Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20567
Well Classification: GW Status: PR - 2/1/2025
Well Name/No:BARCLAY CRISMAN #13-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2025
FacilityID:261099LocationID:336242
County:WELD #123Location:NWSW 20 3N66W 6
Field:WATTENBERG - #90750Elevation:4921 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2163FSL  461 FWLLat/Long: 40.208936 / -104.808941Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.208940 / -104.809150Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/1/2025             Measured TD: 7993 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/1/2025
Wellbore PermitDRIFTED
Permit #:20030775 Expiration Date:5/20/2004
Proposed Depth/Form:7995 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407,407-66, Unit Acreage: 160, Drill Unit: SW/4

Wellbore Completed
Completion Date:10/17/2001
Spud Date:9/6/2001Spud Date Is:ACTUAL
Measured TD:7993 ft.Measured PB depth:7953 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL INDUCTION, COMPENSATED DENSITY, COMPENSATED NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 616 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 616 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7983 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 6600 ft., Bottom: 7983 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4333 ft.NN
SHANNON4928 ft.NN
NIOBRARA7127 ft.NN
FORT HAYS7386 ft.NN
CODELL7409 ft.NN
CARLILE7429 ft.NN
GREENHORN7465 ft.NN
GRANEROS7684 ft.NN
BENTONITE7684 ft.NN
MOWRY7836 ft.NN
J-2 SAND7852 ft.NN
SKULL CREEK7968 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  PR - 2/1/2025                  Interval Top: 7852 ft.    Interval Bottom: 7924 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/17/2001
Treatment Summary:FRAC THE JSND (7852-7924') W/550,500# 20/40 FRAC SAND IN 221,582 GAL FRAC GEL. 10/9/01
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 27
BBLS_OIL 2
CALC_BBLS_H2O 27
CALC_BBLS_OIL 2
CALC_GOR 845000
CALC_MCF_GAS 169
CASING_PRESS 350
MCF_GAS 169
TUBING_PRESS 160
Perforation Data:
Interval Top:7852 ft.# Of Holes:120
Interval Bottom:7924 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/13/2002                 Interval Top: 7408 ft.    Interval Bottom: 7428 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:10/17/2001
Treatment Summary:SET RBP. PERF CODELL FROM 7408'-7428' W/2 SPF. SET PKR@7323,RECORD. REMOVE PKR. FRAC W/300,000# 20/40 SAND IN 132,460 GALS GELLED WATER. FOW BACK FRAC. SET PKR@7375'. RECORD & FLOW BACK.
Tubing Size:2.375 in.Tubing Setting Depth:7375 ft.
Tubing Packer Depth:7375 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/13/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 9
BBLS_OIL 39
CALC_BBLS_H2O 9
CALC_BBLS_OIL 39
CALC_GOR 5119
CALC_MCF_GAS 198
CASING_PRESS 300
MCF_GAS 198
TUBING_PRESS 210
Perforation Data:
Interval Top:7408 ft.# Of Holes:40
Interval Bottom:7428 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 6/15/2002                 Interval Top: 7408 ft.    Interval Bottom: 7924 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:J-CODELLCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:10/17/2001
Treatment Summary:POOH W/TBG & PKR. DRILL CIBP TO 7922'. TIH W/PROD TBG. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:7854 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/15/2002Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 12
CALC_BBLS_H2O 11
CALC_BBLS_OIL 12
CALC_GOR 17333
CALC_MCF_GAS 208
CASING_PRESS 750
MCF_GAS 208
TUBING_PRESS 480
Perforation Data:
Interval Top:7408 ft.# Of Holes:160
Interval Bottom:7924 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 5/18/2010                 Interval Top: 7160 ft.    Interval Bottom: 7924 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:10/17/2001
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7833 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/26/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 28
CALC_BBLS_H2O 8
CALC_BBLS_OIL 28
CALC_GOR 6393
CALC_MCF_GAS 179
CASING_PRESS 575
MCF_GAS 179
TUBING_PRESS 200
Perforation Data:
Interval Top:7160 ft.# Of Holes:160
Interval Bottom:7924 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 2/1/2025                  Interval Top: 7160 ft.    Interval Bottom: 7428 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/9/2010
Treatment Summary:NIOBRARA: FRACD WITH 145740 GAL FRAC FLUID CONTAINING 250600# SAND. CODELL: FRACD WITH 120624 GAL FRAC FLUID CONTAINING 250900# SAND.
Formation Treatment
Treatment Date:10/17/2001
Treatment Summary:FRAC CODL(7408-7428')W/300,000#20/40 SAND IN 132,460 GAL GEL WTR. 7160-7330' 120 HOLES FRAC W/136,800GAL FRAC FLD & 200,200# SAND 3/10/04
Tubing Size:2.375 in.Tubing Setting Depth:7840 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/18/2010Test Method:FLOWING
Hours Tested:3Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 20
BTU_GAS 1314
CALC_BBLS_H2O 40
CALC_BBLS_OIL 160
CALC_GOR 3500
CALC_MCF_GAS 560
CASING_PRESS 532
GRAVITY_OIL 53
MCF_GAS 70
TUBING_PRESS 238
Perforation Data:
Interval Top:7160 ft.# Of Holes:0
Interval Bottom:7428 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)398
GOR
GOR DeterminationMCFE
Average BOE per Day0.192
Average MCFE per Day1.089

 Federal Financial Assurance  i 

 Tribal Well  i No