Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20215
Well Classification: GW Status: PA - 11/10/2025
Well Name/No:TOWNSEND #44-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/10/2025
FacilityID:258813LocationID:331138
County:WELD #123Location:SESE 5 2N67W 6
Field:WATTENBERG - #90750Elevation:4903 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:611FSL  490 FELLat/Long: 40.161726 / -104.906454Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.161856 / -104.906163Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/10/2025             Measured TD: 8040 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/10/2025
Wellbore PermitDRIFTED
Permit #:001500 Expiration Date:12/18/2001
Proposed Depth/Form:8030 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 80, Drill Unit: E2SE
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:4/6/2001
Spud Date:3/1/2001Spud Date Is:ACTUAL
Measured TD:8040 ft.Measured PB depth:8011 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY,COMPENSATED NEUTRON GR DUAL INDUCTION GUARD LOG GR;CBL GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 437 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 437 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8027 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 6560 ft., Bottom: 8027 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4288 ft.NN
SHANNON4822 ft.NN
NIOBRARA7148 ft.NN
FORT HAYS7397 ft.NN
CODELL7420 ft.NN
CARLILE7443 ft.NN
GREENHORN7453 ft.NN
BENTONITE7676 ft.NN
GRANEROS7677 ft.NN
MOWRY7827 ft.NN
J-2 SAND7843 ft.NN
SKULL CREEK7949 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 11/10/2025                Interval Top: 7848 ft.    Interval Bottom: 7902 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/6/2001
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 28
BBLS_OIL 1
CALC_BBLS_H2O 28
CALC_BBLS_OIL 1
CALC_GOR 155385
CALC_MCF_GAS 202
CASING_PRESS 380
MCF_GAS 202
TUBING_PRESS 210
Perforation Data:
Interval Top:7848 ft.# Of Holes:92
Interval Bottom:7902 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/21/2025                 Interval Top: 7420 ft.    Interval Bottom: 7444 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/8/2009
Treatment Summary:did not reperf Codell for 2009 refrac.
Formation Treatment
Treatment Date:4/6/2001
Treatment Summary:FRAC W/ 301,160# 2/40 FRAC SAND IN 128,703 FAL FDP -S629-01, 22# & 20# FLOW BACK FRAC
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 9
BBLS_OIL 32
CALC_BBLS_H2O 9
CALC_BBLS_OIL 32
CALC_GOR 2781
CALC_MCF_GAS 89
CASING_PRESS 200
MCF_GAS 89
Perforation Data:
Interval Top:7420 ft.# Of Holes:80
Interval Bottom:7444 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 3/29/2002                 Interval Top: 7420 ft.    Interval Bottom: 7902 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:J-CODELLCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/6/2001
Treatment Summary:DRILL OUT CIBP. RUN PROD TBG. FLOW BACK WELL
Tubing Size:2.375 in.Tubing Setting Depth:7837 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/29/2002Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 17
CALC_BBLS_H2O 15
CALC_BBLS_OIL 17
CALC_GOR 16793
CALC_MCF_GAS 292
CASING_PRESS 470
MCF_GAS 292
TUBING_PRESS 190
Perforation Data:
Interval Top:7420 ft.# Of Holes:140
Interval Bottom:7902 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/10/2025                Interval Top: 7200 ft.    Interval Bottom: 7444 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/7/2009
Treatment Summary:NB/CD RECOMPLETION; SET CBP @ 7500. 1/5/09. SET CBP @ 7488 1/6/09. RE-FRAC'D CD W/112,686 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,800# SAND. 1/7/09. SET CFP @7300. DRILLED OUT CFP @ 7300 TO COMMINGLE THE NB/CD 1/12/09
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 67
BBLS_OIL 47
BTU_GAS 1193
CALC_BBLS_H2O 67
CALC_BBLS_OIL 47
CALC_GOR 6106
CALC_MCF_GAS 287
CASING_PRESS 864
GRAVITY_OIL 55
MCF_GAS 287
TUBING_PRESS 546
Perforation Data:
Interval Top:7200 ft.# Of Holes:120
Interval Bottom:7444 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/24/2025                 Interval Top: 7200 ft.    Interval Bottom: 7220 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7200 ft.# Of Holes:40
Interval Bottom:7220 ft.Hole Size:0.71 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/10/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2027
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No