Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20625
Well Classification: GW Status: PA - 7/23/2025
Well Name/No:EDITH ANN #44-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/23/2025
FacilityID:261634LocationID:333173
County:WELD #123Location:SESE 21 2N68W 6
Field:WATTENBERG - #90750Elevation:4930 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:550FSL  600 FELLat/Long: 40.118437 / -105.000996Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.118387 / -105.000913Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 7/23/2025             Measured TD: 8129 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 7/23/2025
Wellbore Permit
Permit #:20022183 Expiration Date:12/2/2003
Proposed Depth/Form:8129 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: SE/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318.A/232 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 360, Top: 4100 ft., Bottom: 5100 ft.

Wellbore Completed
Completion Date:6/21/2002
Spud Date:5/29/2002Spud Date Is:ACTUAL
Measured TD:8129 ft.Measured PB depth:8095 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND. CD/CN, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 587 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 0 ft., Bottom: 587 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8129 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6536 ft., Bottom: 8129 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5095 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 3635 ft., Bottom: 5095 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5095 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 3660 ft., Bottom: 5190 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4274 ft.NN
SHANNON4863 ft.NN
NIOBRARA7263 ft.NN
FORT HAYS7531 ft.NN
CODELL7551 ft.NN
CARLILE7574 ft.NN
GREENHORN7606 ft.NN
GRANEROS7810 ft.NN
BENTONITE7810 ft.NN
MOWRY7966 ft.NN
J-2 SAND7985 ft.NN
SKULL CREEK8076 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 7/23/2025                 Interval Top: 7996 ft.    Interval Bottom: 8028 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/21/2002
Treatment Summary:DRILL OUT CMT. PERF THE J SAND FROM 7996'-8028' W/2 SPF. FRAC W/435,558# OF 20/40 SAND AND 158,800 GALS OF DYNAFLOW-2 FLOW BACK WELL. RUN PROD TBG. SWAB.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 44
BBLS_OIL 5
CALC_BBLS_H2O 44
CALC_BBLS_OIL 5
CALC_GOR 175800
CALC_MCF_GAS 879
CASING_PRESS 1140
MCF_GAS 879
TUBING_PRESS 930
Perforation Data:
Interval Top:7996 ft.# Of Holes:64
Interval Bottom:8028 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  AB - 7/23/2025                 Interval Top: 7550 ft.    Interval Bottom: 7571 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size:0.406 in.
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/21/2002
Treatment Summary:SET RBP @ 7650'. DUMP 2 SXS (100#) 20-40 SAND ON RBP. PERF THE CODELL FROM 7550'-7571' W/4 SPF. FRAC'D W/120,456 GAL DYNAFLOW-2 CROSSLINKED GEL CONTAINING 300,000# 20/40 SAND. FLOW BACK WELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/14/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 94
CALC_BBLS_H2O 25
CALC_BBLS_OIL 94
CALC_GOR 202
CALC_MCF_GAS 19
CASING_PRESS 160
MCF_GAS 19
Perforation Data:
Interval Top:7550 ft.# Of Holes:84
Interval Bottom:7571 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 4/14/2003                 Interval Top: 7550 ft.    Interval Bottom: 8028 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/21/2002
Treatment Summary:REL RBP. POOH W/TBG. LD RBP. RIHW NC, JTS, TBG. LAND TBG. SWAB
Tubing Size:2.375 in.Tubing Setting Depth:7985 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/14/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 30
CALC_BBLS_H2O 25
CALC_BBLS_OIL 30
CALC_GOR 4533
CALC_MCF_GAS 136
MCF_GAS 136
Perforation Data:
Interval Top:7550 ft.# Of Holes:148
Interval Bottom:8028 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/23/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)274
GOR
GOR DeterminationMCFE
Average BOE per Day0.135
Average MCFE per Day0.770

 Federal Financial Assurance  i 

 Tribal Well  i No