Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20607
Well Classification: GW Status: PR - 4/9/2014
Well Name/No:DOWDY #31-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/9/2014
FacilityID:261458LocationID:331390
County:WELD #123Location:NWNE 10 2N65W 6
Field:WATTENBERG - #90750Elevation:4854 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:740FNL  1900 FELLat/Long: 40.158548 / -104.647366Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.158548 / -104.647366Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/13/2011
End Date: 10/13/2011
Reported: 2/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 126
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/9/2014             Measured TD: 7919 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/9/2014
Wellbore Permit
Permit #: Expiration Date:10/11/2013
Proposed Depth/Form:7919 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232, 318A , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 906 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 327, Top: 0 ft., Bottom: 906 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7918 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 850, Top: 4166 ft., Bottom: 7918 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4800 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4000 ft., Bottom: 4800 ft.

Wellbore Completed
Completion Date:8/6/2003
Spud Date:7/24/2003Spud Date Is:ACTUAL
Measured TD:7919 ft.Measured PB depth:7870 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, COMPENSATED NUETRON, ARRAY INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 906 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 327, Top: 0 ft., Bottom: 906 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7918 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 6650 ft., Bottom: 7918 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 4166 ft., Bottom: 6650 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4313 ft.NN
NIOBRARA6852 ft.NN
FORT HAYS7108 ft.NN
CODELL7142 ft.NN
CARLILE7158 ft.NN
GREENHORN7192 ft.NN
MOWRY7580 ft.NN
J-2 SAND7595 ft.NN
SKULL CREEK7719 ft.NN
DAKOTA7804 ft.NN

Formation DKTA                     Formation Classification:  GW                     Status:  AB - 8/19/2003                 Interval Top: 7808 ft.    Interval Bottom: 7825 ft.

 Completed Information for Formation DAKOTA
1st Production Date:N/AChoke Size: 
Formation Name:DAKOTACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/6/2003
Treatment Summary:SEE OGCC COMMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation DKTA.
Perforation Data:
Interval Top:7808 ft.# Of Holes:68
Interval Bottom:7825 ft.Hole Size:

Formation JSND                     Formation Classification:  GW                     Status:  PR - 4/9/2014                  Interval Top: 7598 ft.    Interval Bottom: 7660 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:5/12/2014Treatment End Date:N/A
Treatment Summary:3/6/2014 – 3/7/2014: TOH w/223 jts 2-3/8” tbg. RIH; tag sand; clean out sand 22’ to CIBP @ 7200’. Drill out CIBP. Swivel in to 7667'. Land tubing @ 7578 at top of J Sand. Turn over to production.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/13/2011
Treatment Summary:CIBP SET AT 7200' 10/31/2011. THE J-SAND IS TA IN ORDER TO TEST THE NBRR/CD.
Formation Treatment
Treatment Date:8/6/2003
Treatment Summary:SEE OGCC COMMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 32
BBLS_OIL 3
CALC_BBLS_H2O 32
CALC_BBLS_OIL 3
CALC_GOR 18000
CALC_MCF_GAS 54
CASING_PRESS 690
MCF_GAS 54
TUBING_PRESS 140
Perforation Data:
Interval Top:7598 ft.# Of Holes:120
Interval Bottom:7660 ft.Hole Size:2.375 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 10/20/2011                Interval Top: 6896 ft.    Interval Bottom: 7157 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/13/2011
Treatment Summary:NIOBRARA PERFS - 6896-6928' 4 SPF, 128 HOLES. FRAC’D W/135,240 GALS FRAC FLUID AND 249,750 # SAND (10/13/2011). CODELL PERFS – 7142’-7157’, 2 SPF, 30 HOLES. FRAC'D W/118,085 GALS FLUID AND 249,750# FRAC SAND (10/13/2011). CIBP SET AT 7200’ 10/13/2011. CFP SET @ 6990’ ON 10/13/2011, DRILLED OUT 01/13/2012.
Tubing Size:2.375 in.Tubing Setting Depth:7134 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/20/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 78
BBLS_OIL 101
BTU_GAS 1
CALC_BBLS_H2O 78
CALC_BBLS_OIL 101
CALC_MCF_GAS 329
CASING_PRESS 1202
GRAVITY_OIL 50
MCF_GAS 329
Perforation Data:
Interval Top:6896 ft.# Of Holes:158
Interval Bottom:7157 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)304
Total Gas Produced (MCF)10255
GOR33733
GOR DeterminationMCFE
Average BOE per Day5.614
Average MCFE per Day32.551

 Federal Financial Assurance  i 

 Tribal Well  i No