Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20192
Well Classification: GW Status: SI - 1/1/2025
Well Name/No:VICTORIA U #1-12JI
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2025
FacilityID:258724LocationID:331120
Municipality/County:FIRESTONE / WELD #123Location:NWSW 1 2N68W 6
Field:WATTENBERG - #90750Elevation:4834 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2180FSL  791 FWLLat/Long: 40.166396 / -104.958336Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.166571 / -104.958086Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 1/1/2025             Measured TD: 5995 ft.    Vertical TD: 5862 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 1/1/2025
Wellbore Permit
Permit #:20061247 Expiration Date:4/12/2007
Proposed Depth/Form:7922 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 60, Drill Unit: SW4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318 , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SW4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 543 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 255, Top: 0 ft., Bottom: 543 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7889 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 6690 ft., Bottom: 7889 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4910 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 190, Top: 4060 ft., Bottom: 4915 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:3/9/2005Spud Date Is:ACTUAL
Measured TD:5995 ft.Measured PB depth:5956 ft.
True Vertical TD:5862 ft.True Vertical PB depth:5823 ft.
Top PZ Location:Sec:1 Twp: 10S 95WFootage: 677 FNL  615 FEL
Bottom Hole Location:Sec:1 Twp: 10S 95WFootage: 684 FNL  638 FEL
Log Types:DIL, GR, CALIPER, SP/MICROLOG COM.DENSITY/NEUTRON
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1220 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1220 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5995 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1200, Top: 1150 ft., Bottom: 5995 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4910 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 4060 ft., Bottom: 4915 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 825 ft., Depth: 1600 ft., Bottom: 1600 ft., Sacks: 280, Method: PERF & PUMP
FormationInterval TopLog BottomCoredDSTs
SUSSEX4132 ft.NN
SHANNON4626 ft.NN
NIOBRARA7026 ft.NN
FORT HAYS7286 ft.NN
CODELL7306 ft.NN
J SAND7740 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  SI - 1/1/2025                  Interval Top: 7744 ft.    Interval Bottom: 7780 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size:0.281 in.
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/11/2005
Treatment Summary:RE-FRAC JSND W/4,495 GAL DYNAFLOW 111 AND 7,640# 16/30 AC-FRAC SB EXCEL, 4/19/05.
Tubing Size:2.375 in.Tubing Setting Depth:7724 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/11/2005Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 1
BTU_GAS 1150
CALC_BBLS_H2O 6
CALC_BBLS_OIL 1
CALC_GOR 72000
CALC_MCF_GAS 72
CASING_PRESS 700
GRAVITY_OIL 56
MCF_GAS 72
TUBING_PRESS 600
Perforation Data:
Interval Top:7744 ft.# Of Holes:64
Interval Bottom:7780 ft.Hole Size:0.34 in.

Formation CODL                     Formation Classification:  GW                     Status:  SI - 1/1/2025                  Interval Top: 7308 ft.    Interval Bottom: 7326 ft.

 Completed Information for Formation CODELL
1st Production Date:8/21/2006Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/18/2006
Treatment Summary:FRAC'D WITH 127,470 GALS OF VISTAR W 22# GALS LOADINGS AND 270,620# OF 20/40 OTTAWA SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 14
CALC_GOR 3643
CASING_PRESS 1800
MCF_GAS 51
TUBING_PRESS 1000
Perforation Data:
Interval Top:7308 ft.# Of Holes:72
Interval Bottom:7326 ft.Hole Size:0.42 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 4/30/2007                 Interval Top: 7308 ft.    Interval Bottom: 7780 ft.

 Completed Information for Formation J-CODELL
1st Production Date:4/20/2007Choke Size:0.313 in.
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/25/2005
Treatment Summary:COMMINGLE WITH JSND AND CODL.
Tubing Size:2.375 in.Tubing Setting Depth:7716 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2007Test Method:FLOWING
Hours Tested:12Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 33
BTU_GAS 1147
CALC_BBLS_H2O 36
CALC_BBLS_OIL 66
CALC_GOR 20909
CALC_MCF_GAS 1380
CASING_PRESS 520
MCF_GAS 690
TUBING_PRESS 460
Perforation Data:
Interval Top:7308 ft.# Of Holes:136
Interval Bottom:7780 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)2
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.005

 Federal Financial Assurance  i 

 Tribal Well  i No