|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 12/1/2021 Measured TD: 8095 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 12/1/2021 | | Wellbore Permit | | | Permit #: | 011822 | Expiration Date: | 10/11/2002 | | Proposed Depth/Form: | 8100 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 316, Drill Unit: S/2 |
| | |
| Wellbore Completed | | Completion Date: | 2/5/2002 | | Spud Date: | 11/14/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 8095 ft. | Measured PB depth: | 8046 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | PLATFORM EXPRESS GR NEUTRON, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 597 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 597 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8094 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 6606 ft., Bottom: 8095 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4365 ft. | | N | N | | SHANNON | 4896 ft. | | N | N | | NIOBRARA | 7232 ft. | | N | N | | FORT HAYS | 7448 ft. | | N | N | | CODELL | 7470 ft. | | N | N | | CARLILE | 7492 ft. | | N | N | | GREENHORN | 7516 ft. | | N | N | | GRANEROS | 7744 ft. | | N | N | | BENTONITE | 7744 ft. | | N | N | | MOWRY | 7898 ft. | | N | N | | J-2 SAND | 7913 ft. | | N | N | | SKULL CREEK | 8021 ft. | | N | N |
Formation CODL Formation Classification: OG Status: CM - 4/30/2012 Interval Top: 7472 ft. Interval Bottom: 7492 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/11/2002 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/18/2012 | | Treatment Summary: | Codell Tri-frac
Frac’d 7472 - 7492 with 107,740 gal frac fluid and 180,000# sand. 01/18/12 | | Formation Treatment | | Treatment Date: | 2/5/2002 | | Treatment Summary: | SET RBP @ 7600'. PERF THE CODELL FROM 7472'-7485' W/ 4 SPF. FRAC W/150,100# 20/40 FRAC SAND IN 88,500 GALS DYNAFLOW. FLOWED BACK. REMOVE RBP. RUN PROD TBG. SWAB. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 22 | | CALC_BBLS_H2O | 12 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 15000 | | CALC_MCF_GAS | 330 | | CASING_PRESS | 560 | | MCF_GAS | 330 | | TUBING_PRESS | 180 |
| | Perforation Data: | | Interval Top: | 7472 ft. | # Of Holes: | 80 | | Interval Bottom: | 7492 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OG Status: CM - 4/30/2012 Interval Top: 7280 ft. Interval Bottom: 7966 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 2/5/2002 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/5/2002 | | Treatment Summary: | COMMINGLE; DRILLED OUT CFP @7375'. 3/23/08. DRILLED OUT CIBP @7600' TO COMMINGLE JNBCD. 3/24/2008 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7900 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/8/2012 | Test Method: | Flow | | Hours Tested: | 6 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 8 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 32 | | CALC_GOR | 13625 | | CALC_MCF_GAS | 436 | | CASING_PRESS | 539 | | GRAVITY_OIL | 51 | | MCF_GAS | 109 | | TUBING_PRESS | 240 |
| | Perforation Data: | | Interval Top: | 7280 ft. | # Of Holes: | 332 | | Interval Bottom: | 7966 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 12/1/2021 Interval Top: 7280 ft. Interval Bottom: 7492 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/26/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/15/2008 | | Treatment Summary: | RECOMPLETION: SET CIBP @ 7600'. 6/14/08. RE-FRAC CODL W/112,000 GAL FRAC FLD AND 253,740# SAND. 3/15/08. SET CFP @7375'. & FRAC NBRR W/163,400 GAL FRAC FLUID AND 253,340# SAND, 3/15/08. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7280 ft. | # Of Holes: | 120 | | Interval Bottom: | 7492 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 7/26/2012 Interval Top: 7280 ft. Interval Bottom: 7300 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/26/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/18/2012 | | Treatment Summary: | Niobrara Refrac
Frac’d 7280’ – 7300’ with 143,215 gal frac fluid and 250,660# sand. 01/18/12
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7280 ft. | # Of Holes: | 40 | | Interval Bottom: | 7300 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: SI - 12/1/2021| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/5/2002 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 19 | | BBLS_OIL | 3 | | CALC_BBLS_H2O | 19 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 110129 | | CALC_MCF_GAS | 341 | | CASING_PRESS | 440 | | MCF_GAS | 341 | | TUBING_PRESS | 260 |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 11/30/2021 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|