Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20384
Well Classification: GW Status: SI - 4/1/2021
Well Name/No:SHELEY #13-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date4/1/2021
FacilityID:259829LocationID:331252
Municipality/County:FIRESTONE / WELD #123Location:NWSW 4 2N67W 6
Field:WATTENBERG - #90750Elevation:4889 ft.
Planned Location:2180FSL  460 FWLLat/Long: 40.166006 / -104.903014Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.166167 / -104.902773Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 4/1/2021             Measured TD: 7995 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 4/1/2021
Wellbore PermitDRIFTED
Permit #:20021182 Expiration Date:4/15/2002
Proposed Depth/Form:
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-466 , Unit Acreage: 160, Drill Unit: SW/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: , Weight: 24 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: , Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/5/2001
Spud Date:5/8/2001Spud Date Is:ACTUAL
Measured TD:7995 ft.Measured PB depth:7964 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:DUAL INDUCTION,COMPENSATED DENSITY,COMPENSATED NEU.
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 408 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 408 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7979 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 270, Top: 6478 ft., Bottom: 7979 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 1700 ft., Bottom: 1700 ft., Sacks: 570, Method: 1 INCH
Additional Cement:String Type: 1ST , Top: 4450 ft., Depth: 5100 ft., Bottom: 5100 ft., Sacks: 245, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
SUSSEX4271 ft.NN
SHANNON4809 ft.NN
NIOBRARA7134 ft.NN
FORT HAYS7370 ft.NN
CODELL7392 ft.NN
CARLILE7409 ft.NN
GREENHORN7436 ft.NN
GRANEROS7661 ft.NN
BENTONITE7661 ft.NN
MOWRY7814 ft.NN
J-2 SAND7829 ft.NN
SKULL CREEK7941 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  SI - 4/1/2021                  Interval Top: 7832 ft.    Interval Bottom: 7894 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/5/2001
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 2
CALC_BBLS_H2O 11
CALC_BBLS_OIL 1
CALC_GOR 242421
CALC_MCF_GAS 201
CASING_PRESS 470
MCF_GAS 478
TUBING_PRESS 350
Perforation Data:
Interval Top:7832 ft.# Of Holes:108
Interval Bottom:7894 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/12/2002                 Interval Top: 7442 ft.    Interval Bottom: 7462 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/5/2001
Treatment Summary:SET CIBP @ 7500'. PERF THE CODELL FROM 7398'-7408' W/4 SPF. FRAC W/308,000# 20/40 SAND AND 131,500 GALS DYNAFLOW-2 FRAC FLUID. FLOW BACK WELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/12/2002Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 22
BBLS_OIL 42
CALC_BBLS_H2O 22
CALC_BBLS_OIL 42
CALC_GOR 6190
CALC_MCF_GAS 260
CASING_PRESS 260
MCF_GAS 260
Perforation Data:
Interval Top:7442 ft.# Of Holes:
Interval Bottom:7462 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 10/11/2002                Interval Top: 7398 ft.    Interval Bottom: 7894 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:J-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/5/2001
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7811 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/11/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 28
BBLS_OIL 40
CALC_BBLS_H2O 28
CALC_BBLS_OIL 40
CALC_GOR 13275
CALC_MCF_GAS 531
CASING_PRESS 720
MCF_GAS 531
TUBING_PRESS 440
Perforation Data:
Interval Top:7398 ft.# Of Holes:148
Interval Bottom:7894 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 8/7/2007                  Interval Top: 7187 ft.    Interval Bottom: 7894 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:8/5/2007Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/5/2001
Treatment Summary:JSNA-NBRR-CODL COMMINGLE.DRILLED OUT CFP @7330' AND CBP @ 7500' TO COMMINGLE THE JNBCD 8/2/2007
Tubing Size:2.375 in.Tubing Setting Depth:7809 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/7/2007Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 26
BBLS_OIL 28
BTU_GAS 1311
CALC_BBLS_H2O 26
CALC_BBLS_OIL 28
CALC_GOR 5000
CALC_MCF_GAS 140
CASING_PRESS 749
GRAVITY_OIL 50
MCF_GAS 140
TUBING_PRESS 163
Perforation Data:
Interval Top:7187 ft.# Of Holes:226
Interval Bottom:7894 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 4/1/2021                  Interval Top: 7187 ft.    Interval Bottom: 7412 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/19/2007
Treatment Summary:SET CBP @7500' 7/18/2007. FRAC CDL W/148,680 GAL CROSSLIND DF2-WR AND 245,700# 20/40 SAND.7/19/2007; SET CFP @7330'. FRAC NBRR W/175,350 GAL FLUID AND 250,280# 20/40 SAND. 7/19/2007
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7187 ft.# Of Holes:118
Interval Bottom:7412 ft.Hole Size:0.41 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
03/31/2021
Low ProducingYProduction Period
05/2024 - 04/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No