|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/1/2021 Measured TD: 8107 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/1/2021 | | Wellbore Permit | | | Permit #: | 20022186 | Expiration Date: | 11/25/2003 | | Proposed Depth/Form: | 8107 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A/232 , Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 225, Top: 4100 ft., Bottom: 5100 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/2/2001 | | Spud Date: | 8/27/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 8107 ft. | Measured PB depth: | 8091 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DUAL INDUCITON, COMPENSATED DENSITY, COMPENSATED NEUTRON CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 575 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 575 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8109 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 6750 ft., Bottom: 8109 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5113 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 3800 ft., Bottom: 5113 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4287 ft. | | N | N | | SHANNON | 4845 ft. | | N | N | | NIOBRARA | 7240 ft. | | N | N | | FORT HAYS | 7506 ft. | | N | N | | CODELL | 7526 ft. | | N | N | | CARLILE | 7549 ft. | | N | N | | GREENHORN | 7593 ft. | | N | N | | GRANEROS | 7785 ft. | | N | N | | BENTONITE | 7785 ft. | | N | N | | MOWRY | 7941 ft. | | N | N | | J-2 SAND | 7955 ft. | | N | N | | SKULL CREEK | 8047 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 2/1/2021 Interval Top: 7968 ft. Interval Bottom: 8000 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/2/2001 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 36 | | BBLS_OIL | 1 | | CALC_BBLS_H2O | 36 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 220000 | | CALC_MCF_GAS | 154 | | CASING_PRESS | 360 | | MCF_GAS | 154 | | TUBING_PRESS | 180 |
| | Perforation Data: | | Interval Top: | 7968 ft. | # Of Holes: | 64 | | Interval Bottom: | 8000 ft. | Hole Size: | 0.3 in. |
|
Formation CODL Formation Classification: GW Status: CM - 4/19/2003 Interval Top: 7527 ft. Interval Bottom: 7571 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | 0.941 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/2/2001 | | Treatment Summary: | SET RBP @ 7650'. PERF'D THE CODELL FROM 7527 - 7548' W/ 4 SPF. FRAC'D W/ 120,498 GAL DYNAFLOW-2 CROSSLINKED GEL CONTAINING 300,300# 20/40 SAND. FLOW BACK WELL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/19/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 21 | | CALC_BBLS_H2O | 13 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 3286 | | CALC_MCF_GAS | 69 | | CASING_PRESS | 150 | | MCF_GAS | 69 |
| | Perforation Data: | | Interval Top: | 7527 ft. | # Of Holes: | 84 | | Interval Bottom: | 7571 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 5/20/2003 Interval Top: 7527 ft. Interval Bottom: 8000 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.941 in. | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | FOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/2/2001 | | Treatment Summary: | REL RBP. RIH W/PROD TBG. SWAB |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7964 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/20/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 21 | | CALC_BBLS_H2O | 13 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 3286 | | CALC_MCF_GAS | 69 | | CASING_PRESS | 150 | | MCF_GAS | 69 |
| | Perforation Data: | | Interval Top: | 7527 ft. | # Of Holes: | 148 | | Interval Bottom: | 8000 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 11/2/2009 Interval Top: 7310 ft. Interval Bottom: 8000 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/2/2001 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE, DRILLED UP CBP'S TO COMMINGLE THE JSND-NBRR-CDL. 10-26-09 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7941 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/2/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 9 | | BTU_GAS | 1224 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 9 | | CALC_GOR | 14222 | | CALC_MCF_GAS | 128 | | CASING_PRESS | 448 | | GRAVITY_OIL | 51 | | MCF_GAS | 128 | | TUBING_PRESS | 311 |
| | Perforation Data: | | Interval Top: | 7310 ft. | # Of Holes: | 208 | | Interval Bottom: | 8000 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 2/1/2021 Interval Top: 7310 ft. Interval Bottom: 7548 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/2/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/19/2009 | | Treatment Summary: | NBRR-CDL REFRAC AND RECOMPLETION, SET CBP @ 7630'. 10-15-09. RE-FRAC'D THE CODELL WITH 251,000# 20/40 SAND IN 121,380 GALS OF VISTAR 24 X-LINKED GEL. 1945 SLF. 10-19-09. SET CBP @ 7430. FRAC'D THE NIOBRARA WITH 250,980# 20/40 SAND IN 146,580 GALS OF |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7310 ft. | # Of Holes: | 144 | | Interval Bottom: | 7548 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 121 |
| Total Gas Produced (MCF) | 7236 |
| GOR | 59801 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.774 |
| Average MCFE per Day | 21.866 |
| Federal Financial Assurance | i | |
|
|