Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20256
Well Classification: GW Status: PR - 2/1/2021
Well Name/No:DOWDY #33-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2021
FacilityID:259006LocationID:331168
County:WELD #123Location:NWSE 10 2N65W 6
Field:WATTENBERG - #90750Elevation:4863 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2180FSL  2180 FELLat/Long: 40.151943 / -104.648297Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.151943 / -104.648297Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/14/2011
End Date: 10/14/2011
Reported: 2/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 125
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/1/2021             Measured TD: 7875 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/1/2021
Wellbore Permit
Permit #: Expiration Date:10/11/2013
Proposed Depth/Form:7875 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 875 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 615, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7870 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 340, Top: 6020 ft., Bottom: 7870 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: 4836 ft., Depth: 4836 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 215, Top: 4130 ft., Bottom: 4836 ft.

Wellbore Completed
Completion Date:4/20/2001
Spud Date:2/19/2001Spud Date Is:ACTUAL
Measured TD:7875 ft.Measured PB depth:7854 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY, COMPENSATED NEUTRON GR; DUAL INDUCTION GUARD LOG GR; GR-CBL TEMP SURVEY; RUN #2 GR-CCL CBL VDL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 875 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 615, Top: 0 ft., Bottom: , Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7870 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 6020 ft., Bottom: 7870 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4836 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 215, Top: 4130 ft., Bottom: 4832 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4457 ft.
SHANNON4993 ft.NN
NIOBRARA6859 ft.NN
FORT HAYS7115 ft.NN
CODELL7139 ft.NN
CARLILE7156 ft.NN
GREENHORN7184 ft.NN
GRANEROS7423 ft.NN
BENTONITE7423 ft.NN
MOWRY7573 ft.NN
J-2 SAND7589 ft.NN
SKULL CREEK7720 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  PR - 2/1/2021                  Interval Top: 7598 ft.    Interval Bottom: 7660 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/14/2011
Treatment Summary:CIBP SET AT 7190’ 10/14/2011. THE J-SAND IS TA IN ORDER TO TEST THE NBRR/CD.
Formation Treatment
Treatment Date:4/20/2001
Treatment Summary:FRAC WELL W/550940#, 20/40 FRAC SAND 1 PPG THRU 5 PPG. 221429 GALS FRACGEL 22# HT, & 20# GELS.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 52
BBLS_OIL 2
CALC_GOR 223500
CASING_PRESS 500
MCF_GAS 447
TUBING_PRESS 300
Perforation Data:
Interval Top:7598 ft.# Of Holes:120
Interval Bottom:7660 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 2/1/2021                  Interval Top: 6883 ft.    Interval Bottom: 7155 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/14/2011
Treatment Summary:NIOBRARA PERFS – 6883-6920’, 4 SPF, 148 HOLES. FRAC’D W/138,455 GALS FRAC FLUID AND 250,425 # SAND (10/14/2011). CODELL PERFS - 7140’-7155’, 2 SPF, 30 HOLES. FRAC'D W/116,563 GALS FLUID AND 250,425# SAND (10/14/2011). CIBP SET AT 7190’ 10/13/2011. CFP SET @ 6970’ 10/14/2011,
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/20/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 45
BBLS_OIL 45
BTU_GAS 1
CALC_BBLS_H2O 45
CALC_BBLS_OIL 45
CALC_MCF_GAS 289
CASING_PRESS 690
GRAVITY_OIL 50
MCF_GAS 289
Perforation Data:
Interval Top:6883 ft.# Of Holes:178
Interval Bottom:7155 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)187
Total Gas Produced (MCF)12462
GOR66641
GOR DeterminationMCFE
Average BOE per Day6.398
Average MCFE per Day37.103

 Federal Financial Assurance  i 

 Tribal Well  i No