|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 8/14/2019 Measured TD: 8560 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 8/14/2019 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 5/24/2014 | | Proposed Depth/Form: | 8560 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2NE | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2NE | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2NE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1405 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 900, Top: 0 ft., Bottom: 1405 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8535 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 640, Top: 4290 ft., Bottom: 8535 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/2/2006 | | Spud Date: | 7/27/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 8560 ft. | Measured PB depth: | 8519 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR/CCL/CBL, DIL/GR, CDL/CNL/ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1405 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 900, Top: 0 ft., Bottom: 1405 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8535 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 640, Top: 4290 ft., Bottom: 8535 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4860 ft. | | N | N | | NIOBRARA | 7361 ft. | | N | N | | FORT HAYS | 7737 ft. | | N | N | | CODELL | 7757 ft. | | N | N | | J SAND | 8198 ft. | | N | N | | DAKOTA | 8384 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 8/14/2019 Interval Top: 8450 ft. Interval Bottom: 8466 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | 9/13/2006 | Choke Size: | 0.375 in. | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/28/2006 | | Treatment Summary: | FRAC'D DAKOTA W/ 28,434 GALS OF PUREGEL 30# GEL & 3000#'S 100 MESH & 54,080#'S 20/40 OTTAWA SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8433 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/24/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 12 | | BTU_GAS | 1250 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 0 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 750 | | GRAVITY_OIL | 55 | | MCF_GAS | 0 | | TUBING_PRESS | 650 |
| | Perforation Data: | | Interval Top: | 8450 ft. | # Of Holes: | 64 | | Interval Bottom: | 8466 ft. | Hole Size: | 0.42 in. |
|
Formation DK-J Formation Classification: GW Status: CM - 5/9/2007 Interval Top: 8197 ft. Interval Bottom: 8466 ft.| Completed Information for Formation DAKOTA-JSND | | 1st Production Date: | 4/25/2007 | Choke Size: | 0.313 in. | | Formation Name: | DAKOTA-JSND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/2/2006 | | Treatment Summary: | COMMINGLE DAKOTA & J SAND. DAKOTA PRODUCING THROUGH A FLOW THROUGH FRAC PLUG SET @ 8275'. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8179 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/9/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 19 | | BBLS_OIL | 19 | | BTU_GAS | 1250 | | CALC_BBLS_H2O | 19 | | CALC_BBLS_OIL | 19 | | CALC_GOR | 4579 | | CALC_MCF_GAS | 87 | | CASING_PRESS | 750 | | GRAVITY_OIL | 51 | | MCF_GAS | 87 | | TUBING_PRESS | 420 |
| | Perforation Data: | | Interval Top: | 8197 ft. | # Of Holes: | 116 | | Interval Bottom: | 8466 ft. | Hole Size: | 0.42 in. |
|
Formation JSND Formation Classification: GW Status: AB - 8/14/2019 Interval Top: 8197 ft. Interval Bottom: 8224 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/25/2007 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/18/2007 | | Treatment Summary: | FRAC'D JSND W/ 138,600 GALS SILVERSTIM 24# GEL & 435,020# 20/40 OTTAWA SAND & 12,000# AC-FRAC SB EXCEL 16/30 MESH PROPPANT (447,020# TOTAL). |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8197 ft. | # Of Holes: | 52 | | Interval Bottom: | 8224 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 8/28/2013 Interval Top: 7760 ft. Interval Bottom: 7772 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/11/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/9/2012 | Treatment End Date: | 7/9/2012 | | Treatment Summary: | FRAC'D W/129494 GAL VISTAR, SLICK WATER, 500 GAL 15% HCL AND 253266# OTTAWA SAND. 6/21/2012 CIFTP SET @7838' | | Total fluid used in treatment (bbls): | 3083 | Max pressure during treatment (psi): | 4173 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.77 | | Recycled water used in treatment (bbls): | 264 | Total flowback volume recovered (bbls): | 2222 | | Fresh water used in treatment (bbls): | 2819 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 253266 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7760 ft. | # Of Holes: | 48 | | Interval Bottom: | 7772 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/14/2019 Interval Top: 7528 ft. Interval Bottom: 7772 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/11/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/16/2012 | Treatment End Date: | N/A | | Treatment Summary: | COMMINGLE NB & CD | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7735 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/16/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 48 | | BBLS_OIL | 24 | | BTU_GAS | 1215 | | CALC_BBLS_H2O | 48 | | CALC_BBLS_OIL | 24 | | CALC_GOR | 2417 | | CALC_MCF_GAS | 58 | | GRAVITY_OIL | 46 | | MCF_GAS | 58 |
| | Perforation Data: | | Interval Top: | 7528 ft. | # Of Holes: | 96 | | Interval Bottom: | 7772 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OG Status: CM - 8/28/2013 Interval Top: 7528 ft. Interval Bottom: 7610 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/11/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/9/2012 | Treatment End Date: | N/A | | Treatment Summary: | PERF'D 7258-7540, 7540-7610 FRAC'D W/168424 GAL VISTAR AND 252760# OTTAWA SAND | | Total fluid used in treatment (bbls): | 4010 | Max pressure during treatment (psi): | 4602 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.80 | | Recycled water used in treatment (bbls): | 276 | Total flowback volume recovered (bbls): | 2222 | | Fresh water used in treatment (bbls): | 3734 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 252760 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7528 ft. | # Of Holes: | 48 | | Interval Bottom: | 7610 ft. | Hole Size: | 0.72 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/14/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|