Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20449
Well Classification: GW Status: SI - 7/1/2021
Well Name/No:HSR-MILLER #9-5A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2021
FacilityID:260299LocationID:332908
County:WELD #123Location:NESE 5 1N67W 6
Field:WATTENBERG - #90750Elevation:5017 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2080FSL  560 FELLat/Long: 40.078422 / -104.907181Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.078420 / -104.907180Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/28/2012
End Date: 2/28/2012
Reported: 3/22/2012
Prior to rule 205A.b.(2)(A)
Days to report: 23
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 7/1/2021             Measured TD: 8271 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 7/1/2021
Wellbore Permit
Permit #: Expiration Date:8/17/2012
Proposed Depth/Form:8271 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2SE
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: N/2SE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 731 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 515, Top: 0 ft., Bottom: 731 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8258 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 250, Top: 6730 ft., Bottom: 8258 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5404 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 230, Top: 4614 ft., Bottom: 5406 ft.

Wellbore Completed
Completion Date:12/6/2001
Spud Date:11/7/2001Spud Date Is:ACTUAL
Measured TD:8271 ft.Measured PB depth:8228 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 731 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 515, Top: 0 ft., Bottom: 731 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8258 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 6730 ft., Bottom: 8258 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5404 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 4614 ft., Bottom: 5406 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4538 ft.NN
SHANNON5146 ft.NN
NIOBRARA7358 ft.NN
FORT HAYS7642 ft.NN
CODELL7663 ft.NN
J SAND8101 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  TA - 2/1/2017                  Interval Top: 8116 ft.    Interval Bottom: 8144 ft.

 Completed Information for Formation J SAND
1st Production Date:1/2/2002Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/2/2012
Treatment Summary:SET SAND PLUG @ 8000-8228
Formation Treatment
Treatment Date:12/6/2001
Treatment Summary:NO ADDITIONAL TREATMENT
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 1
CALC_BBLS_OIL 1
CALC_GOR 224000
CALC_MCF_GAS 224
CASING_PRESS 380
GRAVITY_OIL 60
MCF_GAS 224
TUBING_PRESS 325
Perforation Data:
Interval Top:8116 ft.# Of Holes:60
Interval Bottom:8144 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 4/9/2012                  Interval Top: 7666 ft.    Interval Bottom: 7684 ft.

 Completed Information for Formation CODELL
1st Production Date:3/5/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/28/2012
Treatment Summary:CDL REPERF (2/7/12) 7678-7684 HOLES 18 SIZE .38 Refrac CODL down 4.5" casing w/ 206,936 gal slickwater w/ 150,100# 40/70, 4,000# 20/40.
Formation Treatment
Treatment Date:2/14/2008
Treatment Summary:167,000 GALS SLICKWATER; 120,000# 40/70 SAND; 4,000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7666 ft.# Of Holes:66
Interval Bottom:7684 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 4/22/2008                 Interval Top: 7666 ft.    Interval Bottom: 8144 ft.

 Completed Information for Formation J-CODELL
1st Production Date:3/24/2008Choke Size:0.281 in.
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/6/2001
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:8228 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/22/2008Test Method:FLOWING
Hours Tested:Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1163
CALC_BBLS_OIL 27
CALC_GOR 7407
CALC_MCF_GAS 200
CASING_PRESS 600
GRAVITY_OIL 51
TUBING_PRESS 500
Perforation Data:
Interval Top:7666 ft.# Of Holes:108
Interval Bottom:8144 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 7/1/2021                  Interval Top: 7440 ft.    Interval Bottom: 7684 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/5/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/28/2012
Treatment Summary:CDRF-NBREC
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/5/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 7
BTU_GAS 1237
CALC_BBLS_OIL 7
CALC_GOR 14571
CALC_MCF_GAS 102
CASING_PRESS 993
GRAVITY_OIL 49
MCF_GAS 102
Perforation Data:
Interval Top:7440 ft.# Of Holes:138
Interval Bottom:7684 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/15/2012                 Interval Top: 7440 ft.    Interval Bottom: 7542 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/5/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/28/2012
Treatment Summary:Frac NBRR down 4.5" casing w/ 250 gal 15% HCl & 237,090 gal slickwater w/ 200,540# 40/70, 4,000# 20/40.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7440 ft.# Of Holes:72
Interval Bottom:7542 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
06/30/2021
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No