|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/29/2019 Measured TD: 7950 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/29/2019 | | Wellbore Permit | DRIFTED | | Permit #: | 001454 | Expiration Date: | 12/13/2001 | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 80, Drill Unit: W2NW | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 |
| | |
| Wellbore Completed | | Completion Date: | 4/27/2001 | | Spud Date: | 3/10/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 7950 ft. | Measured PB depth: | 7930 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CD, CN/GR DUAL IND. GUARD LOG GR, CBL VDL GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 762 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 762 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7930 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6360 ft., Bottom: 7930 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4316 ft. | | N | N | | SHANNON | 4548 ft. | | N | N | | NIOBRARA | 7133 ft. | | N | N | | FORT HAYS | 7372 ft. | | N | N | | CODELL | 7393 ft. | | N | N | | CARLILE | 7415 ft. | | N | N | | GREENHORN | 7443 ft. | | N | N | | GRANEROS | 7664 ft. | | N | N | | BENTONITE | 7664 ft. | | N | N | | MOWRY | 7816 ft. | | N | N | | J-2 SAND | 7829 ft. | | N | N | | SKULL CREEK | 7918 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 4/29/2019 Interval Top: 7832 ft. Interval Bottom: 7890 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/27/2001 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BBLS_OIL | 2 | | CALC_BBLS_H2O | 25 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 282000 | | CALC_MCF_GAS | 564 | | CASING_PRESS | 280 | | MCF_GAS | 564 | | TUBING_PRESS | 260 |
| | Perforation Data: | | Interval Top: | 7832 ft. | # Of Holes: | 96 | | Interval Bottom: | 7890 ft. | Hole Size: | 0.425 in. |
|
Formation CODL Formation Classification: GW Status: CM - 3/19/2019 Interval Top: 7394 ft. Interval Bottom: 7414 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/27/2001 | | Treatment Summary: | FRAC W/300,400# 20/40 SAND IN 118,655 GALS PHOENIX GEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 20 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 4200 | | CALC_MCF_GAS | 84 | | CASING_PRESS | 170 | | MCF_GAS | 84 |
| | Perforation Data: | | Interval Top: | 7394 ft. | # Of Holes: | 40 | | Interval Bottom: | 7414 ft. | Hole Size: | 0.375 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 2/2/2009 Interval Top: 7394 ft. Interval Bottom: 7890 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.313 in. | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/27/2001 | | Treatment Summary: | DRILL OUT CIBP. RUN PROD TBG. SWAB WELL BACK |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/10/2002 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 17 | | BBLS_OIL | 21 | | CALC_BBLS_H2O | 17 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 29000 | | CALC_MCF_GAS | 595 | | CASING_PRESS | 460 | | MCF_GAS | 595 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 7394 ft. | # Of Holes: | 136 | | Interval Bottom: | 7890 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/29/2019 Interval Top: 7182 ft. Interval Bottom: 7414 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/28/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/27/2001 | | Treatment Summary: | NB/CD COMMINGLE; DRILLED OUT CFP@ 7280 AND TO COMMINGLE THE NB/CD. 1/28/09 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 2 | | BTU_GAS | 1281 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 9000 | | CALC_MCF_GAS | 18 | | CASING_PRESS | 1303 | | GRAVITY_OIL | 50 | | MCF_GAS | 18 | | TUBING_PRESS | 100 |
| | Perforation Data: | | Interval Top: | 7182 ft. | # Of Holes: | 76 | | Interval Bottom: | 7414 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 3/19/2019 Interval Top: 7182 ft. Interval Bottom: 7200 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/12/2009 | | Treatment Summary: | NB/CD RECOMPLETION; SET CIBP@ 7510. 1/6/09 RE-FRAC'D THE CD W/112,686 GAL 24# VISTAR HYBRID CROSSLINKED GEL CONTAINING 250,800# SAND 1/12/09; SET CFP @7280,1/12/09 FRAC'D NB W/140539 GAL 18# VISTAR CROSSLINKED GEL W/250,040# SAND 1/12/09 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7182 ft. | # Of Holes: | 36 | | Interval Bottom: | 7200 ft. | Hole Size: | 0.425 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/29/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|