|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 7/21/2022 Measured TD: 7550 ft. Vertical TD: 7550 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 7/21/2022 | | Wellbore Permit | DRIFTED | | Permit #: | 010621 | Expiration Date: | 4/5/2002 | | Proposed Depth/Form: | 7475 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 318A , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 318A , Unit Acreage: 320, Drill Unit: E/2 |
| | |
| Wellbore Completed | | Completion Date: | 12/11/2001 | | Spud Date: | 11/25/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 7550 ft. | Measured PB depth: | 7476 ft. | | True Vertical TD: | 7550 ft. | True Vertical PB depth: | 7476 ft. | | Log Types: | GR, IND, DENSITY, NEUTRON, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 455 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 455 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7476 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 5762 ft., Bottom: 7476 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5300 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 2836 ft., Bottom: 5300 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2420 ft. | | N | N | | PARKMAN | 3440 ft. | | N | N | | SUSSEX | 3935 ft. | | N | N | | SHANNON | 4305 ft. | | N | N | | NIOBRARA | 6280 ft. | | N | N | | FORT HAYS | 6520 ft. | | N | N | | CODELL | 6568 ft. | | N | N | | CARLILE | 6586 ft. | | N | N | | GREENHORN | 6632 ft. | | N | N | | J SAND | 7020 ft. | | N | N | | DAKOTA | 7292 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 5/7/2002 Interval Top: 7317 ft. Interval Bottom: 7327 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | 1/17/2002 | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/11/2001 | | Treatment Summary: | 12/11/2001 BJ SERVICES FRACED WITH 914 BBL OF VISTAOR 18 GEL, 42000 # 20/40 MESH. AND 80000# OF 20/40 TEMP DC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 67 | | CALC_BBLS_H2O | 67 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 500 | | MCF_GAS | 0 | | TUBING_PRESS | 80 |
| | Perforation Data: | | Interval Top: | 7317 ft. | # Of Holes: | 12 | | Interval Bottom: | 7327 ft. | Hole Size: | 0.34 in. |
|
Formation JSND Formation Classification: GW Status: AB - 7/21/2022 Interval Top: 7033 ft. Interval Bottom: 7043 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/22/2002 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 10/17/2022 | Treatment End Date: | N/A | | Treatment Summary: | May 8th 2002: Frac’d the J Sand with 1855 bbl Vistar 20# fluid system, 176620# 20/40 mesh white sand and 2000# 14/30 mesh FlexSand MSE in the last 16000# of sand pumped. Breakdown @ 1856 psig; MTP – 1548 psig; ATP – 835 psig; AIR – 14.1 bpm; 4 ppa sand; ISIP – 1172; flushed with 110.5 bbl. Open well to tank on 12/64 choke. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7033 ft. | # Of Holes: | 20 | | Interval Bottom: | 7043 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/21/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|