|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/23/2025 Measured TD: 8129 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/23/2025 | | Wellbore Permit | | | Permit #: | 20022183 | Expiration Date: | 12/2/2003 | | Proposed Depth/Form: | 8129 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: SE/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318.A/232 , Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 360, Top: 4100 ft., Bottom: 5100 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/21/2002 | | Spud Date: | 5/29/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 8129 ft. | Measured PB depth: | 8095 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DUAL IND. CD/CN, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 587 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 0 ft., Bottom: 587 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8129 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6536 ft., Bottom: 8129 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5095 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 3635 ft., Bottom: 5095 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5095 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 3660 ft., Bottom: 5190 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4274 ft. | | N | N | | SHANNON | 4863 ft. | | N | N | | NIOBRARA | 7263 ft. | | N | N | | FORT HAYS | 7531 ft. | | N | N | | CODELL | 7551 ft. | | N | N | | CARLILE | 7574 ft. | | N | N | | GREENHORN | 7606 ft. | | N | N | | GRANEROS | 7810 ft. | | N | N | | BENTONITE | 7810 ft. | | N | N | | MOWRY | 7966 ft. | | N | N | | J-2 SAND | 7985 ft. | | N | N | | SKULL CREEK | 8076 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 7/23/2025 Interval Top: 7996 ft. Interval Bottom: 8028 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/21/2002 | | Treatment Summary: | DRILL OUT CMT. PERF THE J SAND FROM 7996'-8028' W/2 SPF. FRAC W/435,558# OF 20/40 SAND AND 158,800 GALS OF DYNAFLOW-2 FLOW BACK WELL. RUN PROD TBG. SWAB. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 44 | | BBLS_OIL | 5 | | CALC_BBLS_H2O | 44 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 175800 | | CALC_MCF_GAS | 879 | | CASING_PRESS | 1140 | | MCF_GAS | 879 | | TUBING_PRESS | 930 |
| | Perforation Data: | | Interval Top: | 7996 ft. | # Of Holes: | 64 | | Interval Bottom: | 8028 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 7/23/2025 Interval Top: 7550 ft. Interval Bottom: 7571 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | 0.406 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/21/2002 | | Treatment Summary: | SET RBP @ 7650'. DUMP 2 SXS (100#) 20-40 SAND ON RBP. PERF THE CODELL FROM 7550'-7571' W/4 SPF. FRAC'D W/120,456 GAL DYNAFLOW-2 CROSSLINKED GEL CONTAINING 300,000# 20/40 SAND. FLOW BACK WELL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/14/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BBLS_OIL | 94 | | CALC_BBLS_H2O | 25 | | CALC_BBLS_OIL | 94 | | CALC_GOR | 202 | | CALC_MCF_GAS | 19 | | CASING_PRESS | 160 | | MCF_GAS | 19 |
| | Perforation Data: | | Interval Top: | 7550 ft. | # Of Holes: | 84 | | Interval Bottom: | 7571 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 4/14/2003 Interval Top: 7550 ft. Interval Bottom: 8028 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/21/2002 | | Treatment Summary: | REL RBP. POOH W/TBG. LD RBP. RIHW NC, JTS, TBG. LAND TBG. SWAB |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7985 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/14/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BBLS_OIL | 30 | | CALC_BBLS_H2O | 25 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 4533 | | CALC_MCF_GAS | 136 | | MCF_GAS | 136 |
| | Perforation Data: | | Interval Top: | 7550 ft. | # Of Holes: | 148 | | Interval Bottom: | 8028 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/23/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 274 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.135 |
| Average MCFE per Day | 0.770 |
| Federal Financial Assurance | i | |
|
|