|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/27/2018 Measured TD: 8035 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/27/2018 | | Wellbore Permit | DRIFTED | | Permit #: | 20021826 | Expiration Date: | 10/10/2003 | | Proposed Depth/Form: | 8035 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 407-66, Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318.A/232 , Unit Acreage: 333, Drill Unit: S/2 | | Formation And Spacing: | Code: SNSD , Formation: SHANNON , Order: 250 , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 700 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8100 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 6900 ft., Bottom: 8100 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4000 ft., Bottom: 5100 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/14/2002 | | Spud Date: | 12/14/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 8035 ft. | Measured PB depth: | 7982 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 720 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 302, Top: 0 ft., Bottom: 720 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8030 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 252, Top: 6545 ft., Bottom: 8030 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5233 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 215, Top: 4200 ft., Bottom: 5238 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5233 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 215, Top: 4182 ft., Bottom: 5238 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4335 ft. | | N | N | | SHANNON | 4883 ft. | | N | N | | NIOBRARA | 7242 ft. | | N | N | | FORT HAYS | 7456 ft. | | N | N | | CODELL | 7478 ft. | | N | N | | CARLILE | 7500 ft. | | N | N | | GREENHORN | 7519 ft. | | N | N | | GRANEROS | 7726 ft. | | N | N | | BENTONITE | 7726 ft. | | N | N | | MOWRY | 7876 ft. | | N | N | | J-2 SAND | 7892 ft. | | N | N | | SKULL CREEK | 7998 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 8/27/2018 Interval Top: 7894 ft. Interval Bottom: 7950 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/14/2002 | | Treatment Summary: | DRILL OUT STAGE TOOL. PERF J SAND FROM 7914'-7950' AND 7894'-7908' W/4 SPF. FRAC J W/ 550,000# 20/40 SAND IN 238,560 GALS DYNAFLOW-2. FLOW BACK FRAC. LAND PROD TBG. SWAB BACK. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7885 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/23/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 3 | | CALC_BBLS_H2O | 15 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 235069 | | CALC_MCF_GAS | 682 | | CASING_PRESS | 790 | | MCF_GAS | 682 | | TUBING_PRESS | 650 |
| | Perforation Data: | | Interval Top: | 7894 ft. | # Of Holes: | 200 | | Interval Bottom: | 7950 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 11/15/2002 Interval Top: 7483 ft. Interval Bottom: 7493 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | 0.156 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/14/2002 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/15/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 23 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 23 | | CALC_GOR | 1565 | | CALC_MCF_GAS | 36 | | MCF_GAS | 36 | | TUBING_PRESS | 190 |
| | Perforation Data: | | Interval Top: | 7483 ft. | # Of Holes: | 20 | | Interval Bottom: | 7493 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 12/11/2002 Interval Top: 7483 ft. Interval Bottom: 7950 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.438 in. | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/14/2002 | | Treatment Summary: | RELEASE RBP. RIH W/PROD TBG |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7870 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/11/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 28 | | BBLS_OIL | 50 | | CALC_BBLS_H2O | 28 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 5760 | | CALC_MCF_GAS | 288 | | CASING_PRESS | 840 | | MCF_GAS | 288 | | TUBING_PRESS | 600 |
| | Perforation Data: | | Interval Top: | 7483 ft. | # Of Holes: | 220 | | Interval Bottom: | 7950 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/26/2008 Interval Top: 7300 ft. Interval Bottom: 7950 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/14/2002 | | Treatment Summary: | DRILLED OUT CFP @7410'. DRILLED OUT CBP @7600' TO COMMINGLE THE JSND-NBRR-CODL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7881 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/26/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 23 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 23 | | CALC_GOR | 6957 | | CALC_MCF_GAS | 160 | | CASING_PRESS | 887 | | MCF_GAS | 160 | | TUBING_PRESS | 469 |
| | Perforation Data: | | Interval Top: | 7300 ft. | # Of Holes: | 308 | | Interval Bottom: | 7950 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/27/2018 Interval Top: 7300 ft. Interval Bottom: 7500 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/26/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/14/2008 | | Treatment Summary: | NB-CD REFRAC & RECMPLTN: SET CBP @7600'. REFRACD CODL W/110,502 GAL FRAC GEL FLUID & 253,820# SND. SET CFP @7410'. FRC'D NBRR W/162,078 GAL FRAC FLUID & 253,620# SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7300 ft. | # Of Holes: | 108 | | Interval Bottom: | 7500 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/27/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|