|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 12/1/2023 Measured TD: 7920 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 12/1/2023 | | Wellbore Permit | | | Permit #: | 20072934 | Expiration Date: | 7/17/2008 | | Proposed Depth/Form: | 7920 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407, 407-6, Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232,318S , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 326, Top: 0 ft., Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7917 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 640, Top: 6600 ft., Bottom: 7917 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4800 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 215, Top: 4000 ft., Bottom: 4800 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/23/2003 | | Spud Date: | 10/14/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 7920 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, MICRO LOG, AI, COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 326, Top: 0 ft., Bottom: 900 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7917 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 390, Top: 6600 ft., Bottom: 7917 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5490 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 4040 ft., Bottom: 5490 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4588 ft. | | N | N | | NIOBRARA | 6854 ft. | | N | N | | FORT HAYS | 7117 ft. | | N | N | | CODELL | 7140 ft. | | N | N | | CARLILE | 7157 ft. | | N | N | | GREENHORN | 7190 ft. | | N | N | | BENTONITE | 7425 ft. | | N | N | | MOWRY | 7574 ft. | | N | N | | J-2 SAND | 7590 ft. | | N | N | | SKULL CREEK | 7716 ft. | | N | N | | DAKOTA | 7800 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 12/1/2023 Interval Top: 7592 ft. Interval Bottom: 7656 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/23/2003 | | Treatment Summary: | PERF'D THE J SAND FROM 7592'-7604',7607'-7610', 7622'-7638',7654'-7656' W/4 SPF. FRAC'D W/ 188,000 GALS SLICKWATER AND 163,000# 20/40 FRAC SAND. FLOW BACK WELL. RIH W/HYDROSTATIC BAILER AND TBG. TAG SAND@7750'. POOH. DUMP SAND. RIGH W/PROD TBG. LAND EOT @ |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7584 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 30 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 133 | | CASING_PRESS | 600 | | MCF_GAS | 133 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 7592 ft. | # Of Holes: | 132 | | Interval Bottom: | 7656 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/01/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|