_BBLS_OIL | 45 | | CALC_GOR | 2889 | | CALC_MCF_GAS | 130 | | CASING_PRESS | 946 | | GRAVITY_OIL | 50 | | MCF_GAS | 130 | | TUBING_PRESS | 288 |
| | Perforation Data: | | Interval Top: | 7392 ft. | # Of Holes: | 296 | | Interval Bottom: | 8104 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/7/2025 Interval Top: 7392 ft. Interval Bottom: 7637 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/14/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/14/2009 | | Treatment Summary: | NB/CD RECOMP; SET CBP@6785, DRILLED OUT CBP @ 6765 SET RBP@ 7710, 1/7/09; FRAC'D CD W/109998 GAL 24# VISTAR HYBRID X- LINKED GEL CONTANING 250640# SAND 1/14/09; SET RBP@7510; 1/14/09. FRAC'D NB W/154,056 GAL 18# VISTAR HYBRID X- LINK GEL W/250,560# SND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7392 ft. | # Of Holes: | 120 | | Interval Bottom: | 7637 ft. | Hole Size: | 0.4166667 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/23/2024 Interval Top: 7392 ft. Interval Bottom: 7412 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7392 ft. | # Of Holes: | 80 | | Interval Bottom: | 7412 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/07/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|