|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/9/2014 Measured TD: 7919 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/9/2014 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 10/11/2013 | | Proposed Depth/Form: | 7919 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232, 318A , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 906 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 327, Top: 0 ft., Bottom: 906 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7918 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 850, Top: 4166 ft., Bottom: 7918 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4800 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4000 ft., Bottom: 4800 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/6/2003 | | Spud Date: | 7/24/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 7919 ft. | Measured PB depth: | 7870 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, COMPENSATED NUETRON, ARRAY INDUCTION | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 906 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 327, Top: 0 ft., Bottom: 906 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7918 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 850, Top: 6650 ft., Bottom: 7918 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 4166 ft., Bottom: 6650 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4313 ft. | | N | N | | NIOBRARA | 6852 ft. | | N | N | | FORT HAYS | 7108 ft. | | N | N | | CODELL | 7142 ft. | | N | N | | CARLILE | 7158 ft. | | N | N | | GREENHORN | 7192 ft. | | N | N | | MOWRY | 7580 ft. | | N | N | | J-2 SAND | 7595 ft. | | N | N | | SKULL CREEK | 7719 ft. | | N | N | | DAKOTA | 7804 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 8/19/2003 Interval Top: 7808 ft. Interval Bottom: 7825 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/6/2003 | | Treatment Summary: | SEE OGCC COMMENTS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DKTA. |
| | Perforation Data: | | Interval Top: | 7808 ft. | # Of Holes: | 68 | | Interval Bottom: | 7825 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: PR - 4/9/2014 Interval Top: 7598 ft. Interval Bottom: 7660 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/12/2014 | Treatment End Date: | N/A | | Treatment Summary: | 3/6/2014 – 3/7/2014: TOH w/223 jts 2-3/8” tbg. RIH; tag sand; clean out sand 22’ to CIBP @ 7200’. Drill out CIBP. Swivel in to 7667'. Land tubing @ 7578 at top of J Sand. Turn over to production. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 10/13/2011 | | Treatment Summary: | CIBP SET AT 7200' 10/31/2011. THE J-SAND IS TA IN ORDER TO TEST THE NBRR/CD. | | Formation Treatment | | Treatment Date: | 8/6/2003 | | Treatment Summary: | SEE OGCC COMMENTS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 32 | | BBLS_OIL | 3 | | CALC_BBLS_H2O | 32 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 18000 | | CALC_MCF_GAS | 54 | | CASING_PRESS | 690 | | MCF_GAS | 54 | | TUBING_PRESS | 140 |
| | Perforation Data: | | Interval Top: | 7598 ft. | # Of Holes: | 120 | | Interval Bottom: | 7660 ft. | Hole Size: | 2.375 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 10/20/2011 Interval Top: 6896 ft. Interval Bottom: 7157 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/13/2011 | | Treatment Summary: | NIOBRARA PERFS - 6896-6928' 4 SPF, 128 HOLES. FRAC’D W/135,240 GALS FRAC FLUID AND 249,750 # SAND (10/13/2011). CODELL PERFS – 7142’-7157’, 2 SPF, 30 HOLES. FRAC'D W/118,085 GALS FLUID AND 249,750# FRAC SAND (10/13/2011). CIBP SET AT 7200’ 10/13/2011. CFP SET @ 6990’ ON 10/13/2011, DRILLED OUT 01/13/2012.
|
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7134 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/20/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 78 | | BBLS_OIL | 101 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 78 | | CALC_BBLS_OIL | 101 | | CALC_MCF_GAS | 329 | | CASING_PRESS | 1202 | | GRAVITY_OIL | 50 | | MCF_GAS | 329 |
| | Perforation Data: | | Interval Top: | 6896 ft. | # Of Holes: | 158 | | Interval Bottom: | 7157 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 304 |
| Total Gas Produced (MCF) | 10255 |
| GOR | 33733 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.614 |
| Average MCFE per Day | 32.551 |
| Federal Financial Assurance | i | |
|
|